1201 S HOPE ST 90015

Certificate Information: 1201 S HOPE ST 90015

Application / Permit
14010-10011-01777
Plan Check / Job No.
B19LA10188
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
PROPOSED REVISIONS BUILDING THAT IS UNDER CONSTRUCTION AND ISSUED UNDER 14010-10000-01777- CHANGES TO TOWERS 1 AND 2. THE STRUCTURAL CHANGES HAVE BEEN APPROVED UNDER 14010-10013-01777. THE POOLS ARE DEFERRED APPROVALS FLOOR PLAN CHANGES, RENUMBERING THE FLOOR LEVELS BY EXCLUDING LEVELS 13 AND 14, STAIRS RELABELED AT EACH TOWER PER FD REQUEST ORIG WORK DESC= PROPOSED 32 story highrise TOWER AT FLOWER ST with 303 apartment Units, 3,211sf of ground floor retail including 4 levels of subterranean parking and 7 levels of podium parking. THE 2ND TOWER IS AT 12TH ST AND DESCRIBED AS 40 story high rise with 363 apartment Units, 4,101sf of ground floor retail including 3 levels of subterranean parking and 7 levels of podium parking. BOTH TOWERS SHARE A COMMON PODIUM
Permit Issued
Issued on 12/12/2019
Issuing Office
Metro
Current Status
Permit Finaled on 12/11/2020
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 5/16/2019 APPLICANT
Assigned to Plan Check Engineer 5/30/2019 JOHN VASQUEZ
Green Plans Picked Up 5/30/2019 APPLICANT
Corrections Issued 6/6/2019 JOHN VASQUEZ
Quality Review Completed 6/10/2019 CHARLES CHANG
Applicant returned to address corrections 8/6/2019 JOHN VASQUEZ
Applicant returned to address corrections 8/27/2019 JOHN VASQUEZ
Applicant returned to address corrections 9/12/2019 JOHN VASQUEZ
Applicant returned to address corrections 9/24/2019 JOHN VASQUEZ
Disabled Access Plans Picked Up 10/17/2019 APPLICANT
Applicant returned to address corrections 11/5/2019 JOHN VASQUEZ
Plan Check Approved 11/19/2019 JOHN VASQUEZ
Issued 12/12/2019 LADBS
Permit Finaled 12/11/2020 NICK DANERI

Permit Application Clearance Information

DAS Clearance Cleared 5/31/2019 WAI LAU
Building over 3-story or 36-ft Cleared 6/6/2019 CALOSHA APPROVED
Eng Process Fee Ord 176,300 Cleared 7/19/2019 JAMES KHO
Project located in CRA area Cleared 7/19/2019 JIM URQUHART
Roof/Waste drainage to street Cleared 7/19/2019 JAMES KHO
Sewer availability Cleared 7/19/2019 JAMES KHO
Low Impact Development Cleared 7/30/2019 MITESH PATEL
Stormwater Pollution Mitigatn Cleared 7/30/2019 MITESH PATEL
"D" conditions Cleared 8/6/2019 SOPHIE GABEL-SCHEINBAU
"Q" conditions Cleared 8/6/2019 SOPHIE GABEL-SCHEINBAU
Opn space landscape/Water mgmt Cleared 8/6/2019 SOPHIE GABEL-SCHEINBAU
Site Plan review Cleared 8/6/2019 SOPHIE GABEL-SCHEINBAU
Tract Map conditions Cleared 8/6/2019 SOPHIE GABEL-SCHEINBAU
ZA Case Cleared 8/6/2019 SOPHIE GABEL-SCHEINBAU
Fire Marshall Fire Life Safety Cleared 9/24/2019 WILLIAM JOHNS
CPC Cleared 10/22/2019 SOPHIE GABEL-SCHEINBAU
Green Code Cleared 10/22/2019 DONALD CRICHLOW

Contact Information

Architect Dikeakos, Christos; Lic. No.: C28024 212-3989 HENNING DR      BURNABY BC, V5C 6N5
Contractor Onni Contracting (California) Inc; Lic. No.: 976929-B 315 WEST 9TH STREET #801      LOS ANGELES, CA 90015
Engineer Cortez, Artedi Baligod; Lic. No.: GE239 7091 LISA LANE      WESTMINSTER, CA 92683
Engineer O'Keeffe, Michael John; Lic. No.: S4879 1661 W 5TH AVE      VANCOUVER, BC, V6J1N5
Engineer Powers, Brian Frederick; Lic. No.: C75902 2090 WEST 31ST STREET      LOS ANGELES, CA 90018

Inspector Information

NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

No Data Available.