METHANE-Rough
|
7/22/2015
|
Not Ready for Inspection
|
WILLIAM THOMPSON
|
Reinforced Concrete Frame
|
7/22/2015
|
Partial Approval
|
WILLIAM THOMPSON
|
Verify Sprinkler Sign Off
|
7/22/2015
|
Not Ready for Inspection
|
WILLIAM THOMPSON
|
Deputy Reinf. Concrete
|
7/27/2015
|
Conditional Approval
|
WILLIAM THOMPSON
|
Deputy Reinf. Concrete
|
7/28/2015
|
Approved
|
SAKO AGHAZARIAN
|
Deputy Reinf. Concrete
|
7/29/2015
|
Approved
|
SAKO AGHAZARIAN
|
Deputy Reinf. Concrete
|
7/30/2015
|
Approved
|
SAKO AGHAZARIAN
|
Deputy Reinf. Concrete
|
7/31/2015
|
Approved
|
SAKO AGHAZARIAN
|
Deputy Reinf. Concrete
|
8/3/2015
|
Conditional Approval
|
WILLIAM THOMPSON
|
Deputy Reinf. Concrete
|
8/4/2015
|
Conditional Approval
|
WILLIAM THOMPSON
|
Deputy Reinf. Concrete
|
8/5/2015
|
Conditional Approval
|
WILLIAM THOMPSON
|
Deputy Reinf. Concrete
|
8/6/2015
|
Conditional Approval
|
WILLIAM THOMPSON
|
Deputy Reinf. Concrete
|
8/7/2015
|
Conditional Approval
|
WILLIAM THOMPSON
|
Deputy Reinf. Concrete
|
8/10/2015
|
Conditional Approval
|
WILLIAM THOMPSON
|
Deputy Reinf. Concrete
|
8/11/2015
|
Conditional Approval
|
WILLIAM THOMPSON
|
Deputy Reinf. Concrete
|
8/12/2015
|
Approved
|
SAKO AGHAZARIAN
|
Deputy Reinf. Concrete
|
8/13/2015
|
Approved
|
SAKO AGHAZARIAN
|
Deputy Reinf. Concrete
|
8/14/2015
|
Conditional Approval
|
WILLIAM THOMPSON
|
Footing/Foundation/Slab
|
8/20/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
METHANE-Barrier
|
8/20/2015
|
Approved
|
LESLIE TRUJILLO
|
METHANE-Subgrade
|
8/20/2015
|
Approved
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
8/24/2015
|
Order to Comply Issued
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
8/25/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
8/26/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Footing/Foundation/Slab
|
8/26/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
8/27/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
METHANE-Rough
|
8/27/2015
|
Approved
|
LESLIE TRUJILLO
|
Reinforced Concrete Frame
|
8/27/2015
|
Not Ready for Inspection
|
LESLIE TRUJILLO
|
Verify Sprinkler Sign Off
|
8/27/2015
|
Approved
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
8/28/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Footing/Foundation/Slab
|
8/28/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Footing/Foundation/Slab
|
9/1/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
9/2/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Masonry Wall/Backfill
|
9/2/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
9/3/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
9/4/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
9/8/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
9/9/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
9/10/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
9/11/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Reinforced Concrete Frame
|
9/11/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
9/17/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Footing/Foundation/Slab
|
9/17/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
9/18/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
9/22/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
9/23/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
9/24/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
9/25/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
9/28/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Footing/Foundation/Slab
|
9/28/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
9/29/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
9/30/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
10/1/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
10/2/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
10/5/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
10/6/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Footing/Foundation/Slab
|
10/6/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
10/7/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
10/8/2015
|
Approved
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
10/9/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
10/13/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
10/14/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Footing/Foundation/Slab
|
10/14/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
10/15/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
10/16/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Pre-Inspection
|
10/16/2015
|
Partial Inspection
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
10/20/2015
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
10/21/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Reinforced Concrete Frame
|
10/21/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
10/22/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
10/23/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
10/27/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
10/28/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
10/29/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
10/30/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
11/3/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
11/4/2015
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
11/5/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Reinforced Concrete Frame
|
11/5/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
11/6/2015
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
11/9/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
11/10/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
11/12/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Footing/Foundation/Slab
|
11/12/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
11/13/2015
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
11/20/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
11/23/2015
|
Approved
|
SAKO AGHAZARIAN
|
Footing/Foundation/Slab
|
11/23/2015
|
Partial Approval
|
SAKO AGHAZARIAN
|
Masonry Wall/Backfill
|
11/23/2015
|
Partial Approval
|
SAKO AGHAZARIAN
|
Deputy Reinf. Concrete
|
11/24/2015
|
Conditional Approval
|
WILLIAM THOMPSON
|
Deputy Reinf. Concrete
|
11/25/2015
|
Conditional Approval
|
WILLIAM THOMPSON
|
Reinforced Concrete Frame
|
12/5/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
12/7/2015
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
12/10/2015
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
12/11/2015
|
Conditional Approval
|
LESLIE TRUJILLO
|
Reinforced Concrete Frame
|
12/14/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
12/15/2015
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
12/16/2015
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
12/17/2015
|
Conditional Approval
|
LESLIE TRUJILLO
|
Masonry Wall/Backfill
|
12/17/2015
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
12/18/2015
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
12/23/2015
|
Conditional Approval
|
LESLIE TRUJILLO
|
Reinforced Concrete Frame
|
12/23/2015
|
Partial Inspection
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
12/29/2015
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
12/30/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Reinforced Concrete Frame
|
12/30/2015
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
12/31/2015
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
1/11/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Steel/Welding
|
1/11/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
1/12/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Steel/Welding
|
1/12/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Masonry Wall/Backfill
|
1/12/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
1/13/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Steel/Welding
|
1/13/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
1/14/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Steel/Welding
|
1/14/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Reinforced Concrete Frame
|
1/14/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
1/15/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Steel/Welding
|
1/15/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Reinforced Concrete Frame
|
1/21/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
1/25/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
1/26/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
1/27/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
1/28/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Reinforced Concrete Frame
|
1/28/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
1/29/2016
|
Partial Approval
|
JAMES POWERS
|
Light Gage Steel Frame
|
2/3/2016
|
Partial Approval
|
JAMES POWERS
|
Reinforced Concrete Frame
|
2/4/2016
|
Partial Approval
|
MICHAEL KUHN
|
Footing/Foundation/Slab
|
2/11/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Reinforced Concrete Frame
|
2/18/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
2/22/2016
|
No Access for Inspection
|
LESLIE TRUJILLO
|
Light Gage Steel Frame
|
2/22/2016
|
No Access for Inspection
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
2/23/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Insulation
|
2/23/2016
|
Not Ready for Inspection
|
LESLIE TRUJILLO
|
Light Gage Steel Frame
|
2/23/2016
|
Not Ready for Inspection
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
2/24/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
2/25/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Insulation
|
2/25/2016
|
Partial Inspection
|
LESLIE TRUJILLO
|
Light Gage Steel Frame
|
2/25/2016
|
Partial Inspection
|
LESLIE TRUJILLO
|
Pre-Inspection
|
2/25/2016
|
Partial Inspection
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
2/26/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Reinforced Concrete Frame
|
2/26/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Insulation
|
3/2/2016
|
Partial Inspection
|
LESLIE TRUJILLO
|
Reinforced Concrete Frame
|
3/3/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Reinforced Concrete Frame
|
3/10/2016
|
Partial Approval
|
SAKO AGHAZARIAN
|
Deputy Reinf. Concrete
|
3/15/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Steel/Welding
|
3/15/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
3/16/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Steel/Welding
|
3/16/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
3/17/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Steel/Welding
|
3/17/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Insulation
|
3/17/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Light Gage Steel Frame
|
3/17/2016
|
Partial Inspection
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
3/18/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Steel/Welding
|
3/18/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Footing/Foundation/Slab
|
3/21/2016
|
No Access for Inspection
|
LESLIE TRUJILLO
|
Drywall Nailing
|
3/23/2016
|
Not Ready for Inspection
|
LESLIE TRUJILLO
|
Pre-Inspection
|
3/23/2016
|
Partial Inspection
|
LESLIE TRUJILLO
|
Insulation
|
3/24/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Pre-Stress Concrete
|
3/29/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
3/29/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
3/29/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Pre-Stress Concrete
|
3/30/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
3/30/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
3/30/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Reinforced Concrete Frame
|
3/30/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Pre-Stress Concrete
|
3/31/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
3/31/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
3/31/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Pre-Stress Concrete
|
4/1/2016
|
Conditional Approval
|
WINSTON DUNNING
|
Deputy Reinf. Concrete
|
4/1/2016
|
Conditional Approval
|
WINSTON DUNNING
|
Deputy Reinf. Masonry
|
4/1/2016
|
Conditional Approval
|
WINSTON DUNNING
|
Deputy Pre-Stress Concrete
|
4/4/2016
|
Conditional Approval
|
WINSTON DUNNING
|
Deputy Reinf. Concrete
|
4/4/2016
|
Conditional Approval
|
WINSTON DUNNING
|
Deputy Reinf. Masonry
|
4/4/2016
|
Conditional Approval
|
WINSTON DUNNING
|
Deputy Pre-Stress Concrete
|
4/5/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
4/5/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
4/5/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Pre-Stress Concrete
|
4/6/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
4/6/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
4/6/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Pre-Stress Concrete
|
4/7/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
4/7/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
4/7/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Reinforced Concrete Frame
|
4/7/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Pre-Stress Concrete
|
4/8/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
4/8/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
4/8/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Pre-Stress Concrete
|
4/11/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
4/11/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
4/11/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Steel/Welding
|
4/11/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Light Gage Steel Frame
|
4/11/2016
|
Partial Inspection
|
LESLIE TRUJILLO
|
Deputy Pre-Stress Concrete
|
4/12/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
4/12/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
4/12/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Steel/Welding
|
4/12/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Pre-Stress Concrete
|
4/13/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
4/13/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
4/13/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Steel/Welding
|
4/13/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Pre-Stress Concrete
|
4/14/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
4/14/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
4/14/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Steel/Welding
|
4/14/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Pre-Stress Concrete
|
4/15/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
4/15/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
4/15/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Steel/Welding
|
4/15/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Insulation
|
4/15/2016
|
Corrections Issued
|
LESLIE TRUJILLO
|
Reinforced Concrete Frame
|
4/15/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Pre-Stress Concrete
|
4/18/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
4/18/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
4/18/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Steel/Welding
|
4/18/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Pre-Stress Concrete
|
4/19/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
4/19/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
4/19/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Pre-Stress Concrete
|
4/20/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
4/20/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
4/20/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Insulation
|
4/20/2016
|
Partial Inspection
|
LESLIE TRUJILLO
|
Light Gage Steel Frame
|
4/20/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Pre-Stress Concrete
|
4/21/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
4/21/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
4/21/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Pre-Stress Concrete
|
4/22/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
4/22/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
4/22/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Light Gage Steel Frame
|
4/22/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
4/25/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
4/25/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Insulation
|
4/25/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
4/26/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
4/26/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
4/27/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
4/27/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
4/28/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
4/28/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Drywall Nailing
|
4/28/2016
|
Partial Inspection
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
4/29/2016
|
Conditional Approval
|
WINSTON DUNNING
|
Deputy Reinf. Masonry
|
4/29/2016
|
Conditional Approval
|
WINSTON DUNNING
|
Deputy Reinf. Concrete
|
5/3/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
5/3/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Drywall Nailing
|
5/3/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Insulation
|
5/3/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Light Gage Steel Frame
|
5/3/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
5/4/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
5/4/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Drywall Nailing
|
5/4/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
5/5/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
5/5/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
5/6/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
5/6/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
5/9/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
5/9/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
5/10/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
5/10/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Drywall Nailing
|
5/10/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
5/11/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
5/11/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Reinforced Concrete Frame
|
5/11/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
5/12/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
5/12/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
5/13/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
5/13/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Drywall Nailing
|
5/13/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Insulation
|
5/13/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Light Gage Steel Frame
|
5/13/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
5/16/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
5/16/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Grading Pre-Inspection
|
5/16/2016
|
Partial Inspection
|
LESLIE TRUJILLO
|
Light Gage Steel Frame
|
5/16/2016
|
Partial Inspection
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
5/17/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
5/17/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Drywall Nailing
|
5/17/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Insulation
|
5/17/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Light Gage Steel Frame
|
5/17/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
5/18/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
5/18/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
5/19/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
5/19/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
5/20/2016
|
Approved
|
MICHAEL KUHN
|
Deputy Reinf. Masonry
|
5/20/2016
|
Approved
|
MICHAEL KUHN
|
Drywall Nailing
|
5/20/2016
|
Partial Inspection
|
TIMOTHY LYNN
|
Insulation
|
5/20/2016
|
Partial Inspection
|
TIMOTHY LYNN
|
Light Gage Steel Frame
|
5/20/2016
|
Partial Inspection
|
TIMOTHY LYNN
|
Deputy Reinf. Concrete
|
5/23/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
5/23/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Drywall Nailing
|
5/23/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Insulation
|
5/23/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Light Gage Steel Frame
|
5/23/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
5/24/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
5/24/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
5/25/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
5/25/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Drywall Nailing
|
5/25/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Insulation
|
5/25/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Light Gage Steel Frame
|
5/25/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
5/26/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
5/26/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
5/27/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
5/27/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Light Gage Steel Frame
|
5/31/2016
|
Partial Inspection
|
LESLIE TRUJILLO
|
Drywall Nailing
|
6/2/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Insulation
|
6/2/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Interior/Exterior Lathing
|
6/2/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Light Gage Steel Frame
|
6/2/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
6/6/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
6/6/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
6/7/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
6/7/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
6/8/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
6/8/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Steel/Welding
|
6/8/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
6/9/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
6/9/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Steel/Welding
|
6/9/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Drywall Nailing
|
6/9/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Insulation
|
6/9/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Light Gage Steel Frame
|
6/9/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
6/10/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
6/10/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Steel/Welding
|
6/10/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
6/13/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
6/13/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
6/14/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
6/14/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
6/15/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
6/15/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
6/16/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
6/16/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Drywall Nailing
|
6/16/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Insulation
|
6/16/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Light Gage Steel Frame
|
6/16/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
6/17/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
6/17/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
6/20/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
6/20/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
6/21/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
6/21/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
6/22/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
6/22/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Drywall Nailing
|
6/22/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Insulation
|
6/22/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Light Gage Steel Frame
|
6/22/2016
|
Partial Inspection
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
6/23/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
6/23/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
6/24/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
6/24/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Drywall Nailing
|
6/29/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Insulation
|
6/29/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Light Gage Steel Frame
|
6/29/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Drywall Nailing
|
7/7/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Insulation
|
7/7/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Light Gage Steel Frame
|
7/7/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
7/8/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
7/11/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Drywall Nailing
|
7/13/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Insulation
|
7/13/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Light Gage Steel Frame
|
7/13/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Drywall Nailing
|
7/20/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Insulation
|
7/20/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Light Gage Steel Frame
|
7/20/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Special/Order Compliance
|
7/29/2016
|
Corrections Issued
|
LESLIE TRUJILLO
|
Drywall Nailing
|
8/1/2016
|
Partial Approval
|
JAMES POWERS
|
Insulation
|
8/1/2016
|
Partial Approval
|
JAMES POWERS
|
Light Gage Steel Frame
|
8/1/2016
|
Partial Approval
|
JAMES POWERS
|
Drywall Nailing
|
8/5/2016
|
Partial Approval
|
JAMES POWERS
|
Insulation
|
8/5/2016
|
Partial Approval
|
JAMES POWERS
|
Drywall Nailing
|
8/17/2016
|
Partial Approval
|
JAMES POWERS
|
Insulation
|
8/17/2016
|
Partial Approval
|
JAMES POWERS
|
Drywall Nailing
|
8/26/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Light Gage Steel Frame
|
8/26/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Insulation
|
8/31/2016
|
Corrections Issued
|
LESLIE TRUJILLO
|
Insulation
|
9/7/2016
|
Not Ready for Inspection
|
LESLIE TRUJILLO
|
Light Gage Steel Frame
|
9/7/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Insulation
|
9/12/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Light Gage Steel Frame
|
9/15/2016
|
Not Ready for Inspection
|
LESLIE TRUJILLO
|
Drywall Nailing
|
9/19/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Light Gage Steel Frame
|
9/19/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Drywall Nailing
|
9/23/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Insulation
|
9/23/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Light Gage Steel Frame
|
9/23/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Drywall Nailing
|
10/7/2016
|
Not Ready for Inspection
|
NICK DANERI
|
Insulation
|
10/7/2016
|
Not Ready for Inspection
|
NICK DANERI
|
Light Gage Steel Frame
|
10/7/2016
|
Not Ready for Inspection
|
NICK DANERI
|
Pre-Inspection
|
10/7/2016
|
Not Ready for Inspection
|
NICK DANERI
|
Drywall Nailing
|
10/12/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Insulation
|
10/12/2016
|
Not Ready for Inspection
|
LESLIE TRUJILLO
|
Light Gage Steel Frame
|
10/12/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Pre-Inspection
|
10/13/2016
|
Partial Inspection
|
LESLIE TRUJILLO
|
Light Gage Steel Frame
|
10/17/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Insulation
|
10/19/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Light Gage Steel Frame
|
11/16/2016
|
Partial Approval
|
LESLIE TRUJILLO
|
Green Building Final
|
11/18/2016
|
Partial Inspection
|
DONALD CRICHLOW
|
Special/Order Compliance
|
12/14/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Special/Order Compliance
|
1/11/2017
|
Not Ready for Inspection
|
WINSTON DUNNING
|
Special/Order Compliance
|
1/12/2017
|
Partial Inspection
|
LESLIE TRUJILLO
|
Special/Order Compliance
|
1/20/2017
|
Partial Inspection
|
LESLIE TRUJILLO
|
Special/Order Compliance
|
1/24/2017
|
Corrections Issued
|
LESLIE TRUJILLO
|
Special/Order Compliance
|
1/26/2017
|
Partial Inspection
|
LESLIE TRUJILLO
|
Special/Order Compliance
|
1/31/2017
|
Partial Inspection
|
LESLIE TRUJILLO
|
Final
|
2/6/2017
|
Not Ready for Inspection
|
LESLIE TRUJILLO
|
Footing/Foundation/Slab
|
2/6/2017
|
Approved
|
LESLIE TRUJILLO
|
Green Building Final
|
2/6/2017
|
Partial Approval
|
DONALD CRICHLOW
|
Reinforced Concrete Frame
|
2/6/2017
|
Approved
|
LESLIE TRUJILLO
|
SGSOV-Seismic Gas S/O Valve
|
2/6/2017
|
SGSOV Approved
|
LESLIE TRUJILLO
|
Smoke Detectors
|
2/6/2017
|
Approved
|
LESLIE TRUJILLO
|
Green Building Rough
|
2/7/2017
|
Approved
|
DONALD CRICHLOW
|
Final
|
2/8/2017
|
Partial Inspection
|
LESLIE TRUJILLO
|
Green Building Final
|
2/8/2017
|
Corrections Issued
|
DONALD CRICHLOW
|
Reinforced Concrete Frame
|
2/8/2017
|
Approved
|
LESLIE TRUJILLO
|
Special/Order Compliance
|
2/8/2017
|
Partial Inspection
|
LESLIE TRUJILLO
|
Green Building Final
|
2/10/2017
|
Partial Approval
|
DONALD CRICHLOW
|
Special/Order Compliance
|
2/10/2017
|
Conditional Approval
|
LESLIE TRUJILLO
|
Green Building Final
|
3/9/2017
|
Partial Inspection
|
DONALD CRICHLOW
|
Green Building Final
|
6/2/2017
|
Partial Approval
|
RICHARD DOCKUS
|
Green Building Final
|
6/21/2017
|
Conditional Approval
|
DONALD CRICHLOW
|
Green Building Final
|
6/22/2017
|
Approved
|
DONALD CRICHLOW
|
Special/Order Compliance
|
7/24/2017
|
Partial Inspection
|
LESLIE TRUJILLO
|
Final
|
7/25/2017
|
Partial Inspection
|
LESLIE TRUJILLO
|
Final
|
10/2/2017
|
Partial Inspection
|
LESLIE TRUJILLO
|
Final
|
10/4/2017
|
OK to Issue CofO
|
LESLIE TRUJILLO
|