1317 S HOPE ST 90015

Certificate Information: 1317 S HOPE ST 90015

Application / Permit
13010-10000-02492
Plan Check / Job No.
B13LA10218
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
NEW 5 STORY WITH MEZZANINE , 38-UNIT ( 6 AFFORDABLE, VERY VERY LOW INCOME UNITS) TYPE III-A APARTMENTS OVER 1 STORY WITH MEZZANINE TYPE I-A RETAIL & PARKING GARAGE & OVER 2 LEVEL SUBTERRANEAN PARKING GARAGE. ( 6 STORY BUILDING)
Permit Issued
Issued on 2/17/2016
Issuing Office
Metro
Current Status
Issued on 2/17/2016
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 8/20/2013 APPLICANT
Disabled Access Plans Picked Up 9/10/2013 APPLICANT
Green Plans Picked Up 9/10/2013 APPLICANT
Assigned to Plan Check Engineer 9/12/2013 GARO TELMI
Corrections Issued 10/4/2013 GARO TELMI
Quality Review Completed 10/8/2013 BILL STUTSMAN
Building Plans Picked Up 10/11/2013 APPLICANT
Applicant returned to address corrections 1/7/2014 GARO TELMI
Applicant returned to address corrections 2/7/2014 GARO TELMI
Applicant returned to address corrections 3/12/2014 GARO TELMI
Applicant returned to address corrections 9/5/2014 GARO TELMI
Applicant returned to address corrections 12/4/2014 GARO TELMI
Applicant returned to address corrections 2/6/2015 GARO TELMI
Applicant returned to address corrections 8/28/2015 GARO TELMI
Plan Check Approved 9/16/2015 GARO TELMI
Issued 2/17/2016 LADBS

Permit Application Clearance Information

Title 19 building approval Cleared 12/6/2013 GHASSEM NIKKHOO
"D" conditions Cleared 12/9/2013 HERMAN VAN BUREN
"Q" conditions Cleared 12/9/2013 HERMAN VAN BUREN
Address approval Cleared 12/9/2013 AVALYN KAMACHI
Methane Ordinance Cleared 12/9/2013 DAVE MYERS
Eng Process Fee Ord 176,300 Cleared 12/18/2013 JAMES MORALEZ
Internal circulation Cleared 12/18/2013 COLLINS ALLAN
Hydrant and Access approval Cleared 12/30/2013 JOHN DALLAS
Building over 3-story or 36-ft Cleared 1/7/2014 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 1/7/2014 CALOSHA APPROVED
Frnt yard landscape/Water mgmt Cleared 1/7/2014 BRIDGETTE WOOTEN
Housing rent stabilization Cleared 1/7/2014 CHARLES GARCIA
Permit Cleared 1/7/2014 ARMENIA AGUILAR
Project located in CRA area Cleared 1/14/2014 JIM URQUHART
Miscellaneous Cleared 2/7/2014 EMMANUELA GUTIERREZ
Highway dedication Cleared 4/7/2014 RICHARD SOUTHERLAND
Opn space landscape/Water mgmt Cleared 4/7/2014 ANDY RODRIGUEZ
Sewer availability Cleared 4/7/2014 RICHARD SOUTHERLAND
Green Code Cleared 6/26/2014 MARTHA DIAZ
Housing density bonus Cleared 10/30/2014 ROSALIND BARDEN
Site Plan review Cleared 11/21/2014 MARITZA PRZEKOP
Construction near power lines Cleared 12/9/2014 LUCIO FERRER
Miscellaneous Cleared 2/6/2015 TAIMOUR TANAVOLI
DAS Clearance Cleared 2/10/2015 WAI LAU
Low Impact Development Cleared 2/10/2015 AMMAR ELTAWIL
Stormwater Pollution Mitigatn Cleared 2/11/2015 IDA MEISAMI-FARD
Roof/Waste drainage to street Cleared 8/12/2015 ARMENIA HERNANDEZ
"D" conditions Cleared 8/14/2015 HERMAN VAN BUREN
"Q" conditions Cleared 8/14/2015 HERMAN VAN BUREN
Encroachment in public way Cleared 8/14/2015 MEHRDAD EMAMI
Project located in CRA area Cleared 8/14/2015 JIM URQUHART
Site Plan review Cleared 8/14/2015 HERMAN VAN BUREN
Work Adjacent to Public Way Cleared 8/14/2015 MEHRDAD EMAMI

Contact Information

Architect Empakeris, Donatas Eduard; Lic. No.: C13779 1535 6TH STREET SUITE 101   DE ARCHITECTS    SANTA MONICA, CA 90401
Contractor Owner-Builder       ,
Engineer Arriola, Kirby Norman; Lic. No.: C31416 PO BOX 5566      OXNARD, CA 93031
Engineer Derkalousdian, Hrair Harry; Lic. No.: C79694 441 PALM DR 3      GLENDALE, CA 91202
Engineer Mehta, Babubhai Mohanlal; Lic. No.: S1924 19617 PINE VALLEY AVE      NORTHRIDGE, CA 91326
Engineer Young, Don Yuk-Man; Lic. No.: C35713 650 SIERRA MADRE VILLA AVE #206      PASADENA, CA 91107

Inspector Information

NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

Interior/Exterior Lathing 1/21/2025   
Drywall Nailing 1/21/2025   

Inspection Request History

Pre-Inspection 8/2/2016 Conditional Approval NICK DANERI
Pre-Inspection 11/9/2016 No Access for Inspection KATY RAMIREZ
Pre-Inspection 8/29/2017 Partial Inspection NICK DANERI
Special/Order Compliance 12/8/2017 Partial Inspection NICK DANERI
Deputy Reinf. Concrete 12/15/2017 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 12/18/2017 Partial Inspection ERNESTO CORRAL
Green Building Rough 12/18/2017 Not Ready for Inspection ERNESTO CORRAL
METHANE-Rough 12/18/2017 Not Ready for Inspection ERNESTO CORRAL
Reinforced Concrete Frame 12/18/2017 Partial Inspection ERNESTO CORRAL
Verify Sprinkler Sign Off 12/18/2017 Not Ready for Inspection ERNESTO CORRAL
Deputy Shotcrete 1/23/2018 Conditional Approval NICK DANERI
Deputy Shotcrete 1/24/2018 Conditional Approval NICK DANERI
Deputy Shotcrete 1/25/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 2/1/2018 Partial Approval NICK DANERI
Deputy Shotcrete 2/14/2018 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 2/15/2018 Conditional Approval NICK DANERI
Deputy Shotcrete 2/16/2018 Conditional Approval NICK DANERI
Deputy Shotcrete 2/22/2018 Conditional Approval NICK DANERI
Green Building Rough 2/22/2018 Partial Inspection NICK DANERI
METHANE-Rough 2/22/2018 Conditional Approval NICK DANERI
Reinforced Concrete Frame 2/22/2018 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 2/22/2018 Not Ready for Inspection NICK DANERI
Deputy Shotcrete 2/23/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 3/9/2018 Conditional Approval NICK DANERI
Deputy Shotcrete 3/9/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 3/15/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 3/15/2018 Not Ready for Inspection NICK DANERI
Footing/Foundation/Slab 3/15/2018 Corrections Issued NICK DANERI
METHANE-Barrier 3/15/2018 Partial Inspection NICK DANERI
METHANE-Subgrade 3/15/2018 Partial Inspection NICK DANERI
Deputy Reinf. Concrete 3/16/2018 Conditional Approval NICK DANERI
Footing/Foundation/Slab 3/16/2018 Partial Approval NICK DANERI
Deputy Reinf. Concrete 3/28/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 3/28/2018 Partial Approval NICK DANERI
Deputy Reinf. Concrete 4/4/2018 Conditional Approval NICK DANERI
Deputy Shotcrete 4/4/2018 Conditional Approval NICK DANERI
Deputy Shotcrete 4/5/2018 Conditional Approval NICK DANERI
Deputy Shotcrete 4/12/2018 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 4/12/2018 Partial Approval JAMES POWERS
Insulation 4/12/2018 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 4/13/2018 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 4/13/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/16/2018 Conditional Approval NICK DANERI
Deputy Shotcrete 4/16/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 4/17/2018 Conditional Approval NICK DANERI
Deputy Shotcrete 4/17/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 4/17/2018 Partial Approval NICK DANERI
Deputy Reinf. Concrete 4/18/2018 Conditional Approval NICK DANERI
Deputy Shotcrete 4/18/2018 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 4/18/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 4/23/2018 Not Ready for Inspection NICK DANERI
Excavation/Setback/Form/Re-Bar 4/25/2018 Partial Approval NICK DANERI
Deputy Reinf. Masonry 5/4/2018 Conditional Approval NICK DANERI
Green Building Rough 5/8/2018 Partial Inspection NICK DANERI
METHANE-Rough 5/8/2018 Approved NICK DANERI
Masonry Wall/Backfill 5/8/2018 Partial Approval NICK DANERI
Reinforced Masonry Frame 5/8/2018 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 5/8/2018 Not Ready for Inspection NICK DANERI
Deputy Reinf. Masonry 5/10/2018 Conditional Approval NICK DANERI
Masonry Wall/Backfill 5/10/2018 Partial Inspection NICK DANERI
Deputy Drilled-In Anchors 5/17/2018 Conditional Approval NICK DANERI
Special/Order Compliance 5/21/2018 No Access for Inspection NICK DANERI
Deputy Drilled-In Anchors 7/3/2018 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 7/3/2018 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 7/6/2018 Conditional Approval NICK DANERI
Green Building Rough 7/11/2018 Partial Inspection NICK DANERI
Reinforced Masonry Frame 7/11/2018 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 7/11/2018 Not Ready for Inspection NICK DANERI
SGSOV-Seismic Gas S/O Valve 7/25/2018 SGSOV Not Ready NICK DANERI
Special/Order Compliance 7/25/2018 Corrections Issued NICK DANERI
Deputy Drilled-In Anchors 9/11/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 9/11/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 9/12/2018 Conditional Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 9/12/2018 Not Ready for Inspection NICK DANERI
Footing/Foundation/Slab 9/12/2018 Not Ready for Inspection NICK DANERI
METHANE-Barrier 9/12/2018 Partial Approval NICK DANERI
METHANE-Subgrade 9/12/2018 Partial Approval NICK DANERI
Deputy Reinf. Concrete 9/17/2018 Conditional Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 9/17/2018 Partial Approval NICK DANERI
Footing/Foundation/Slab 9/17/2018 Partial Approval NICK DANERI
METHANE-Barrier 9/17/2018 Partial Inspection NICK DANERI
METHANE-Subgrade 9/17/2018 Approved NICK DANERI
Deputy Reinf. Concrete 9/18/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 9/21/2018 Partial Approval WINSTON DUNNING
Floor/Roof Diaphrgm/Shear Wall 9/21/2018 Partial Inspection WINSTON DUNNING
Footing/Foundation/Slab 9/21/2018 Partial Approval WINSTON DUNNING
METHANE-Barrier 9/21/2018 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 9/24/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 10/15/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 10/17/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 10/19/2018 Conditional Approval NICK DANERI
Green Building Rough 10/19/2018 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 10/19/2018 Not Ready for Inspection NICK DANERI
Verify Sprinkler Sign Off 10/19/2018 Not Ready for Inspection NICK DANERI
Green Building Rough 10/25/2018 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 10/25/2018 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 10/25/2018 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 10/29/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 11/7/2018 Corrections Issued NICK DANERI
Deputy Reinf. Concrete 11/8/2018 Conditional Approval NICK DANERI
Green Building Rough 11/8/2018 Partial Inspection NICK DANERI
Reinforced Concrete Frame 11/8/2018 Partial Inspection NICK DANERI
Verify Sprinkler Sign Off 11/8/2018 Partial Inspection NICK DANERI
Deputy Reinf. Concrete 11/9/2018 Conditional Approval NICK DANERI
Grading Pre-Inspection 11/9/2018 Partial Inspection NICK DANERI
Green Building Rough 11/16/2018 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 11/16/2018 Partial Approval NICK DANERI
Structural Steel Frame 11/16/2018 Partial Inspection NICK DANERI
Verify Sprinkler Sign Off 11/16/2018 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 11/19/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 11/20/2018 Conditional Approval NICK DANERI
Deputy Shotcrete 11/27/2018 Conditional Approval NICK DANERI
Deputy Shotcrete 11/28/2018 Conditional Approval NICK DANERI
Deputy Shotcrete 11/30/2018 Conditional Approval NICK DANERI
Green Building Rough 12/6/2018 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 12/6/2018 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 12/6/2018 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 12/7/2018 Conditional Approval NICK DANERI
Deputy Shotcrete 12/7/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 12/10/2018 Conditional Approval NICK DANERI
Deputy Shotcrete 12/10/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 12/19/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 12/20/2018 Conditional Approval NICK DANERI
Green Building Rough 12/20/2018 Partial Inspection NICK DANERI
Reinforced Concrete Frame 12/20/2018 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 12/20/2018 Partial Inspection NICK DANERI
Deputy Reinf. Concrete 1/31/2019 Conditional Approval NICK DANERI
Green Building Rough 1/31/2019 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 1/31/2019 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 1/31/2019 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 2/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/20/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 2/21/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 2/22/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 2/26/2019 Conditional Approval NICK DANERI
Green Building Rough 2/26/2019 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 2/26/2019 Partial Inspection NICK DANERI
Verify Sprinkler Sign Off 2/26/2019 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 3/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/8/2019 Conditional Approval JONATHAN QUACH
Green Building Rough 3/8/2019 Not Ready for Inspection ERNESTO CORRAL
Reinforced Concrete Frame 3/8/2019 Partial Inspection ERNESTO CORRAL
Verify Sprinkler Sign Off 3/8/2019 Not Ready for Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 3/11/2019 Conditional Approval ERNESTO CORRAL
Green Building Rough 3/20/2019 Partial Inspection NICK DANERI
Reinforced Concrete Frame 3/20/2019 Partial Inspection NICK DANERI
Verify Sprinkler Sign Off 3/20/2019 Not Ready for Inspection NICK DANERI
Green Building Rough 3/22/2019 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 3/22/2019 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 3/22/2019 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 3/26/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 3/27/2019 Conditional Approval NICK DANERI
Deputy Shotcrete 4/16/2019 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 4/18/2019 Conditional Approval NICK DANERI
Deputy Shotcrete 4/18/2019 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 4/19/2019 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 4/19/2019 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 4/29/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 5/1/2019 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 5/2/2019 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 5/3/2019 Conditional Approval LESLIE TRUJILLO
Green Building Rough 5/3/2019 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 5/3/2019 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 5/3/2019 Not Ready for Inspection JAMES POWERS
Deputy Shotcrete 5/7/2019 Conditional Approval ERNESTO CORRAL
Green Building Rough 5/7/2019 Not Ready for Inspection ERNESTO CORRAL
Reinforced Concrete Frame 5/7/2019 Partial Inspection ERNESTO CORRAL
Verify Sprinkler Sign Off 5/7/2019 Not Ready for Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 5/8/2019 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 5/8/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 5/8/2019 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 5/9/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 5/9/2019 Conditional Approval LESLIE TRUJILLO
Green Building Rough 5/9/2019 Partial Inspection LESLIE TRUJILLO
Reinforced Concrete Frame 5/9/2019 Partial Approval LESLIE TRUJILLO
Verify Sprinkler Sign Off 5/9/2019 Partial Inspection LESLIE TRUJILLO
Deputy Reinf. Concrete 5/10/2019 Conditional Approval LESLIE TRUJILLO
Green Building Rough 5/14/2019 Not Ready for Inspection ERNESTO CORRAL
Reinforced Concrete Frame 5/14/2019 Partial Inspection ERNESTO CORRAL
Verify Sprinkler Sign Off 5/14/2019 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 7/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/2/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/20/2019 Conditional Approval LESLIE TRUJILLO
Green Building Rough 8/21/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 8/21/2019 Partial Inspection LESLIE TRUJILLO
Verify Sprinkler Sign Off 8/21/2019 Conditional Approval LESLIE TRUJILLO
Special/Order Compliance 8/23/2019 Partial Approval LESLIE TRUJILLO
Deputy Wood Construction 11/4/2019 Conditional Approval ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 11/5/2019 Partial Inspection ERNESTO CORRAL
Pre-Inspection 2/19/2020 Partial Inspection ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 4/27/2020 Partial Approval RAFAEL ESPINOZA
Special/Order Compliance 4/30/2020 Partial Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 5/29/2020 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 8/19/2020 Partial Approval NICK DANERI
Special/Order Compliance 12/14/2020 Partial Inspection NICK DANERI
Structural Steel Frame 11/16/2021 Partial Approval TED RIES
Deputy Steel/Welding 12/17/2021 Conditional Approval NICK DANERI
Structural Steel Frame 2/16/2022 Partial Approval NICK DANERI
Deputy Steel/Welding 3/1/2022 Conditional Approval NICK DANERI
Structural Steel Frame 3/1/2022 Partial Approval NICK DANERI
Wood Frame 4/13/2022 Corrections Issued NICK DANERI
Wood Frame 4/22/2022 Partial Approval NICK DANERI
Wood Frame 5/6/2022 Partial Approval NICK DANERI
Wood Frame 5/11/2022 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 5/18/2022 Partial Approval RAFAEL ESPINOZA
Insulation 5/18/2022 Partial Approval RAFAEL ESPINOZA
Wood Frame 5/18/2022 Not Ready for Inspection RAFAEL ESPINOZA
Wood Frame 5/24/2022 Partial Approval NICK DANERI
Wood Frame 5/27/2022 Partial Inspection RAFAEL ESPINOZA
Insulation 6/3/2022 Not Ready for Inspection NICK DANERI
Wood Frame 6/6/2022 Not Ready for Inspection NICK DANERI
Drywall Nailing 6/16/2022 Partial Approval NICK DANERI
Wood Frame 6/23/2022 Not Ready for Inspection NICK DANERI
Wood Frame 7/13/2022 Partial Approval RAFAEL ESPINOZA
Wood Frame 7/27/2022 Partial Approval NICK DANERI
Wood Frame 8/4/2022 Partial Approval JAMES POWERS
Wood Frame 8/9/2022 Partial Approval NICK DANERI
Wood Frame 8/15/2022 Partial Approval GREGORY POMISH
Wood Frame 8/16/2022 Partial Approval NICK DANERI
Wood Frame 8/18/2022 Partial Approval NICK DANERI
Wood Frame 8/23/2022 Partial Approval NICK DANERI
Wood Frame 10/14/2022 Partial Inspection GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 11/29/2022 Partial Approval NICK DANERI
Deputy Steel/Welding 12/1/2022 Conditional Approval MICHAEL ROSENBERG
Pre-Inspection 4/19/2023 Partial Inspection LARRY ARNICK
Drywall Nailing 4/28/2023 Partial Approval NICK DANERI
Wood Frame 5/9/2023 Partial Inspection NICK DANERI
Wood Frame 5/19/2023 Partial Approval GREGORY POMISH
Insulation 6/22/2023 Partial Approval GREGORY POMISH
Drywall Nailing 7/13/2023 Partial Approval GREGORY POMISH
Special/Order Compliance 9/28/2023 Corrections Issued NICK DANERI
Special/Order Compliance 4/5/2024 Corrections Issued NICK DANERI
Special/Order Compliance 5/30/2024 Partial Inspection NICK DANERI
Deputy Steel/Welding 7/12/2024 Conditional Approval NICK DANERI
Special/Order Compliance 7/12/2024 Partial Approval NICK DANERI
Pre-Inspection 7/16/2024 Partial Inspection NICK DANERI
Interior/Exterior Lathing 8/19/2024 Partial Approval NICK DANERI
Wood Frame 8/29/2024 Partial Approval LUIS CCAMACHO
Structural Steel Frame 9/3/2024 Partial Approval LARRY ARNICK
Insulation 9/10/2024 Partial Approval LUIS CCAMACHO
Insulation 9/13/2024 Partial Approval NICK DANERI
Wood Frame 9/25/2024 Partial Approval NICK DANERI
Drywall Nailing 10/7/2024 Partial Approval NICK DANERI
Insulation 10/7/2024 Partial Approval NICK DANERI
Drywall Nailing 10/16/2024 Partial Approval NICK DANERI
Insulation 10/16/2024 Partial Approval NICK DANERI
Interior/Exterior Lathing 10/30/2024 Partial Inspection JEFFREY FULTON
Drywall Nailing 11/5/2024 Partial Inspection NICK DANERI
Wood Frame 11/5/2024 Partial Approval NICK DANERI
Drywall Nailing 11/15/2024 Partial Approval RONALD JIMENEZ
Drywall Nailing 11/18/2024 Partial Inspection RONALD JIMENEZ
Drywall Nailing 12/11/2024 Partial Approval NICK DANERI
Drywall Nailing 12/23/2024 Partial Approval NICK DANERI
Drywall Nailing 1/2/2025 Partial Approval LARRY ARNICK