5905 W WILSHIRE BLVD special-exhibit 90036

Certificate Information: 5905 W WILSHIRE BLVD special-exhibit 90036

Application / Permit
08010-10000-01363
Plan Check / Job No.
B08LA04866
Group
Building
Type
Bldg-Addition
Sub-Type
Commercial
Primary Use
(4) Museum for profit
Work Description
New museum over an existing parking structure
Permit Issued
Issued on 9/29/2008
Issuing Office
Metro
Current Status
CofO Corrected on 11/8/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 6/3/2008 APPLICANT
Assigned to Plan Check Engineer 6/6/2008 SEAN DANG
Corrections Issued 7/13/2008 SEAN DANG
Building Plans Picked Up 7/16/2008 APPLICANT
Quality Review Completed 9/25/2008 CATHERINE NUEZCA GABA
Plan Check Approved 9/26/2008 SEAN DANG
Issued 9/29/2008 LADBS
CofO in Progress 6/24/2010 MAURICE MARTINEZ
CofO Issued-Status Void 7/7/2010 RICKEY JACKSON
Permit Finaled-Status Void 7/7/2010 RICKEY JACKSON
Re-Activate Permit 3/22/2011 RICKEY JACKSON
CofO Corrected-Status Void 10/22/2021 WINSTON DUNNING
Permit Finaled-Status Void 10/22/2021 WINSTON DUNNING
Re-Activate Permit 11/8/2021 WINSTON DUNNING
CofO Corrected 11/8/2021 WINSTON DUNNING
Permit Finaled 11/8/2021 WINSTON DUNNING

Permit Application Clearance Information

Specific Plan Cleared 6/27/2008 WESTON PRINGLE
Transportation Demand Ord. Cleared 6/27/2008 WESTON PRINGLE
Address approval Cleared 6/30/2008 DAVID CHIN
Eng Process Fee Ord 176,300 Cleared 6/30/2008 AVALYN KAMACHI
Highway dedication Cleared 6/30/2008 TAO YANG
Roof/Waste drainage to street Cleared 6/30/2008 AVALYN KAMACHI
Sewer availability Cleared 6/30/2008 AVALYN KAMACHI
"T" removal Cleared 7/10/2008 NAOMI MASLON
Miscellaneous Cleared 7/10/2008 NAOMI MASLON
Site Plan review Cleared 7/10/2008 NAOMI MASLON
ZA Case Cleared 7/10/2008 NAOMI MASLON
ZI Cleared 7/10/2008 NAOMI MASLON
ZI Cleared 7/10/2008 NAOMI MASLON
ZI Cleared 7/10/2008 NAOMI MASLON
Hydrant and Access approval Cleared 7/17/2008 MICHAEL THEULE
Title 19 building approval Cleared 9/17/2008 HANI MALKI
"Q" conditions Cleared 9/19/2008 DAVID WEINTRAUB
DAS Clearance Cleared 9/26/2008 SEAN DANG

Contact Information

Architect Cohen, Andrew Phillip; Lic. No.: C12855 2500 BROADWAY STE 300      SANTA MONICA, CA 90404
Contractor Matt Construction Corporation; Lic. No.: 631020-A 9814 NORWALK BLVD #100      SANTA FE SPRINGS, CA 90670
Engineer Davis, Richard Hays; Lic. No.: C48082 2015 CANTATA DR      LOS ANGELES, CA 90068
Engineer Van, Beveren James Louis; Lic. No.: GE852 10921 OSO AVE      CHATSWORTH, CA 91311
Engineer Zekioglu, Atila; Lic. No.: S3455 16188 MEADOWCREST RD      SHERMAN OAKS, CA 91403

Inspector Information

EDWIN GREGORYONA, (213) 482-7357 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 10/3/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Methane Barrier 10/3/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Drilled-In Anchors 10/6/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 10/6/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Drilled-In Anchors 10/7/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 10/7/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Drilled-In Anchors 10/8/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 10/8/2008 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 10/9/2008 Partial Approval JOHN ZOLNIKOV
METHANE-Barrier 10/9/2008 Not Ready for Inspection JOHN ZOLNIKOV
METHANE-Subgrade 10/9/2008 Not Ready for Inspection JOHN ZOLNIKOV
Deputy Reinf. Concrete 10/10/2008 Conditional Approval MAURICE MARTINEZ
Deputy Reinf. Concrete 10/14/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Drilled-In Anchors 10/22/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 10/23/2008 Conditional Approval JOHN CARPENTER
Deputy Reinf. Concrete 10/24/2008 Conditional Approval JOHN CARPENTER
Deputy Reinf. Concrete 10/27/2008 Conditional Approval JOHN CARPENTER
Footing/Foundation/Slab 10/28/2008 Partial Approval JOHN ZOLNIKOV
METHANE-Barrier 10/28/2008 Approved JOHN ZOLNIKOV
METHANE-Subgrade 10/28/2008 Approved JOHN ZOLNIKOV
Deputy Methane Barrier 10/30/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Methane Barrier 10/31/2008 Partial Approval JOHN ZOLNIKOV
Deputy Methane Barrier 11/3/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Methane Barrier 11/4/2008 Partial Approval JOHN ZOLNIKOV
Deputy Methane Barrier 11/5/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 12/12/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 12/15/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 12/16/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 12/17/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 12/18/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 12/19/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 12/22/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 12/23/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 12/24/2008 Partial Approval LEONARD MATCHNIFF
Deputy Steel/Welding 12/26/2008 No Access for Inspection LEONARD MATCHNIFF
Deputy Steel/Welding 12/29/2008 Conditional Approval LEONARD MATCHNIFF
Deputy Steel/Welding 12/30/2008 Conditional Approval LEONARD MATCHNIFF
Deputy Steel/Welding 12/31/2008 Conditional Approval LEONARD MATCHNIFF
Deputy Steel/Welding 1/5/2009 Conditional Approval LEONARD MATCHNIFF
Deputy Steel/Welding 1/6/2009 Conditional Approval LEONARD MATCHNIFF
Deputy Steel/Welding 1/7/2009 Conditional Approval LEONARD MATCHNIFF
Deputy Steel/Welding 1/8/2009 Conditional Approval LEONARD MATCHNIFF
Deputy Steel/Welding 1/9/2009 Conditional Approval LEONARD MATCHNIFF
Deputy Steel/Welding 1/12/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 1/13/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 1/14/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 1/15/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 1/16/2009 Conditional Approval LEONARD MATCHNIFF
Deputy Steel/Welding 1/20/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 1/21/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 1/22/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 1/23/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 1/26/2009 Conditional Approval LEONARD MATCHNIFF
Deputy Steel/Welding 1/27/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 1/28/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 1/29/2009 Conditional Approval LEONARD MATCHNIFF
Deputy Steel/Welding 1/30/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 2/2/2009 Conditional Approval LEONARD MATCHNIFF
Deputy Steel/Welding 2/3/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 2/4/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 2/5/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 2/6/2009 Conditional Approval JOHN ZOLNIKOV
Excavation/Setback/Form/Re-Bar 2/12/2009 Partial Approval JOHN ZOLNIKOV
Excavation/Setback/Form/Re-Bar 2/20/2009 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 2/24/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 3/2/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 3/3/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 3/4/2009 Conditional Approval LEONARD MATCHNIFF
Deputy Steel/Welding 3/5/2009 Conditional Approval JOHN ZOLNIKOV
METHANE-Rough 3/5/2009 Not Ready for Inspection JOHN ZOLNIKOV
Reinforced Concrete Frame 3/5/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 3/6/2009 Conditional Approval JOHN ZOLNIKOV
Excavation/Setback/Form/Re-Bar 4/3/2009 Partial Approval JOHN ZOLNIKOV
Light Gage Steel Frame 4/3/2009 Partial Approval JOHN ZOLNIKOV
Light Gage Steel Frame 4/8/2009 Partial Approval JOHN ZOLNIKOV
Drywall Nailing 4/10/2009 Partial Approval JOHN ZOLNIKOV
Deputy Drilled-In Anchors 4/20/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Fireproofing 4/20/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 4/20/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 4/20/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Drilled-In Anchors 4/21/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 4/21/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 4/21/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Drilled-In Anchors 4/22/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 4/22/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 4/22/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Drilled-In Anchors 4/24/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 4/24/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 4/24/2009 Conditional Approval JOHN ZOLNIKOV
Light Gage Steel Frame 4/24/2009 Partial Approval JOHN ZOLNIKOV
Deputy Steel/Welding 4/27/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 4/28/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 4/29/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 4/30/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 4/30/2009 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 4/30/2009 Partial Approval JOHN ZOLNIKOV
Insulation 4/30/2009 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 5/1/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 5/1/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 5/4/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 5/4/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 5/5/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 5/5/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 5/6/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 5/6/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 5/7/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 5/7/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 5/8/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 5/8/2009 Conditional Approval JOHN ZOLNIKOV
Drywall Nailing 5/8/2009 Partial Approval JOHN ZOLNIKOV
Deputy Steel/Welding 5/11/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 5/12/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 5/13/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 5/13/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 5/14/2009 Conditional Approval JOHN ZOLNIKOV
Structural Steel Frame 5/14/2009 Partial Approval JOHN ZOLNIKOV
Deputy Steel/Welding 5/15/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Drilled-In Anchors 5/18/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 5/18/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 5/19/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 5/20/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 5/21/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 5/22/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 5/22/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 5/26/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 5/26/2009 Conditional Approval JOHN ZOLNIKOV
Excavation/Setback/Form/Re-Bar 5/26/2009 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 5/27/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 5/27/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 5/28/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 5/29/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 6/1/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 6/1/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 6/2/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 6/2/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 6/3/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 6/3/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 6/4/2009 Conditional Approval JESSE ACOSTA
Deputy Steel/Welding 6/4/2009 Conditional Approval JESSE ACOSTA
Excavation/Setback/Form/Re-Bar 6/4/2009 Partial Approval JESSE ACOSTA
Deputy Drilled-In Anchors 6/8/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 6/8/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 6/8/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 6/9/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 6/10/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 6/11/2009 Conditional Approval JOHN ZOLNIKOV
Drywall Nailing 6/11/2009 Partial Approval JOHN ZOLNIKOV
Deputy Steel/Welding 6/12/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 6/16/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 6/17/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 6/18/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 6/18/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 6/19/2009 Conditional Approval JOHN ZOLNIKOV
Light Gage Steel Frame 6/19/2009 Partial Approval JOHN ZOLNIKOV
Deputy Steel/Welding 6/22/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 6/23/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 6/24/2009 Conditional Approval JOHN ZOLNIKOV
Light Gage Steel Frame 6/24/2009 Partial Approval JOHN ZOLNIKOV
Deputy Steel/Welding 6/25/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 6/26/2009 Conditional Approval JOHN ZOLNIKOV
Drywall Nailing 6/26/2009 Partial Approval JOHN ZOLNIKOV
Interior/Exterior Lathing 6/26/2009 Partial Approval JOHN ZOLNIKOV
Structural Steel Frame 6/26/2009 Partial Approval JOHN ZOLNIKOV
Deputy Steel/Welding 6/29/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 6/30/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 7/1/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 7/2/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 7/6/2009 Conditional Approval LEONARD MATCHNIFF
Deputy Steel/Welding 7/7/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 7/8/2009 Conditional Approval JOHN ZOLNIKOV
Light Gage Steel Frame 7/8/2009 Partial Approval JOHN ZOLNIKOV
Deputy Steel/Welding 7/9/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 7/10/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 7/13/2009 Conditional Approval JOHN ZOLNIKOV
Drywall Nailing 7/13/2009 Partial Approval JOHN ZOLNIKOV
Deputy Steel/Welding 7/14/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 7/15/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 7/16/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 7/17/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 7/20/2009 Conditional Approval JOHN ZOLNIKOV
Insulation 7/20/2009 Partial Approval JOHN ZOLNIKOV
Light Gage Steel Frame 7/20/2009 Partial Approval JOHN ZOLNIKOV
Deputy Steel/Welding 7/21/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 7/22/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 7/23/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 7/24/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 7/27/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 7/28/2009 Conditional Approval JOHN ZOLNIKOV
Insulation 7/28/2009 Partial Approval JOHN ZOLNIKOV
METHANE-Rough 7/28/2009 Partial Approval JOHN ZOLNIKOV
Structural Steel Frame 7/28/2009 Partial Approval JOHN ZOLNIKOV
Deputy Steel/Welding 7/29/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 7/30/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 7/31/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 8/3/2009 Conditional Approval JOHN ZOLNIKOV
Drywall Nailing 8/3/2009 Partial Approval JOHN ZOLNIKOV
Light Gage Steel Frame 8/3/2009 Partial Approval JOHN ZOLNIKOV
Deputy Steel/Welding 8/4/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 8/5/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 8/6/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 8/7/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 8/10/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 8/10/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 8/11/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 8/11/2009 Conditional Approval JOHN ZOLNIKOV
Insulation 8/11/2009 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 8/12/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 8/12/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 8/13/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 8/13/2009 Conditional Approval JOHN ZOLNIKOV
Excavation/Setback/Form/Re-Bar 8/13/2009 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 8/14/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 8/14/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 8/17/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 8/17/2009 Conditional Approval JOHN ZOLNIKOV
Insulation 8/17/2009 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 8/18/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 8/18/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 8/19/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 8/19/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 8/20/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 8/20/2009 Corrections Issued JOHN ZOLNIKOV
Excavation/Setback/Form/Re-Bar 8/20/2009 Partial Approval JOHN ZOLNIKOV
Insulation 8/20/2009 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 8/21/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 8/21/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 8/24/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 8/24/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 8/25/2009 Conditional Approval JOHN ZOLNIKOV
Light Gage Steel Frame 8/25/2009 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 8/26/2009 Conditional Approval LEONARD MATCHNIFF
Deputy Steel/Welding 8/26/2009 Conditional Approval LEONARD MATCHNIFF
Deputy Reinf. Concrete 8/27/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 8/27/2009 Conditional Approval JOHN ZOLNIKOV
Excavation/Setback/Form/Re-Bar 8/27/2009 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 8/28/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 8/28/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 8/31/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 9/1/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Drilled-In Anchors 9/2/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 9/2/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 9/3/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 9/3/2009 Conditional Approval JOHN ZOLNIKOV
Excavation/Setback/Form/Re-Bar 9/3/2009 Partial Approval JOHN ZOLNIKOV
Deputy Steel/Welding 9/4/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 9/8/2009 Conditional Approval LEONARD MATCHNIFF
Deputy Steel/Welding 9/9/2009 Conditional Approval JOHN ZOLNIKOV
Excavation/Setback/Form/Re-Bar 9/9/2009 Partial Approval JOHN ZOLNIKOV
Deputy Drilled-In Anchors 9/10/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 9/10/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 9/11/2009 Partial Approval JOHN ZOLNIKOV
Light Gage Steel Frame 9/11/2009 Partial Approval JOHN ZOLNIKOV
Excavation/Setback/Form/Re-Bar 9/17/2009 Partial Approval JOHN ZOLNIKOV
Deputy Steel/Welding 9/21/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 9/22/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 9/22/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 9/23/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 9/24/2009 Conditional Approval JOHN ZOLNIKOV
Light Gage Steel Frame 9/24/2009 Partial Approval JOHN ZOLNIKOV
Deputy Steel/Welding 9/25/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 9/28/2009 Conditional Approval STEPHEN REED
Deputy Steel/Welding 9/28/2009 Conditional Approval STEPHEN REED
Deputy Steel/Welding 9/29/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 9/30/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 9/30/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 10/1/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 10/1/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 10/2/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 10/2/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 10/5/2009 Conditional Approval JOHN ZOLNIKOV
Drywall Nailing 10/5/2009 Partial Approval JOHN ZOLNIKOV
Deputy Steel/Welding 10/6/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 10/7/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 10/7/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 10/8/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 10/8/2009 Conditional Approval JOHN ZOLNIKOV
Excavation/Setback/Form/Re-Bar 10/8/2009 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 10/9/2009 Conditional Approval LEONARD MATCHNIFF
Deputy Steel/Welding 10/9/2009 Conditional Approval LEONARD MATCHNIFF
Deputy Reinf. Concrete 10/13/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 10/13/2009 Conditional Approval JOHN ZOLNIKOV
Light Gage Steel Frame 10/13/2009 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 10/14/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 10/14/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 10/15/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 10/15/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 10/16/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 10/16/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 10/19/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 10/20/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 10/20/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 10/21/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 10/21/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 10/22/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 10/22/2009 Conditional Approval JOHN ZOLNIKOV
Excavation/Setback/Form/Re-Bar 10/22/2009 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 10/23/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 10/23/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 10/26/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 10/27/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 10/28/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 10/28/2009 Conditional Approval JOHN ZOLNIKOV
Drywall Nailing 10/28/2009 Partial Approval JOHN ZOLNIKOV
Deputy Steel/Welding 10/29/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 10/30/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 11/2/2009 Conditional Approval LEONARD MATCHNIFF
Deputy Steel/Welding 11/3/2009 Conditional Approval LEONARD MATCHNIFF
Deputy Steel/Welding 11/4/2009 Conditional Approval LEONARD MATCHNIFF
Deputy Reinf. Concrete 11/5/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 11/5/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 11/6/2009 Conditional Approval JOHN ZOLNIKOV
Excavation/Setback/Form/Re-Bar 11/6/2009 Partial Approval JOHN ZOLNIKOV
Deputy Steel/Welding 11/9/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 11/10/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 11/10/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 11/12/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 11/13/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 11/16/2009 Conditional Approval JOHN ZOLNIKOV
Light Gage Steel Frame 11/16/2009 Partial Approval JOHN ZOLNIKOV
Deputy Steel/Welding 11/17/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 11/18/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 11/19/2009 Conditional Approval JOHN ZOLNIKOV
Floor/Roof Diaphrgm/Shear Wall 11/19/2009 Partial Approval JOHN ZOLNIKOV
Deputy Steel/Welding 11/20/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 11/23/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 11/23/2009 Conditional Approval JOHN ZOLNIKOV
Drywall Nailing 11/23/2009 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Masonry 11/24/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 11/24/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 11/25/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 11/30/2009 Conditional Approval JOHN ZOLNIKOV
Light Gage Steel Frame 11/30/2009 Partial Approval JOHN ZOLNIKOV
Deputy Steel/Welding 12/1/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 12/2/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 12/2/2009 Conditional Approval JOHN ZOLNIKOV
Excavation/Setback/Form/Re-Bar 12/2/2009 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 12/3/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 12/3/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 12/4/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 12/7/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 12/8/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 12/9/2009 Conditional Approval JOHN ZOLNIKOV
Light Gage Steel Frame 12/9/2009 Partial Approval JOHN ZOLNIKOV
Deputy Steel/Welding 12/10/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 12/11/2009 Conditional Approval JOHN ZOLNIKOV
Drywall Nailing 12/11/2009 Partial Approval JOHN ZOLNIKOV
Light Gage Steel Frame 12/11/2009 Partial Approval JOHN ZOLNIKOV
Deputy Steel/Welding 12/14/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 12/15/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 12/16/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 12/17/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 12/18/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 12/21/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 12/22/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 12/23/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 12/24/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 12/28/2009 Conditional Approval STEPHEN REED
Deputy Steel/Welding 12/29/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 12/30/2009 Conditional Approval LEONARD MATCHNIFF
Deputy Steel/Welding 12/31/2009 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 1/4/2010 Conditional Approval LEONARD MATCHNIFF
Deputy Steel/Welding 1/5/2010 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 1/6/2010 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 1/7/2010 Conditional Approval LEONARD MATCHNIFF
Deputy Steel/Welding 1/8/2010 Conditional Approval LEONARD MATCHNIFF
Deputy Steel/Welding 1/11/2010 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 1/12/2010 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 1/13/2010 Conditional Approval JOHN ZOLNIKOV
METHANE-Rough 1/13/2010 Approved JOHN ZOLNIKOV
Structural Steel Frame 1/13/2010 Approved JOHN ZOLNIKOV
Deputy Steel/Welding 1/14/2010 Conditional Approval LEONARD MATCHNIFF
Deputy Steel/Welding 1/15/2010 Conditional Approval LEONARD MATCHNIFF
Deputy Steel/Welding 1/19/2010 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 1/20/2010 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 1/21/2010 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 1/25/2010 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 1/26/2010 Conditional Approval NICK DANERI
Deputy Steel/Welding 1/27/2010 Conditional Approval JOHN ZOLNIKOV
Light Gage Steel Frame 1/27/2010 Partial Approval JOHN ZOLNIKOV
Deputy Steel/Welding 1/28/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 2/1/2010 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 2/2/2010 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 2/3/2010 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 2/4/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 2/8/2010 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 2/9/2010 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 2/11/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 2/16/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 2/17/2010 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 2/18/2010 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 2/18/2010 Conditional Approval JOHN ZOLNIKOV
Insulation 2/24/2010 Approved JOHN ZOLNIKOV
Deputy Reinf. Concrete 2/25/2010 Conditional Approval MAURICE MARTINEZ
Drywall Nailing 3/1/2010 Partial Approval MAURICE MARTINEZ
Deputy Steel/Welding 3/3/2010 Conditional Approval MAURICE MARTINEZ
Special/Order Compliance 3/3/2010 No Access for Inspection JERROLD GROSS
Deputy Reinf. Concrete 3/11/2010 Conditional Approval MAURICE MARTINEZ
Drywall Nailing 3/17/2010 Approved JOHN ZOLNIKOV
Excavation/Setback/Form/Re-Bar 3/17/2010 Approved JOHN ZOLNIKOV
Final 3/17/2010 Not Ready for Inspection JOHN ZOLNIKOV
Floor/Roof Diaphrgm/Shear Wall 3/17/2010 Approved JOHN ZOLNIKOV
Footing/Foundation/Slab 3/17/2010 Approved JOHN ZOLNIKOV
Interior/Exterior Lathing 3/17/2010 Approved JOHN ZOLNIKOV
Reinforced Concrete Frame 3/17/2010 Approved JOHN ZOLNIKOV
SGSOV-Seismic Gas S/O Valve 3/17/2010 SGSOV Approved JOHN ZOLNIKOV
Deputy Reinf. Concrete 3/23/2010 Conditional Approval MICHAEL ALVAREZ
Final 4/6/2010 Partial Inspection MAURICE MARTINEZ
Final 4/8/2010 Corrections Issued MAURICE MARTINEZ
Final 4/13/2010 Conditional Approval MAURICE MARTINEZ
Final 4/15/2010 Partial Inspection MAURICE MARTINEZ
Final 4/19/2010 Not Ready for Inspection MAURICE MARTINEZ
Final 4/20/2010 Not Ready for Inspection MAURICE MARTINEZ
Final 4/21/2010 OK for TCO MAURICE MARTINEZ
Deputy Reinf. Masonry 4/26/2010 Conditional Approval MAURICE MARTINEZ
Excavation/Setback/Form/Re-Bar 5/10/2010 Partial Approval MAURICE MARTINEZ
Verify Sprinkler Sign Off 6/2/2010 Not Ready for Inspection MAURICE MARTINEZ
Insulation 6/23/2010 Approved MAURICE MARTINEZ