2025 S AVENUE OF THE STARS 90067

Certificate Information: 2025 S AVENUE OF THE STARS 90067

Application / Permit
14014-10000-05098
Plan Check / Job No.
B14LA16061
Group
Building
Type
Bldg-Addition
Sub-Type
Commercial
Primary Use
(11) Hotel
Work Description
MAJOR RENOVATION OF (E) 16-STORY HOTEL & CONVERT GUEST ROOMS FROM LEVEL 12 THROUGH LEVEL 16 TO DWELLING UNITS, TOAL 394 GUEST ROOMS & 67 DWELLING UNITS & ADD. NEW POOLS ON ROOF & CONVERT (E) STORAGE & SHOP @ LEVEL B1 TO GYM & SPA & INSTALL NEW ELEVATED RAMPS AT PODIUM LEVEL.
Permit Issued
Issued on 2/13/2017
Issuing Office
Metro
Current Status
CofO Issued on 9/30/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 11/25/2014 APPLICANT
Assigned to Plan Check Engineer 12/19/2014 GARO TELMI
Disabled Access Plans Picked Up 12/19/2014 APPLICANT
Green Plans Picked Up 1/14/2015 APPLICANT
Corrections Issued 2/10/2015 GARO TELMI
Quality Review Completed 2/27/2015 BILL STUTSMAN
Applicant returned to address corrections 4/1/2015 GARO TELMI
Applicant returned to address corrections 4/10/2015 GARO TELMI
Applicant returned to address corrections 10/8/2015 GARO TELMI
Building Plans Picked Up 11/24/2015 APPLICANT
Applicant returned to address corrections 11/30/2015 GARO TELMI
Applicant returned to address corrections 12/14/2015 GARO TELMI
Applicant returned to address corrections 2/11/2016 GARO TELMI
Applicant returned to address corrections 3/3/2016 GARO TELMI
Applicant returned to address corrections 3/10/2016 GARO TELMI
Applicant returned to address corrections 4/21/2016 GARO TELMI
Applicant returned to address corrections 4/28/2016 GARO TELMI
Applicant returned to address corrections 10/17/2016 GARO TELMI
Plan Check Approved 2/10/2017 GARO TELMI
Issued 2/13/2017 LADBS
TCO Issued (Expire Date: 04-11-2021) 10/13/2020 JAMES GARRISON
TCO Issued (Expire Date: 07-21-2021) 1/22/2021 TED RIES
TCO Issued (Expire Date: 10-09-2021) 4/12/2021 TED RIES
TCO Issued (Expire Date: 01-17-2022) 7/21/2021 TED RIES
TCO Issued (Expire Date: 04-06-2022) 10/8/2021 HENRY BAGHDASSARIAN
TCO Issued (Expire Date: 10-04-2022) 4/7/2022 TERRY HERR
TCO Issued (Expire Date: 04-03-2023) 10/5/2022 DAVID TSAU
TCO Issued (Expire Date: 09-30-2023) 4/3/2023 HENRY BAGHDASSARIAN
CofO in Progress 9/28/2023 PAUL DAVIDSON
CofO Issued 9/30/2023 DAVID TSAU
Permit Finaled 9/30/2023 DAVID TSAU

Permit Application Clearance Information

Low Impact Development Cleared 2/16/2016 AMMAR ELTAWIL
Stormwater Pollution Mitigatn Cleared 2/16/2016 AMMAR ELTAWIL
Abandoned oil well approval Cleared 3/24/2016 ROBERT DUFF
Highway dedication Cleared 3/24/2016 ARMENIA HERNANDEZ
Hydrant and Access approval Cleared 3/24/2016 ROBERT DUFF
Eng Process Fee Ord 176,300 Cleared 3/30/2016 SHANNON CAMPBELL
Driveway location Cleared 4/7/2016 EDDIE GUERRERO
Internal circulation Cleared 4/7/2016 EDDIE GUERRERO
Permit Cleared 4/19/2016 PHONG NGUYEN
Roof/Waste drainage to street Cleared 4/19/2016 PHONG NGUYEN
Encroachment in public way Cleared 4/20/2016 ARMENIA HERNANDEZ
Green Code Cleared 4/20/2016 ALDO UBAU
DAS Clearance Cleared 4/22/2016 WAI LAU
Specific Plan Cleared 5/11/2016 EDDIE GUERRERO
Transportation Demand Ord. Cleared 5/11/2016 EDDIE GUERRERO
Fire Marshall Fire Life Safety Cleared 8/4/2016 ANDREW KO
Sewer availability Cleared 8/9/2016 VALENTINO PUEBLOS
Miscellaneous Cleared 9/22/2016 LAMBERT GIESSINGER
Methane Ordinance Cleared 12/12/2016 DAVE MYERS
CPC Cleared 1/31/2017 MARITZA PRZEKOP
CPC Cleared 1/31/2017 MARITZA PRZEKOP
City Hist. Cultural Monument Cleared 1/31/2017 MARITZA PRZEKOP
Miscellaneous Cleared 1/31/2017 MARITZA PRZEKOP
Miscellaneous Cleared 1/31/2017 MARITZA PRZEKOP
Miscellaneous Cleared 1/31/2017 MARITZA PRZEKOP
Opn space landscape/Water mgmt Cleared 1/31/2017 MARITZA PRZEKOP
Private street Cleared 1/31/2017 MARITZA PRZEKOP
Prkng lot landscape/Water mgmt Cleared 1/31/2017 MARITZA PRZEKOP
Site Plan review Cleared 1/31/2017 MARITZA PRZEKOP
Specific Plan Cleared 1/31/2017 MARITZA PRZEKOP
Tract Map conditions Cleared 1/31/2017 MARITZA PRZEKOP
Tract Map conditions Cleared 1/31/2017 MARITZA PRZEKOP
Tract Map conditions Cleared 1/31/2017 MARITZA PRZEKOP
ZA Case Cleared 1/31/2017 MARITZA PRZEKOP
ZA Case Cleared 1/31/2017 MARITZA PRZEKOP
ZA Case Cleared 1/31/2017 MARITZA PRZEKOP
ZA Case Cleared 1/31/2017 MARITZA PRZEKOP
ZA Case Cleared 1/31/2017 MARITZA PRZEKOP
ZI Cleared 1/31/2017 MARITZA PRZEKOP
ZI Cleared 1/31/2017 MARITZA PRZEKOP
Miscellaneous Cleared 2/6/2017 DAVID PEREZ
Miscellaneous Cleared 2/6/2017 PHONG NGUYEN
Work Adjacent to Public Way Cleared 2/6/2017 DAVID PEREZ
Building over 3-story or 36-ft Cleared 2/10/2017 CALOSHA APPROVED
Grading Pre-Inspection Cleared 2/10/2017 JEFFREY DURAN
Miscellaneous Cleared 2/10/2017 GARO TELMI
Miscellaneous Cleared 2/10/2017 GARO TELMI

Contact Information

Architect Cohen, Andrew Phillip; Lic. No.: C12855 500 S FIGUEROA STREET      LOS ANGELES, CA 90071
Architect Marmol, Leonardo Emilio; Lic. No.: C22376 12210 NEBRASKA AVENUE   MARMOL & RADZINER & ASSOCIATES    LOS ANGELES, CA 90025
Architect Sawano, Albert Harumi; Lic. No.: C22918 1481 INDIANA AVE      SOUTH PASADENA, CA 91030
Architect Wicksman, Warwick Ian; Lic. No.: C23350 22844 DOLOROSA ST      WOODLAND HILLS, CA 91367
Contractor Webcor Construction L P; Lic. No.: 899242-B 1751 HARBOR BAY PARKWAY #200      ALAMEDA, CA 94502
Engineer Ho, Lawrence Ying Kuen; Lic. No.: S3259 888 S FIGUEROA STREET      LOS ANGELES, CA 90017

Inspector Information

RICARDO ROBLES, (310) 914-3920 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 6/2/2017 Partial Inspection TONY HARTONO
Deputy Steel/Welding 6/13/2017 Conditional Approval TONY HARTONO
Deputy Steel/Welding 6/28/2017 Approved TONY HARTONO
Deputy Steel/Welding 6/29/2017 Approved TONY HARTONO
Deputy Steel/Welding 6/30/2017 Approved TONY HARTONO
Deputy Steel/Welding 7/25/2017 Approved JASON BORUTA
Deputy Steel/Welding 7/26/2017 Approved TONY HARTONO
Deputy Steel/Welding 8/3/2017 Approved TONY HARTONO
Deputy Steel/Welding 8/4/2017 Approved TONY HARTONO
Deputy Steel/Welding 8/9/2017 Approved TONY HARTONO
Deputy Steel/Welding 8/10/2017 Conditional Approval TONY HARTONO
Deputy Steel/Welding 8/16/2017 Approved TONY HARTONO
Deputy Steel/Welding 8/17/2017 Approved TONY HARTONO
Deputy Steel/Welding 8/18/2017 Approved TONY HARTONO
Deputy Steel/Welding 8/23/2017 Approved TONY HARTONO
Deputy Steel/Welding 8/24/2017 Approved TONY HARTONO
Deputy Steel/Welding 8/25/2017 Approved TONY HARTONO
Deputy Steel/Welding 8/28/2017 Approved TONY HARTONO
Deputy Steel/Welding 8/29/2017 Approved TONY HARTONO
Deputy Steel/Welding 9/6/2017 Approved TONY HARTONO
Deputy Steel/Welding 9/7/2017 Approved TONY HARTONO
Deputy Steel/Welding 9/8/2017 Approved TONY HARTONO
Deputy Steel/Welding 9/11/2017 Approved TONY HARTONO
Deputy Steel/Welding 9/12/2017 Approved TONY HARTONO
Deputy Steel/Welding 9/13/2017 Approved TONY HARTONO
Deputy Steel/Welding 9/14/2017 Approved TONY HARTONO
Footing/Foundation/Slab 9/14/2017 Partial Approval TONY HARTONO
METHANE-Barrier 9/14/2017 Not Ready for Inspection TONY HARTONO
METHANE-Subgrade 9/14/2017 Not Ready for Inspection TONY HARTONO
Deputy Reinf. Concrete 9/15/2017 Approved TONY HARTONO
Deputy Steel/Welding 9/15/2017 Approved TONY HARTONO
Deputy Steel/Welding 9/19/2017 Approved TONY HARTONO
Deputy Steel/Welding 9/20/2017 Approved TONY HARTONO
Deputy Steel/Welding 9/21/2017 Approved TONY HARTONO
Deputy Steel/Welding 9/22/2017 Approved TONY HARTONO
Deputy Steel/Welding 9/25/2017 Approved TONY HARTONO
Deputy Steel/Welding 9/26/2017 Approved TONY HARTONO
Deputy Steel/Welding 9/27/2017 Approved TONY HARTONO
Deputy Steel/Welding 9/28/2017 Approved TONY HARTONO
Deputy Steel/Welding 9/29/2017 Approved TONY HARTONO
Deputy Steel/Welding 10/2/2017 Approved DERRICK SPENCER
Deputy Steel/Welding 10/4/2017 Approved TONY HARTONO
Deputy Steel/Welding 10/5/2017 Approved TONY HARTONO
Deputy Reinf. Concrete 10/6/2017 Approved TONY HARTONO
Deputy Steel/Welding 10/6/2017 Approved TONY HARTONO
Footing/Foundation/Slab 10/6/2017 Not Ready for Inspection TONY HARTONO
METHANE-Barrier 10/6/2017 Not Ready for Inspection TONY HARTONO
METHANE-Subgrade 10/6/2017 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 10/11/2017 Approved TONY HARTONO
Deputy Reinf. Concrete 10/11/2017 Approved TONY HARTONO
Deputy Steel/Welding 10/11/2017 Approved TONY HARTONO
Deputy Drilled-In Anchors 10/12/2017 Approved TONY HARTONO
Deputy Reinf. Concrete 10/12/2017 Approved TONY HARTONO
Deputy Steel/Welding 10/12/2017 Approved TONY HARTONO
Deputy Drilled-In Anchors 10/13/2017 Approved TONY HARTONO
Deputy Reinf. Concrete 10/13/2017 Approved TONY HARTONO
Deputy Steel/Welding 10/13/2017 Approved TONY HARTONO
Deputy Drilled-In Anchors 10/16/2017 Approved TONY HARTONO
Deputy Reinf. Concrete 10/16/2017 Approved TONY HARTONO
Deputy Steel/Welding 10/16/2017 Approved TONY HARTONO
Deputy Drilled-In Anchors 10/17/2017 Approved TONY HARTONO
Deputy Reinf. Concrete 10/17/2017 Approved TONY HARTONO
Deputy Steel/Welding 10/17/2017 Approved TONY HARTONO
Deputy Drilled-In Anchors 10/18/2017 Approved TONY HARTONO
Deputy Reinf. Concrete 10/18/2017 Approved TONY HARTONO
Deputy Steel/Welding 10/18/2017 Approved TONY HARTONO
Deputy Drilled-In Anchors 10/19/2017 Approved TONY HARTONO
Deputy Reinf. Concrete 10/19/2017 Approved TONY HARTONO
Deputy Steel/Welding 10/19/2017 Approved TONY HARTONO
Deputy Drilled-In Anchors 10/20/2017 Approved TONY HARTONO
Deputy Reinf. Concrete 10/20/2017 Approved TONY HARTONO
Deputy Steel/Welding 10/20/2017 Approved TONY HARTONO
Footing/Foundation/Slab 10/20/2017 Partial Inspection TONY HARTONO
METHANE-Barrier 10/20/2017 Not Ready for Inspection TONY HARTONO
METHANE-Subgrade 10/20/2017 Not Ready for Inspection TONY HARTONO
Deputy Steel/Welding 10/23/2017 Approved TONY HARTONO
Deputy Drilled-In Anchors 10/24/2017 Approved TONY HARTONO
Deputy Reinf. Concrete 10/24/2017 Approved TONY HARTONO
Deputy Steel/Welding 10/24/2017 Approved TONY HARTONO
Footing/Foundation/Slab 10/24/2017 Partial Approval TONY HARTONO
Deputy Drilled-In Anchors 10/25/2017 Approved DERRICK SPENCER
Deputy Reinf. Concrete 10/25/2017 Approved DERRICK SPENCER
Deputy Steel/Welding 10/25/2017 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 10/26/2017 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 10/26/2017 Approved JONATHAN ALLEN
Deputy Steel/Welding 10/26/2017 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 10/27/2017 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 10/27/2017 Approved JONATHAN ALLEN
Deputy Steel/Welding 10/27/2017 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 10/30/2017 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 10/30/2017 Approved JONATHAN ALLEN
Pre-Inspection 10/30/2017 Approved JONATHAN ALLEN
Structural Steel Frame 10/30/2017 Partial Approval JONATHAN ALLEN
Deputy Steel/Welding 10/31/2017 Approved JONATHAN ALLEN
Deputy Steel/Welding 11/1/2017 Approved JONATHAN ALLEN
Deputy Grading 11/2/2017 Approved JONATHAN ALLEN
Deputy Steel/Welding 11/2/2017 Approved JONATHAN ALLEN
Deputy Grading 11/3/2017 Approved JONATHAN ALLEN
Deputy Steel/Welding 11/3/2017 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 11/6/2017 Approved JONATHAN ALLEN
Deputy Grading 11/6/2017 Approved JONATHAN ALLEN
Deputy Steel/Welding 11/6/2017 Approved JONATHAN ALLEN
Footing/Foundation/Slab 11/6/2017 Partial Approval JONATHAN ALLEN
METHANE-Barrier 11/6/2017 Not Ready for Inspection JONATHAN ALLEN
METHANE-Subgrade 11/6/2017 Not Ready for Inspection JONATHAN ALLEN
Deputy Drilled-In Anchors 11/7/2017 Approved DERRICK SPENCER
Deputy Grading 11/7/2017 Approved DERRICK SPENCER
Deputy Steel/Welding 11/7/2017 Approved DERRICK SPENCER
Deputy Grading 11/8/2017 Approved JONATHAN ALLEN
Deputy Steel/Welding 11/8/2017 Approved JONATHAN ALLEN
Floor/Roof Diaphrgm/Shear Wall 11/8/2017 Partial Approval JONATHAN ALLEN
Deputy Grading 11/9/2017 Approved JONATHAN ALLEN
Deputy Steel/Welding 11/9/2017 Approved JONATHAN ALLEN
Excavation/Setback/Form/Re-Bar 11/9/2017 Partial Approval JONATHAN ALLEN
Deputy Grading 11/13/2017 Approved TONY HARTONO
Footing/Foundation/Slab 11/13/2017 Not Ready for Inspection TONY HARTONO
METHANE-Barrier 11/13/2017 Not Ready for Inspection TONY HARTONO
METHANE-Subgrade 11/13/2017 Not Ready for Inspection TONY HARTONO
Deputy Grading 11/14/2017 Approved TONY HARTONO
Deputy Steel/Welding 11/14/2017 Approved TONY HARTONO
Deputy Reinf. Concrete 11/15/2017 Approved TONY HARTONO
Deputy Steel/Welding 11/15/2017 Approved TONY HARTONO
Deputy Reinf. Concrete 11/16/2017 Approved TONY HARTONO
Deputy Steel/Welding 11/16/2017 Approved TONY HARTONO
Green Building Rough 11/16/2017 Not Ready for Inspection TONY HARTONO
METHANE-Rough 11/16/2017 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 11/16/2017 Partial Approval TONY HARTONO
Deputy Reinf. Concrete 11/17/2017 Approved TONY HARTONO
Deputy Steel/Welding 11/17/2017 Approved TONY HARTONO
Deputy Steel/Welding 11/20/2017 Approved TONY HARTONO
Deputy Steel/Welding 11/21/2017 Approved TONY HARTONO
Deputy Steel/Welding 11/22/2017 Approved TONY HARTONO
Footing/Foundation/Slab 11/22/2017 Partial Approval TONY HARTONO
METHANE-Barrier 11/22/2017 Not Ready for Inspection TONY HARTONO
METHANE-Subgrade 11/22/2017 Not Ready for Inspection TONY HARTONO
Deputy Steel/Welding 11/28/2017 Approved TONY HARTONO
Deputy Steel/Welding 11/29/2017 Approved TONY HARTONO
Deputy Drilled-In Anchors 11/30/2017 Approved TONY HARTONO
Deputy Steel/Welding 11/30/2017 Approved TONY HARTONO
Deputy Steel/Welding 12/1/2017 Approved TONY HARTONO
Deputy Steel/Welding 12/4/2017 Approved TONY HARTONO
Deputy Steel/Welding 12/5/2017 Approved TONY HARTONO
Deputy Drilled-In Anchors 12/7/2017 Approved TONY HARTONO
Deputy Steel/Welding 12/7/2017 Approved TONY HARTONO
Deputy Drilled-In Anchors 12/8/2017 Approved TONY HARTONO
Deputy Steel/Welding 12/8/2017 Approved TONY HARTONO
Deputy Drilled-In Anchors 12/11/2017 Approved TONY HARTONO
Deputy Steel/Welding 12/11/2017 Approved TONY HARTONO
Footing/Foundation/Slab 12/11/2017 Partial Approval TONY HARTONO
Green Building Rough 12/11/2017 Not Ready for Inspection TONY HARTONO
METHANE-Barrier 12/11/2017 Not Ready for Inspection TONY HARTONO
METHANE-Rough 12/11/2017 Not Ready for Inspection TONY HARTONO
METHANE-Subgrade 12/11/2017 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 12/11/2017 Partial Inspection TONY HARTONO
Deputy Drilled-In Anchors 12/12/2017 Approved TONY HARTONO
Deputy Grading 12/12/2017 Approved TONY HARTONO
Deputy Reinf. Concrete 12/12/2017 Approved TONY HARTONO
Deputy Steel/Welding 12/12/2017 Approved TONY HARTONO
Deputy Drilled-In Anchors 12/13/2017 Approved TONY HARTONO
Deputy Grading 12/13/2017 Approved TONY HARTONO
Deputy Steel/Welding 12/13/2017 Approved TONY HARTONO
Footing/Foundation/Slab 12/13/2017 Not Ready for Inspection TONY HARTONO
METHANE-Barrier 12/13/2017 Not Ready for Inspection TONY HARTONO
METHANE-Subgrade 12/13/2017 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 12/14/2017 Approved TONY HARTONO
Deputy Steel/Welding 12/14/2017 Approved TONY HARTONO
Green Building Rough 12/14/2017 Not Ready for Inspection TONY HARTONO
METHANE-Rough 12/14/2017 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 12/14/2017 Partial Approval TONY HARTONO
Deputy Drilled-In Anchors 12/15/2017 Approved TONY HARTONO
Deputy Steel/Welding 12/15/2017 Approved TONY HARTONO
Deputy Drilled-In Anchors 12/18/2017 Approved TONY HARTONO
Deputy Steel/Welding 12/18/2017 Approved TONY HARTONO
Deputy Drilled-In Anchors 12/19/2017 Approved TONY HARTONO
Deputy Reinf. Concrete 12/19/2017 Approved TONY HARTONO
Deputy Steel/Welding 12/19/2017 Approved TONY HARTONO
Deputy Drilled-In Anchors 12/20/2017 Approved TONY HARTONO
Deputy Reinf. Concrete 12/20/2017 Approved TONY HARTONO
Deputy Steel/Welding 12/20/2017 Approved TONY HARTONO
Footing/Foundation/Slab 12/20/2017 Partial Approval TONY HARTONO
METHANE-Barrier 12/20/2017 Not Ready for Inspection TONY HARTONO
METHANE-Subgrade 12/20/2017 Not Ready for Inspection TONY HARTONO
Deputy Reinf. Concrete 12/21/2017 Approved TONY HARTONO
Deputy Steel/Welding 12/21/2017 Approved TONY HARTONO
Footing/Foundation/Slab 12/21/2017 Partial Approval TONY HARTONO
METHANE-Barrier 12/21/2017 Not Ready for Inspection TONY HARTONO
METHANE-Subgrade 12/21/2017 Not Ready for Inspection TONY HARTONO
Piling/Pier/Caisson 12/21/2017 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 12/22/2017 Approved TONY HARTONO
Deputy Steel/Welding 12/22/2017 Approved TONY HARTONO
Deputy Steel/Welding 12/27/2017 Approved TONY HARTONO
Deputy Drilled-In Anchors 12/28/2017 Approved TONY HARTONO
Deputy Steel/Welding 12/28/2017 Approved TONY HARTONO
Deputy Drilled-In Anchors 12/29/2017 Approved TONY HARTONO
Deputy Steel/Welding 12/29/2017 Approved TONY HARTONO
Deputy Drilled-In Anchors 1/2/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 1/2/2018 Approved TONY HARTONO
Deputy Steel/Welding 1/2/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 1/3/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 1/3/2018 Approved TONY HARTONO
Deputy Steel/Welding 1/3/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 1/4/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 1/4/2018 Approved TONY HARTONO
Deputy Steel/Welding 1/4/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 1/5/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 1/5/2018 Approved TONY HARTONO
Deputy Steel/Welding 1/5/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 1/8/2018 Approved TONY HARTONO
Deputy Steel/Welding 1/8/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 1/9/2018 Approved TONY HARTONO
Deputy Shotcrete 1/9/2018 Approved TONY HARTONO
Deputy Steel/Welding 1/9/2018 Approved TONY HARTONO
Green Building Rough 1/9/2018 Not Ready for Inspection TONY HARTONO
METHANE-Rough 1/9/2018 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 1/9/2018 Not Ready for Inspection TONY HARTONO
Deputy Shotcrete 1/10/2018 Approved TONY HARTONO
Deputy Steel/Welding 1/10/2018 Approved TONY HARTONO
Wall Anchors 1/10/2018 Not Ready for Inspection TONY HARTONO
Deputy Shotcrete 1/11/2018 Approved TONY HARTONO
Deputy Steel/Welding 1/11/2018 Approved TONY HARTONO
Excavation/Setback/Form/Re-Bar 1/11/2018 Partial Approval TONY HARTONO
Deputy Shotcrete 1/12/2018 Approved TONY HARTONO
Deputy Steel/Welding 1/12/2018 Approved TONY HARTONO
Wall Anchors 1/12/2018 Partial Approval TONY HARTONO
Structural Steel Frame 1/16/2018 Conditional Approval TONY HARTONO
Deputy Fireproofing 1/17/2018 Approved TONY HARTONO
Deputy Steel/Welding 1/17/2018 Approved TONY HARTONO
Structural Steel Frame 1/17/2018 Not Ready for Inspection TONY HARTONO
Deputy Fireproofing 1/18/2018 Approved TONY HARTONO
Deputy Steel/Welding 1/18/2018 Approved TONY HARTONO
Structural Steel Frame 1/18/2018 Partial Approval TONY HARTONO
Deputy Fireproofing 1/19/2018 Approved TONY HARTONO
Deputy Steel/Welding 1/19/2018 Approved TONY HARTONO
Deputy Fireproofing 1/22/2018 Approved TONY HARTONO
Deputy Steel/Welding 1/22/2018 Approved TONY HARTONO
Deputy Steel/Welding 1/22/2018 Conditional Approval TONY HARTONO
Deputy Drilled-In Anchors 1/23/2018 Approved TONY HARTONO
Deputy Fireproofing 1/23/2018 Approved TONY HARTONO
Deputy Steel/Welding 1/23/2018 Approved TONY HARTONO
Special/Order Compliance 1/23/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 1/23/2018 Partial Approval TONY HARTONO
Deputy Drilled-In Anchors 1/24/2018 Approved TONY HARTONO
Deputy Fireproofing 1/24/2018 Approved TONY HARTONO
Deputy Steel/Welding 1/24/2018 Approved TONY HARTONO
Green Building Rough 1/24/2018 Approved TONY HARTONO
METHANE-Rough 1/24/2018 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 1/24/2018 Partial Approval TONY HARTONO
Deputy Drilled-In Anchors 1/25/2018 Approved TONY HARTONO
Deputy Fireproofing 1/25/2018 Approved TONY HARTONO
Deputy Steel/Welding 1/25/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 1/26/2018 Approved TONY HARTONO
Deputy Fireproofing 1/26/2018 Approved TONY HARTONO
Deputy Steel/Welding 1/26/2018 Approved TONY HARTONO
Structural Steel Frame 1/26/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 1/29/2018 Approved TONY HARTONO
Deputy Fireproofing 1/29/2018 Approved TONY HARTONO
Deputy Steel/Welding 1/29/2018 Approved TONY HARTONO
Special/Order Compliance 1/29/2018 Not Ready for Inspection TONY HARTONO
Deputy Fireproofing 1/30/2018 Approved TONY HARTONO
Deputy Steel/Welding 1/30/2018 Approved TONY HARTONO
Special/Order Compliance 1/30/2018 Not Ready for Inspection TONY HARTONO
Deputy Fireproofing 1/31/2018 Approved TONY HARTONO
Deputy Steel/Welding 1/31/2018 Approved TONY HARTONO
Special/Order Compliance 1/31/2018 Not Ready for Inspection TONY HARTONO
Deputy Fireproofing 2/1/2018 Approved DERRICK SPENCER
Deputy Reinf. Concrete 2/1/2018 Approved DERRICK SPENCER
Deputy Steel/Welding 2/1/2018 Approved DERRICK SPENCER
METHANE-Rough 2/1/2018 Not Ready for Inspection DERRICK SPENCER
Reinforced Concrete Frame 2/1/2018 Partial Approval DERRICK SPENCER
Deputy Fireproofing 2/2/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 2/2/2018 Approved TONY HARTONO
Deputy Steel/Welding 2/2/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 2/5/2018 Approved TONY HARTONO
Footing/Foundation/Slab 2/5/2018 Partial Approval TONY HARTONO
METHANE-Barrier 2/5/2018 Approved TONY HARTONO
METHANE-Subgrade 2/5/2018 Not Ready for Inspection TONY HARTONO
Deputy Reinf. Concrete 2/6/2018 Approved TONY HARTONO
Deputy Steel/Welding 2/6/2018 Approved TONY HARTONO
Structural Steel Frame 2/6/2018 Conditional Approval TONY HARTONO
Deputy Reinf. Concrete 2/7/2018 Approved TONY HARTONO
Deputy Steel/Welding 2/7/2018 Approved TONY HARTONO
METHANE-Rough 2/7/2018 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 2/7/2018 Partial Approval TONY HARTONO
Deputy Reinf. Concrete 2/8/2018 Approved TONY HARTONO
Deputy Steel/Welding 2/8/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 2/9/2018 Approved TONY HARTONO
Deputy Steel/Welding 2/9/2018 Approved TONY HARTONO
Special/Order Compliance 2/9/2018 Partial Approval TONY HARTONO
Deputy Reinf. Concrete 2/12/2018 Approved SORIN CIRSTOIU
METHANE-Rough 2/12/2018 Partial Inspection SORIN CIRSTOIU
Reinforced Concrete Frame 2/12/2018 Partial Approval SORIN CIRSTOIU
Special/Order Compliance 2/12/2018 Partial Inspection SORIN CIRSTOIU
Deputy Reinf. Concrete 2/13/2018 Approved TONY HARTONO
Special/Order Compliance 2/13/2018 Not Ready for Inspection TONY HARTONO
Deputy Reinf. Concrete 2/14/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 2/15/2018 Approved TONY HARTONO
Deputy Steel/Welding 2/15/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 2/16/2018 Approved TONY HARTONO
Deputy Steel/Welding 2/16/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 2/20/2018 Approved TONY HARTONO
Deputy Steel/Welding 2/20/2018 Approved TONY HARTONO
Footing/Foundation/Slab 2/20/2018 Partial Inspection TONY HARTONO
METHANE-Rough 2/20/2018 Approved TONY HARTONO
METHANE-Subgrade 2/20/2018 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 2/20/2018 Partial Inspection TONY HARTONO
Deputy Reinf. Concrete 2/21/2018 Approved TONY HARTONO
Deputy Steel/Welding 2/21/2018 Approved TONY HARTONO
Excavation/Setback/Form/Re-Bar 2/21/2018 Partial Approval TONY HARTONO
Deputy Reinf. Concrete 2/22/2018 Partial Approval PAUL DAVIDSON
Deputy Steel/Welding 2/22/2018 Approved TONY HARTONO
Deputy Steel/Welding 2/22/2018 Partial Approval PAUL DAVIDSON
Drywall Nailing 2/22/2018 Partial Inspection TONY HARTONO
Deputy Reinf. Concrete 2/23/2018 Approved TONY HARTONO
Deputy Steel/Welding 2/23/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 2/26/2018 Approved TONY HARTONO
Deputy Fireproofing 2/27/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 2/27/2018 Approved TONY HARTONO
Deputy Steel/Welding 2/27/2018 Approved TONY HARTONO
Drywall Nailing 2/27/2018 Partial Approval TONY HARTONO
Deputy Fireproofing 2/28/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 2/28/2018 Approved TONY HARTONO
Deputy Steel/Welding 2/28/2018 Approved TONY HARTONO
Deputy Fireproofing 3/1/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 3/1/2018 Approved TONY HARTONO
Deputy Steel/Welding 3/1/2018 Approved TONY HARTONO
Deputy Fireproofing 3/2/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 3/2/2018 Approved TONY HARTONO
Deputy Steel/Welding 3/2/2018 Approved TONY HARTONO
Deputy Fireproofing 3/5/2018 Approved TONY HARTONO
Footing/Foundation/Slab 3/6/2018 Not Ready for Inspection TONY HARTONO
METHANE-Subgrade 3/6/2018 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 3/6/2018 Not Ready for Inspection TONY HARTONO
Deputy Steel/Welding 3/7/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 3/8/2018 Approved TONY HARTONO
Deputy Steel/Welding 3/8/2018 Approved TONY HARTONO
Special/Order Compliance 3/8/2018 Partial Inspection TONY HARTONO
Deputy Steel/Welding 3/9/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 3/12/2018 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 3/12/2018 Approved TONY HARTONO
Deputy Steel/Welding 3/12/2018 Approved TONY HARTONO
Footing/Foundation/Slab 3/12/2018 Partial Approval TONY HARTONO
METHANE-Subgrade 3/12/2018 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 3/12/2018 Not Ready for Inspection TONY HARTONO
Deputy Fireproofing 3/13/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 3/13/2018 Approved TONY HARTONO
Deputy Steel/Welding 3/13/2018 Approved TONY HARTONO
Special/Order Compliance 3/13/2018 Not Ready for Inspection TONY HARTONO
Deputy Fireproofing 3/14/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 3/14/2018 Approved TONY HARTONO
Deputy Steel/Welding 3/14/2018 Approved TONY HARTONO
Drywall Nailing 3/14/2018 Partial Approval TONY HARTONO
Insulation 3/14/2018 Partial Approval TONY HARTONO
Reinforced Concrete Frame 3/14/2018 Not Ready for Inspection TONY HARTONO
Deputy Fireproofing 3/15/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 3/15/2018 Approved TONY HARTONO
Deputy Steel/Welding 3/15/2018 Approved TONY HARTONO
Drywall Nailing 3/15/2018 Not Ready for Inspection TONY HARTONO
Deputy Fireproofing 3/16/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 3/16/2018 Approved TONY HARTONO
Deputy Steel/Welding 3/16/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 3/19/2018 Approved TONY HARTONO
Deputy Fireproofing 3/19/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 3/19/2018 Approved TONY HARTONO
Deputy Steel/Welding 3/19/2018 Approved TONY HARTONO
Drywall Nailing 3/19/2018 Partial Approval TONY HARTONO
Reinforced Concrete Frame 3/19/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 3/20/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 3/20/2018 Approved TONY HARTONO
Deputy Seismic Resistance 3/20/2018 Approved TONY HARTONO
Deputy Steel/Welding 3/20/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 3/21/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 3/21/2018 Approved TONY HARTONO
Deputy Seismic Resistance 3/21/2018 Approved TONY HARTONO
Deputy Steel/Welding 3/21/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 3/22/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 3/22/2018 Approved TONY HARTONO
Deputy Seismic Resistance 3/22/2018 Approved TONY HARTONO
Deputy Steel/Welding 3/22/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 3/23/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 3/23/2018 Approved TONY HARTONO
Deputy Seismic Resistance 3/23/2018 Approved TONY HARTONO
Deputy Steel/Welding 3/23/2018 Approved TONY HARTONO
Footing/Foundation/Slab 3/23/2018 Partial Approval TONY HARTONO
METHANE-Subgrade 3/23/2018 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 3/23/2018 Partial Approval TONY HARTONO
Deputy Reinf. Concrete 3/27/2018 Approved TONY HARTONO
Deputy Steel/Welding 3/27/2018 Approved TONY HARTONO
Reinforced Concrete Frame 3/27/2018 Not Ready for Inspection TONY HARTONO
Deputy Reinf. Concrete 3/28/2018 Approved TONY HARTONO
Deputy Steel/Welding 3/28/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 3/29/2018 Approved TONY HARTONO
Deputy Fireproofing 3/29/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 3/29/2018 Approved TONY HARTONO
Deputy Steel/Welding 3/29/2018 Approved SORIN CIRSTOIU
Deputy Steel/Welding 3/29/2018 Approved TONY HARTONO
Reinforced Concrete Frame 3/29/2018 Corrections Issued TONY HARTONO
Deputy Drilled-In Anchors 3/30/2018 Approved TONY HARTONO
Deputy Fireproofing 3/30/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 3/30/2018 Approved TONY HARTONO
Deputy Steel/Welding 3/30/2018 Approved TONY HARTONO
Special/Order Compliance 3/30/2018 Partial Approval TONY HARTONO
Deputy Drilled-In Anchors 4/2/2018 Approved DERRICK SPENCER
Deputy Fireproofing 4/2/2018 Approved DERRICK SPENCER
Deputy Reinf. Concrete 4/2/2018 Approved DERRICK SPENCER
Deputy Steel/Welding 4/2/2018 Approved DERRICK SPENCER
Special/Order Compliance 4/2/2018 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 4/3/2018 Approved TONY HARTONO
Deputy Fireproofing 4/3/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 4/3/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 4/3/2018 Approved TONY HARTONO
Deputy Shotcrete 4/3/2018 Approved JASON BORUTA
Deputy Steel/Welding 4/3/2018 Approved TONY HARTONO
Footing/Foundation/Slab 4/3/2018 Not Ready for Inspection TONY HARTONO
METHANE-Subgrade 4/3/2018 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 4/3/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 4/4/2018 Approved TONY HARTONO
Deputy Fireproofing 4/4/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 4/4/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 4/4/2018 Approved TONY HARTONO
Deputy Shotcrete 4/4/2018 Approved TONY HARTONO
Deputy Steel/Welding 4/4/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 4/5/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 4/5/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 4/5/2018 Approved TONY HARTONO
Deputy Shotcrete 4/5/2018 Approved TONY HARTONO
Deputy Steel/Welding 4/5/2018 Approved TONY HARTONO
Excavation/Setback/Form/Re-Bar 4/5/2018 Partial Approval TONY HARTONO
Reinforced Concrete Frame 4/5/2018 Partial Approval TONY HARTONO
Reinforced Masonry Frame 4/5/2018 Partial Approval TONY HARTONO
Deputy Drilled-In Anchors 4/6/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 4/6/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 4/6/2018 Approved TONY HARTONO
Deputy Shotcrete 4/6/2018 Approved TONY HARTONO
Deputy Steel/Welding 4/6/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 4/9/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 4/9/2018 Approved TONY HARTONO
Deputy Shotcrete 4/9/2018 Approved TONY HARTONO
Deputy Steel/Welding 4/9/2018 Approved TONY HARTONO
Drywall Nailing 4/9/2018 Partial Inspection TONY HARTONO
Insulation 4/9/2018 Not Ready for Inspection TONY HARTONO
Pre-Inspection 4/9/2018 Partial Inspection TONY HARTONO
Special/Order Compliance 4/9/2018 Not Ready for Inspection TONY HARTONO
Deputy Reinf. Concrete 4/10/2018 Approved TONY HARTONO
Deputy Steel/Welding 4/10/2018 Approved TONY HARTONO
Footing/Foundation/Slab 4/10/2018 Partial Approval TONY HARTONO
METHANE-Subgrade 4/10/2018 Not Ready for Inspection TONY HARTONO
Special/Order Compliance 4/10/2018 Partial Approval TONY HARTONO
Deputy Reinf. Concrete 4/11/2018 Approved TONY HARTONO
Deputy Steel/Welding 4/11/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 4/12/2018 Approved TONY HARTONO
Deputy Steel/Welding 4/12/2018 Approved TONY HARTONO
Drywall Nailing 4/12/2018 Corrections Issued TONY HARTONO
Light Gage Steel Frame 4/12/2018 Partial Approval TONY HARTONO
Deputy Reinf. Concrete 4/13/2018 Approved TONY HARTONO
Deputy Steel/Welding 4/13/2018 Approved TONY HARTONO
Drywall Nailing 4/13/2018 Not Ready for Inspection TONY HARTONO
Insulation 4/13/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 4/16/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 4/16/2018 Approved TONY HARTONO
Drywall Nailing 4/16/2018 Not Ready for Inspection TONY HARTONO
Special/Order Compliance 4/16/2018 Partial Approval TONY HARTONO
Deputy Steel/Welding 4/17/2018 Approved TONY HARTONO
Drywall Nailing 4/17/2018 Not Ready for Inspection TONY HARTONO
Footing/Foundation/Slab 4/17/2018 Not Ready for Inspection TONY HARTONO
METHANE-Subgrade 4/17/2018 Not Ready for Inspection TONY HARTONO
Masonry Wall/Backfill 4/17/2018 Partial Approval TONY HARTONO
Reinforced Concrete Frame 4/17/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 4/18/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 4/18/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 4/18/2018 Approved TONY HARTONO
Deputy Steel/Welding 4/18/2018 Approved TONY HARTONO
Reinforced Masonry Frame 4/18/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 4/19/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 4/19/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 4/19/2018 Approved TONY HARTONO
Deputy Steel/Welding 4/19/2018 Approved TONY HARTONO
Pre-Inspection 4/19/2018 Partial Inspection TONY HARTONO
Reinforced Concrete Frame 4/19/2018 Partial Approval TONY HARTONO
Deputy Drilled-In Anchors 4/20/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 4/20/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 4/20/2018 Approved TONY HARTONO
Deputy Steel/Welding 4/20/2018 Approved TONY HARTONO
Pre-Inspection 4/20/2018 Partial Approval TONY HARTONO
Deputy Drilled-In Anchors 4/23/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 4/23/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 4/23/2018 Approved TONY HARTONO
Deputy Steel/Welding 4/23/2018 Approved TONY HARTONO
Drywall Nailing 4/23/2018 Not Ready for Inspection TONY HARTONO
Insulation 4/23/2018 Partial Approval TONY HARTONO
Deputy Drilled-In Anchors 4/24/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 4/24/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 4/24/2018 Approved TONY HARTONO
Deputy Steel/Welding 4/24/2018 Approved TONY HARTONO
Excavation/Setback/Form/Re-Bar 4/24/2018 Partial Approval TONY HARTONO
Reinforced Concrete Frame 4/24/2018 Partial Approval TONY HARTONO
Deputy Drilled-In Anchors 4/25/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 4/25/2018 Approved TONY HARTONO
Deputy Steel/Welding 4/25/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 4/26/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 4/26/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 4/26/2018 Approved TONY HARTONO
Deputy Shotcrete 4/26/2018 Approved TONY HARTONO
Deputy Steel/Welding 4/26/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 4/27/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 4/27/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 4/27/2018 Approved TONY HARTONO
Deputy Shotcrete 4/27/2018 Approved TONY HARTONO
Deputy Steel/Welding 4/27/2018 Approved TONY HARTONO
Insulation 4/27/2018 Partial Approval TONY HARTONO
Deputy Drilled-In Anchors 4/30/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 4/30/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 4/30/2018 Approved TONY HARTONO
Deputy Shotcrete 4/30/2018 Approved TONY HARTONO
Deputy Steel/Welding 4/30/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 5/1/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 5/1/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 5/1/2018 Approved TONY HARTONO
Deputy Shotcrete 5/1/2018 Approved TONY HARTONO
Deputy Steel/Welding 5/1/2018 Approved TONY HARTONO
Footing/Foundation/Slab 5/1/2018 Not Ready for Inspection TONY HARTONO
METHANE-Subgrade 5/1/2018 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 5/1/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 5/2/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 5/2/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 5/2/2018 Approved TONY HARTONO
Deputy Shotcrete 5/2/2018 Approved TONY HARTONO
Deputy Steel/Welding 5/2/2018 Approved TONY HARTONO
Excavation/Setback/Form/Re-Bar 5/2/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 5/3/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 5/3/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 5/3/2018 Approved TONY HARTONO
Deputy Steel/Welding 5/3/2018 Approved TONY HARTONO
Excavation/Setback/Form/Re-Bar 5/3/2018 Partial Approval TONY HARTONO
Light Gage Steel Frame 5/3/2018 Partial Approval TONY HARTONO
Deputy Shotcrete 5/4/2018 Approved TONY HARTONO
Deputy Steel/Welding 5/4/2018 Approved TONY HARTONO
Excavation/Setback/Form/Re-Bar 5/4/2018 Partial Approval TONY HARTONO
Deputy Drilled-In Anchors 5/7/2018 Approved TONY HARTONO
Deputy Fireproofing 5/7/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 5/7/2018 Approved TONY HARTONO
Deputy Steel/Welding 5/7/2018 Approved TONY HARTONO
Light Gage Steel Frame 5/7/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 5/8/2018 Approved TONY HARTONO
Deputy Fireproofing 5/8/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 5/8/2018 Approved TONY HARTONO
Deputy Steel/Welding 5/8/2018 Approved TONY HARTONO
Footing/Foundation/Slab 5/8/2018 Not Ready for Inspection TONY HARTONO
Light Gage Steel Frame 5/8/2018 Partial Approval TONY HARTONO
METHANE-Subgrade 5/8/2018 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 5/8/2018 Conditional Approval TONY HARTONO
Deputy Drilled-In Anchors 5/9/2018 Approved TONY HARTONO
Deputy Fireproofing 5/9/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 5/9/2018 Approved TONY HARTONO
Deputy Steel/Welding 5/9/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 5/10/2018 Approved TONY HARTONO
Deputy Fireproofing 5/10/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 5/10/2018 Approved TONY HARTONO
Deputy Steel/Welding 5/10/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 5/11/2018 Approved TONY HARTONO
Deputy Fireproofing 5/11/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 5/11/2018 Approved TONY HARTONO
Deputy Steel/Welding 5/11/2018 Approved TONY HARTONO
Drywall Nailing 5/11/2018 Partial Approval TONY HARTONO
Deputy Steel/Welding 5/15/2018 Approved TONY HARTONO
Footing/Foundation/Slab 5/15/2018 Not Ready for Inspection TONY HARTONO
METHANE-Subgrade 5/15/2018 Partial Inspection TONY HARTONO
Reinforced Concrete Frame 5/15/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 5/16/2018 Approved TONY HARTONO
Deputy Fireproofing 5/16/2018 Approved TONY HARTONO
Deputy Steel/Welding 5/16/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 5/17/2018 Approved TONY HARTONO
Deputy Fireproofing 5/17/2018 Approved TONY HARTONO
Deputy Steel/Welding 5/17/2018 Approved TONY HARTONO
Pre-Inspection 5/17/2018 Partial Approval TONY HARTONO
Deputy Drilled-In Anchors 5/18/2018 Approved TONY HARTONO
Deputy Fireproofing 5/18/2018 Approved TONY HARTONO
Deputy Steel/Welding 5/18/2018 Approved TONY HARTONO
Drywall Nailing 5/18/2018 Partial Approval TONY HARTONO
Footing/Foundation/Slab 5/18/2018 Partial Approval TONY HARTONO
METHANE-Subgrade 5/18/2018 Partial Approval TONY HARTONO
Deputy Drilled-In Anchors 5/21/2018 Approved TONY HARTONO
Deputy Fireproofing 5/21/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 5/21/2018 Approved TONY HARTONO
Deputy Steel/Welding 5/21/2018 Approved TONY HARTONO
Light Gage Steel Frame 5/21/2018 Approved TONY HARTONO
Pre-Inspection 5/21/2018 Partial Approval TONY HARTONO
Deputy Drilled-In Anchors 5/22/2018 Approved TONY HARTONO
Deputy Fireproofing 5/22/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 5/22/2018 Approved TONY HARTONO
Deputy Steel/Welding 5/22/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 5/23/2018 Approved TONY HARTONO
Deputy Steel/Welding 5/23/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 5/24/2018 Approved TONY HARTONO
Deputy Steel/Welding 5/24/2018 Approved TONY HARTONO
Light Gage Steel Frame 5/24/2018 Not Ready for Inspection TONY HARTONO
Deputy Reinf. Concrete 5/25/2018 Approved SORIN CIRSTOIU
Deputy Steel/Welding 5/25/2018 Approved TONY HARTONO
Structural Steel Frame 5/25/2018 Partial Approval TONY HARTONO
Deputy Steel/Welding 5/29/2018 Approved TONY HARTONO
Drywall Nailing 5/29/2018 Partial Approval TONY HARTONO
Light Gage Steel Frame 5/29/2018 Partial Approval TONY HARTONO
Deputy Drilled-In Anchors 5/30/2018 Approved TONY HARTONO
Deputy Fireproofing 5/30/2018 Approved TONY HARTONO
Deputy Steel/Welding 5/30/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 5/31/2018 Approved TONY HARTONO
Deputy Fireproofing 5/31/2018 Approved TONY HARTONO
Deputy Steel/Welding 5/31/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 6/1/2018 Approved TONY HARTONO
Deputy Fireproofing 6/1/2018 Approved TONY HARTONO
Deputy Steel/Welding 6/1/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 6/4/2018 Approved TONY HARTONO
Deputy Fireproofing 6/4/2018 Approved TONY HARTONO
Deputy Steel/Welding 6/4/2018 Approved TONY HARTONO
Drywall Nailing 6/4/2018 Partial Approval TONY HARTONO
Interior/Exterior Lathing 6/4/2018 Partial Approval TONY HARTONO
Light Gage Steel Frame 6/4/2018 Partial Approval TONY HARTONO
Deputy Drilled-In Anchors 6/5/2018 Approved TONY HARTONO
Deputy Fireproofing 6/5/2018 Approved TONY HARTONO
Deputy Steel/Welding 6/5/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 6/7/2018 Approved TONY HARTONO
Deputy Fireproofing 6/7/2018 Approved TONY HARTONO
Deputy Steel/Welding 6/7/2018 Approved TONY HARTONO
Drywall Nailing 6/7/2018 Not Ready for Inspection TONY HARTONO
Light Gage Steel Frame 6/7/2018 Partial Approval TONY HARTONO
Deputy Drilled-In Anchors 6/8/2018 Approved TONY HARTONO
Deputy Fireproofing 6/8/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 6/8/2018 Approved TONY HARTONO
Deputy Steel/Welding 6/8/2018 Approved TONY HARTONO
Pre-Inspection 6/8/2018 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 6/8/2018 Off-Hour Fees Due
Reinforced Masonry Frame 6/8/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 6/11/2018 Approved TONY HARTONO
Deputy Fireproofing 6/11/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 6/11/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 6/11/2018 Approved TONY HARTONO
Deputy Steel/Welding 6/11/2018 Approved TONY HARTONO
Drywall Nailing 6/11/2018 Partial Approval TONY HARTONO
Interior/Exterior Lathing 6/11/2018 Partial Approval TONY HARTONO
Deputy Drilled-In Anchors 6/12/2018 Approved TONY HARTONO
Deputy Fireproofing 6/12/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 6/12/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 6/12/2018 Approved TONY HARTONO
Deputy Steel/Welding 6/12/2018 Approved TONY HARTONO
Light Gage Steel Frame 6/12/2018 Partial Approval TONY HARTONO
Deputy Drilled-In Anchors 6/13/2018 Approved TONY HARTONO
Deputy Fireproofing 6/13/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 6/13/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 6/13/2018 Approved TONY HARTONO
Deputy Steel/Welding 6/13/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 6/14/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 6/14/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 6/14/2018 Approved TONY HARTONO
Deputy Steel/Welding 6/14/2018 Approved TONY HARTONO
Interior/Exterior Lathing 6/14/2018 Not Ready for Inspection TONY HARTONO
Light Gage Steel Frame 6/14/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 6/15/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 6/15/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 6/15/2018 Approved TONY HARTONO
Deputy Steel/Welding 6/15/2018 Approved TONY HARTONO
Interior/Exterior Lathing 6/15/2018 Partial Inspection TONY HARTONO
Light Gage Steel Frame 6/15/2018 Partial Approval TONY HARTONO
Deputy Drilled-In Anchors 6/18/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 6/18/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 6/18/2018 Approved TONY HARTONO
Deputy Steel/Welding 6/18/2018 Approved TONY HARTONO
Drywall Nailing 6/18/2018 Partial Approval TONY HARTONO
Final 6/18/2018 Not Ready for Inspection TONY HARTONO
Footing/Foundation/Slab 6/18/2018 Not Ready for Inspection TONY HARTONO
Green Building Final 6/18/2018 Not Ready for Inspection TONY HARTONO
Light Gage Steel Frame 6/18/2018 Partial Approval TONY HARTONO
METHANE-Subgrade 6/18/2018 Not Ready for Inspection TONY HARTONO
SGSOV-Seismic Gas S/O Valve 6/18/2018 SGSOV Not Ready TONY HARTONO
Smoke Detectors 6/18/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 6/19/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 6/19/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 6/19/2018 Approved TONY HARTONO
Deputy Steel/Welding 6/19/2018 Approved TONY HARTONO
Masonry Wall/Backfill 6/19/2018 Partial Approval TONY HARTONO
Deputy Drilled-In Anchors 6/20/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 6/20/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 6/20/2018 Approved TONY HARTONO
Deputy Steel/Welding 6/20/2018 Approved TONY HARTONO
Light Gage Steel Frame 6/20/2018 Partial Approval TONY HARTONO
Deputy Drilled-In Anchors 6/21/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 6/21/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 6/21/2018 Approved TONY HARTONO
Deputy Steel/Welding 6/21/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 6/22/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 6/22/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 6/22/2018 Approved TONY HARTONO
Deputy Steel/Welding 6/22/2018 Approved TONY HARTONO
Special/Order Compliance 6/22/2018 Not Ready for Inspection TONY HARTONO
Deputy Steel/Welding 6/25/2018 Approved TONY HARTONO
Deputy Steel/Welding 6/26/2018 Approved TONY HARTONO
Drywall Nailing 6/26/2018 Partial Approval TONY HARTONO
Light Gage Steel Frame 6/26/2018 Partial Approval TONY HARTONO
Deputy Drilled-In Anchors 6/27/2018 Approved TONY HARTONO
Deputy Fireproofing 6/27/2018 Approved TONY HARTONO
Deputy Steel/Welding 6/27/2018 Approved TONY HARTONO
Drywall Nailing 6/27/2018 Not Ready for Inspection TONY HARTONO
Light Gage Steel Frame 6/27/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 6/28/2018 Approved TONY HARTONO
Deputy Fireproofing 6/28/2018 Approved TONY HARTONO
Deputy Steel/Welding 6/28/2018 Approved TONY HARTONO
Interior/Exterior Lathing 6/28/2018 Partial Approval TONY HARTONO
Light Gage Steel Frame 6/28/2018 Partial Approval TONY HARTONO
Deputy Drilled-In Anchors 6/29/2018 Approved TONY HARTONO
Deputy Fireproofing 6/29/2018 Approved TONY HARTONO
Deputy Steel/Welding 6/29/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 7/2/2018 Approved TONY HARTONO
Deputy Fireproofing 7/2/2018 Approved TONY HARTONO
Deputy Steel/Welding 7/2/2018 Approved TONY HARTONO
Drywall Nailing 7/2/2018 Partial Approval TONY HARTONO
Light Gage Steel Frame 7/2/2018 Partial Approval TONY HARTONO
Deputy Drilled-In Anchors 7/3/2018 Approved TONY HARTONO
Deputy Fireproofing 7/3/2018 Approved TONY HARTONO
Deputy Steel/Welding 7/3/2018 Approved TONY HARTONO
Drywall Nailing 7/3/2018 Not Ready for Inspection TONY HARTONO
Deputy Steel/Welding 7/5/2018 Approved TONY HARTONO
Deputy Steel/Welding 7/6/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 7/9/2018 Approved TONY HARTONO
Deputy Fireproofing 7/9/2018 Approved TONY HARTONO
Deputy Steel/Welding 7/9/2018 Approved TONY HARTONO
Drywall Nailing 7/9/2018 Partial Approval TONY HARTONO
Light Gage Steel Frame 7/9/2018 Partial Approval TONY HARTONO
Deputy Drilled-In Anchors 7/10/2018 Approved TONY HARTONO
Deputy Fireproofing 7/10/2018 Approved TONY HARTONO
Deputy Steel/Welding 7/10/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 7/11/2018 Approved TONY HARTONO
Deputy Fireproofing 7/11/2018 Approved TONY HARTONO
Deputy Steel/Welding 7/11/2018 Approved TONY HARTONO
Drywall Nailing 7/11/2018 Partial Approval TONY HARTONO
Deputy Drilled-In Anchors 7/12/2018 Approved TONY HARTONO
Deputy Fireproofing 7/12/2018 Approved TONY HARTONO
Deputy Steel/Welding 7/12/2018 Approved TONY HARTONO
Deputy Steel/Welding 7/12/2018 Conditional Approval TONY HARTONO
Deputy Drilled-In Anchors 7/13/2018 Approved TONY HARTONO
Deputy Fireproofing 7/13/2018 Approved TONY HARTONO
Deputy Steel/Welding 7/13/2018 Approved TONY HARTONO
Footing/Foundation/Slab 7/13/2018 Partial Approval TONY HARTONO
METHANE-Subgrade 7/13/2018 Not Ready for Inspection TONY HARTONO
Special/Order Compliance 7/13/2018 Partial Approval TONY HARTONO
Deputy Steel/Welding 7/16/2018 Approved TONY HARTONO
Drywall Nailing 7/16/2018 Partial Approval TONY HARTONO
Light Gage Steel Frame 7/16/2018 Partial Approval TONY HARTONO
Pre-Inspection 7/16/2018 Partial Inspection TONY HARTONO
Deputy Steel/Welding 7/17/2018 Approved TONY HARTONO
Deputy Steel/Welding 7/18/2018 Approved TONY HARTONO
Drywall Nailing 7/18/2018 Partial Inspection SORIN CIRSTOIU
Footing/Foundation/Slab 7/18/2018 Partial Approval TONY HARTONO
Light Gage Steel Frame 7/18/2018 Partial Inspection SORIN CIRSTOIU
METHANE-Subgrade 7/18/2018 Not Ready for Inspection TONY HARTONO
Deputy Steel/Welding 7/19/2018 Approved TONY HARTONO
Drywall Nailing 7/19/2018 Partial Inspection SORIN CIRSTOIU
Light Gage Steel Frame 7/19/2018 Partial Inspection SORIN CIRSTOIU
Pre-Inspection 7/19/2018 Partial Inspection SORIN CIRSTOIU
Deputy Steel/Welding 7/20/2018 Conditional Approval SORIN CIRSTOIU
Drywall Nailing 7/20/2018 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 7/20/2018 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 7/23/2018 Conditional Approval SORIN CIRSTOIU
Insulation 7/23/2018 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 7/23/2018 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 7/24/2018 Conditional Approval SORIN CIRSTOIU
Drywall Nailing 7/24/2018 Partial Inspection SORIN CIRSTOIU
Light Gage Steel Frame 7/24/2018 Partial Inspection SORIN CIRSTOIU
Deputy Steel/Welding 7/25/2018 Conditional Approval SORIN CIRSTOIU
Drywall Nailing 7/25/2018 Not Ready for Inspection SORIN CIRSTOIU
Footing/Foundation/Slab 7/25/2018 Not Ready for Inspection SORIN CIRSTOIU
Light Gage Steel Frame 7/25/2018 Not Ready for Inspection SORIN CIRSTOIU
METHANE-Subgrade 7/25/2018 Partial Inspection SORIN CIRSTOIU
Deputy Steel/Welding 7/26/2018 Conditional Approval SORIN CIRSTOIU
Drywall Nailing 7/26/2018 Partial Inspection SORIN CIRSTOIU
Insulation 7/26/2018 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 7/26/2018 Partial Approval SORIN CIRSTOIU
Pre-Inspection 7/26/2018 Partial Approval SORIN CIRSTOIU
Special/Order Compliance 7/26/2018 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 7/27/2018 Approved TONY HARTONO
Deputy Steel/Welding 7/30/2018 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 7/31/2018 Conditional Approval SORIN CIRSTOIU
Deputy Fireproofing 7/31/2018 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 7/31/2018 Conditional Approval SORIN CIRSTOIU
Drywall Nailing 7/31/2018 Partial Approval SORIN CIRSTOIU
Excavation/Setback/Form/Re-Bar 7/31/2018 Not Ready for Inspection SORIN CIRSTOIU
Interior/Exterior Lathing 7/31/2018 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 7/31/2018 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 8/1/2018 Conditional Approval SORIN CIRSTOIU
Deputy Fireproofing 8/1/2018 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 8/1/2018 Conditional Approval SORIN CIRSTOIU
Drywall Nailing 8/1/2018 Partial Inspection SORIN CIRSTOIU
Insulation 8/1/2018 Partial Inspection SORIN CIRSTOIU
Light Gage Steel Frame 8/1/2018 Partial Inspection SORIN CIRSTOIU
Special/Order Compliance 8/1/2018 Not Ready for Inspection SORIN CIRSTOIU
Deputy Drilled-In Anchors 8/2/2018 Conditional Approval SORIN CIRSTOIU
Deputy Fireproofing 8/2/2018 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 8/2/2018 Approved DERRICK SPENCER
Deputy Steel/Welding 8/2/2018 Conditional Approval SORIN CIRSTOIU
Drywall Nailing 8/2/2018 Partial Inspection SORIN CIRSTOIU
Insulation 8/2/2018 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 8/2/2018 Partial Approval SORIN CIRSTOIU
Special/Order Compliance 8/2/2018 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 8/3/2018 Conditional Approval SORIN CIRSTOIU
Deputy Fireproofing 8/3/2018 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 8/3/2018 Approved DERRICK SPENCER
Deputy Steel/Welding 8/3/2018 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 8/6/2018 Approved DERRICK SPENCER
Deputy Fireproofing 8/6/2018 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 8/6/2018 Approved DERRICK SPENCER
Deputy Steel/Welding 8/6/2018 Conditional Approval SORIN CIRSTOIU
Drywall Nailing 8/6/2018 Partial Inspection SORIN CIRSTOIU
Interior/Exterior Lathing 8/6/2018 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 8/6/2018 Partial Inspection SORIN CIRSTOIU
Reinforced Concrete Frame 8/6/2018 Partial Approval DERRICK SPENCER
Deputy Steel/Welding 8/7/2018 Conditional Approval SORIN CIRSTOIU
Drywall Nailing 8/7/2018 Partial Approval SORIN CIRSTOIU
Excavation/Setback/Form/Re-Bar 8/7/2018 Partial Approval DERRICK SPENCER
Insulation 8/7/2018 Partial Approval SORIN CIRSTOIU
Interior/Exterior Lathing 8/7/2018 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 8/7/2018 Partial Approval SORIN CIRSTOIU
Special/Order Compliance 8/7/2018 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 8/8/2018 Conditional Approval SORIN CIRSTOIU
Deputy Fireproofing 8/8/2018 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 8/8/2018 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 8/9/2018 Conditional Approval SORIN CIRSTOIU
Deputy Fireproofing 8/9/2018 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 8/9/2018 Conditional Approval SORIN CIRSTOIU
Drywall Nailing 8/9/2018 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 8/9/2018 Partial Approval SORIN CIRSTOIU
Reinforced Concrete Frame 8/9/2018 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 8/10/2018 Conditional Approval SORIN CIRSTOIU
Deputy Fireproofing 8/10/2018 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 8/10/2018 Approved DERRICK SPENCER
Deputy Steel/Welding 8/10/2018 Conditional Approval SORIN CIRSTOIU
Insulation 8/10/2018 Not Ready for Inspection SORIN CIRSTOIU
Deputy Drilled-In Anchors 8/13/2018 Conditional Approval SORIN CIRSTOIU
Deputy Fireproofing 8/13/2018 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 8/13/2018 Conditional Approval SORIN CIRSTOIU
Drywall Nailing 8/13/2018 Not Ready for Inspection SORIN CIRSTOIU
Insulation 8/13/2018 Not Ready for Inspection SORIN CIRSTOIU
Light Gage Steel Frame 8/13/2018 Not Ready for Inspection SORIN CIRSTOIU
Deputy Drilled-In Anchors 8/14/2018 Conditional Approval SORIN CIRSTOIU
Deputy Fireproofing 8/14/2018 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 8/14/2018 Conditional Approval SORIN CIRSTOIU
Drywall Nailing 8/14/2018 Partial Approval SORIN CIRSTOIU
Insulation 8/14/2018 Conditional Approval SORIN CIRSTOIU
Light Gage Steel Frame 8/14/2018 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 8/15/2018 Conditional Approval SORIN CIRSTOIU
Excavation/Setback/Form/Re-Bar 8/15/2018 Partial Approval DERRICK SPENCER
Footing/Foundation/Slab 8/15/2018 Partial Approval DERRICK SPENCER
Interior/Exterior Lathing 8/15/2018 Not Ready for Inspection SORIN CIRSTOIU
METHANE-Subgrade 8/15/2018 Partial Approval DERRICK SPENCER
Reinforced Concrete Frame 8/15/2018 Not Ready for Inspection SORIN CIRSTOIU
Deputy Steel/Welding 8/16/2018 Conditional Approval SORIN CIRSTOIU
Drywall Nailing 8/16/2018 Partial Approval SORIN CIRSTOIU
Insulation 8/16/2018 Partial Approval SORIN CIRSTOIU
Interior/Exterior Lathing 8/16/2018 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 8/16/2018 Partial Approval SORIN CIRSTOIU
Special/Order Compliance 8/16/2018 Partial Inspection SORIN CIRSTOIU
Deputy Steel/Welding 8/17/2018 Conditional Approval SORIN CIRSTOIU
Interior/Exterior Lathing 8/17/2018 Not Ready for Inspection SORIN CIRSTOIU
Special/Order Compliance 8/17/2018 Not Ready for Inspection SORIN CIRSTOIU
Deputy Steel/Welding 8/20/2018 Approved DERRICK SPENCER
Drywall Nailing 8/20/2018 Partial Approval SORIN CIRSTOIU
Insulation 8/20/2018 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 8/21/2018 Conditional Approval SORIN CIRSTOIU
Drywall Nailing 8/21/2018 Partial Approval SORIN CIRSTOIU
Excavation/Setback/Form/Re-Bar 8/21/2018 Partial Inspection SORIN CIRSTOIU
Light Gage Steel Frame 8/21/2018 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 8/22/2018 Conditional Approval SORIN CIRSTOIU
Drywall Nailing 8/22/2018 Partial Inspection SORIN CIRSTOIU
Insulation 8/22/2018 Partial Inspection SORIN CIRSTOIU
Deputy Steel/Welding 8/23/2018 Conditional Approval SORIN CIRSTOIU
Insulation 8/23/2018 Not Ready for Inspection SORIN CIRSTOIU
Reinforced Concrete Frame 8/23/2018 Not Ready for Inspection SORIN CIRSTOIU
Deputy Steel/Welding 8/24/2018 Approved DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 8/24/2018 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 8/27/2018 Approved DERRICK SPENCER
Deputy Grading 8/27/2018 Approved DERRICK SPENCER
Deputy Reinf. Concrete 8/27/2018 Approved DERRICK SPENCER
Deputy Shotcrete 8/27/2018 Approved DERRICK SPENCER
Deputy Steel/Welding 8/27/2018 Approved DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 8/27/2018 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 8/28/2018 Conditional Approval SORIN CIRSTOIU
Deputy Grading 8/28/2018 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 8/28/2018 Conditional Approval SORIN CIRSTOIU
Deputy Shotcrete 8/28/2018 Approved DERRICK SPENCER
Deputy Shotcrete 8/28/2018 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 8/28/2018 Conditional Approval SORIN CIRSTOIU
Drywall Nailing 8/28/2018 Not Ready for Inspection SORIN CIRSTOIU
Footing/Foundation/Slab 8/28/2018 Partial Approval DERRICK SPENCER
Light Gage Steel Frame 8/28/2018 Not Ready for Inspection SORIN CIRSTOIU
METHANE-Subgrade 8/28/2018 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 8/29/2018 Conditional Approval SORIN CIRSTOIU
Deputy Grading 8/29/2018 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 8/29/2018 Conditional Approval SORIN CIRSTOIU
Deputy Shotcrete 8/29/2018 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 8/29/2018 Conditional Approval SORIN CIRSTOIU
Drywall Nailing 8/29/2018 Partial Approval SORIN CIRSTOIU
Excavation/Setback/Form/Re-Bar 8/29/2018 Partial Inspection SORIN CIRSTOIU
Light Gage Steel Frame 8/29/2018 Partial Inspection SORIN CIRSTOIU
Reinforced Concrete Frame 8/29/2018 Partial Inspection SORIN CIRSTOIU
Deputy Drilled-In Anchors 8/30/2018 Approved DERRICK SPENCER
Deputy Grading 8/30/2018 Approved DERRICK SPENCER
Deputy Reinf. Concrete 8/30/2018 Approved DERRICK SPENCER
Deputy Shotcrete 8/30/2018 Approved DERRICK SPENCER
Deputy Steel/Welding 8/30/2018 Approved DERRICK SPENCER
Drywall Nailing 8/30/2018 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 8/30/2018 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 8/31/2018 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 8/31/2018 Conditional Approval SORIN CIRSTOIU
Deputy Grading 8/31/2018 Approved DERRICK SPENCER
Deputy Reinf. Concrete 8/31/2018 Conditional Approval SORIN CIRSTOIU
Deputy Shotcrete 8/31/2018 Approved DERRICK SPENCER
Deputy Shotcrete 8/31/2018 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 8/31/2018 Conditional Approval SORIN CIRSTOIU
Footing/Foundation/Slab 8/31/2018 Partial Approval DERRICK SPENCER
METHANE-Subgrade 8/31/2018 Partial Approval DERRICK SPENCER
Deputy Steel/Welding 9/4/2018 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 9/5/2018 Approved DERRICK SPENCER
Drywall Nailing 9/5/2018 Partial Approval SORIN CIRSTOIU
Excavation/Setback/Form/Re-Bar 9/5/2018 Partial Approval DERRICK SPENCER
Insulation 9/5/2018 Partial Approval SORIN CIRSTOIU
Reinforced Concrete Frame 9/5/2018 Partial Approval DERRICK SPENCER
Deputy Steel/Welding 9/6/2018 Approved SORIN CIRSTOIU
Excavation/Setback/Form/Re-Bar 9/6/2018 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 9/7/2018 Approved SORIN CIRSTOIU
Drywall Nailing 9/7/2018 Partial Approval SORIN CIRSTOIU
Insulation 9/7/2018 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 9/10/2018 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 9/11/2018 Conditional Approval SORIN CIRSTOIU
Drywall Nailing 9/11/2018 Partial Approval SORIN CIRSTOIU
Insulation 9/11/2018 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 9/12/2018 Approved SORIN CIRSTOIU
Excavation/Setback/Form/Re-Bar 9/12/2018 Partial Approval DERRICK SPENCER
Insulation 9/12/2018 Partial Inspection SORIN CIRSTOIU
Reinforced Concrete Frame 9/12/2018 Partial Approval DERRICK SPENCER
Deputy Steel/Welding 9/13/2018 Approved SORIN CIRSTOIU
Excavation/Setback/Form/Re-Bar 9/13/2018 Partial Approval DERRICK SPENCER
Special/Order Compliance 9/13/2018 Approved DERRICK SPENCER
Deputy Steel/Welding 9/14/2018 Approved SORIN CIRSTOIU
Drywall Nailing 9/14/2018 Partial Approval SORIN CIRSTOIU
Excavation/Setback/Form/Re-Bar 9/14/2018 Partial Approval DERRICK SPENCER
Insulation 9/14/2018 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 9/17/2018 Approved SORIN CIRSTOIU
Deputy Grading 9/17/2018 Approved DERRICK SPENCER
Deputy Reinf. Concrete 9/17/2018 Approved DERRICK SPENCER
Deputy Shotcrete 9/17/2018 Approved DERRICK SPENCER
Deputy Steel/Welding 9/17/2018 Approved SORIN CIRSTOIU
Excavation/Setback/Form/Re-Bar 9/17/2018 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 9/18/2018 Approved SORIN CIRSTOIU
Deputy Grading 9/18/2018 Approved DERRICK SPENCER
Deputy Reinf. Concrete 9/18/2018 Approved SORIN CIRSTOIU
Deputy Shotcrete 9/18/2018 Approved DERRICK SPENCER
Deputy Steel/Welding 9/18/2018 Approved DERRICK SPENCER
Deputy Steel/Welding 9/18/2018 Approved SORIN CIRSTOIU
Drywall Nailing 9/18/2018 Partial Approval SORIN CIRSTOIU
Insulation 9/18/2018 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 9/19/2018 Approved SORIN CIRSTOIU
Deputy Fireproofing 9/19/2018 Approved SORIN CIRSTOIU
Deputy Grading 9/19/2018 Approved DERRICK SPENCER
Deputy Reinf. Concrete 9/19/2018 Approved SORIN CIRSTOIU
Deputy Shotcrete 9/19/2018 Approved DERRICK SPENCER
Deputy Steel/Welding 9/19/2018 Approved DERRICK SPENCER
Deputy Steel/Welding 9/19/2018 Approved SORIN CIRSTOIU
Footing/Foundation/Slab 9/19/2018 Partial Approval DERRICK SPENCER
Light Gage Steel Frame 9/19/2018 Partial Approval SORIN CIRSTOIU
METHANE-Subgrade 9/19/2018 Partial Approval DERRICK SPENCER
Reinforced Concrete Frame 9/19/2018 Partial Approval DERRICK SPENCER
Special/Order Compliance 9/19/2018 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 9/20/2018 Approved DERRICK SPENCER
Deputy Fireproofing 9/20/2018 Approved DERRICK SPENCER
Deputy Grading 9/20/2018 Approved DERRICK SPENCER
Deputy Reinf. Concrete 9/20/2018 Approved DERRICK SPENCER
Deputy Reinf. Concrete 9/20/2018 Conditional Approval SORIN CIRSTOIU
Deputy Shotcrete 9/20/2018 Approved DERRICK SPENCER
Deputy Steel/Welding 9/20/2018 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 9/21/2018 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 9/21/2018 Conditional Approval SORIN CIRSTOIU
Deputy Fireproofing 9/21/2018 Conditional Approval SORIN CIRSTOIU
Deputy Grading 9/21/2018 Approved DERRICK SPENCER
Deputy Reinf. Concrete 9/21/2018 Approved DERRICK SPENCER
Deputy Reinf. Concrete 9/21/2018 Conditional Approval SORIN CIRSTOIU
Deputy Shotcrete 9/21/2018 Approved DERRICK SPENCER
Deputy Steel/Welding 9/21/2018 Approved DERRICK SPENCER
Drywall Nailing 9/21/2018 Corrections Issued SORIN CIRSTOIU
Excavation/Setback/Form/Re-Bar 9/21/2018 Partial Approval DERRICK SPENCER
Footing/Foundation/Slab 9/21/2018 Partial Approval DERRICK SPENCER
Light Gage Steel Frame 9/21/2018 Partial Approval SORIN CIRSTOIU
METHANE-Subgrade 9/21/2018 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 9/24/2018 Approved SORIN CIRSTOIU
Deputy Fireproofing 9/24/2018 Approved SORIN CIRSTOIU
Deputy Steel/Welding 9/24/2018 Approved SORIN CIRSTOIU
Deputy Drilled-In Anchors 9/25/2018 Approved DERRICK SPENCER
Deputy Fireproofing 9/25/2018 Approved SORIN CIRSTOIU
Deputy Steel/Welding 9/25/2018 Approved DERRICK SPENCER
Drywall Nailing 9/25/2018 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 9/25/2018 Partial Inspection SORIN CIRSTOIU
Deputy Steel/Welding 9/26/2018 Approved SORIN CIRSTOIU
Light Gage Steel Frame 9/26/2018 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 9/27/2018 Approved SORIN CIRSTOIU
Reinforced Concrete Frame 9/27/2018 Partial Approval DERRICK SPENCER
Deputy Steel/Welding 9/28/2018 Approved SORIN CIRSTOIU
Excavation/Setback/Form/Re-Bar 9/28/2018 Partial Approval SORIN CIRSTOIU
Special/Order Compliance 9/28/2018 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 10/1/2018 Approved SORIN CIRSTOIU
Insulation 10/1/2018 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 10/2/2018 Approved SORIN CIRSTOIU
Excavation/Setback/Form/Re-Bar 10/2/2018 Partial Approval DERRICK SPENCER
Pre-Inspection 10/2/2018 Partial Approval SORIN CIRSTOIU
Reinforced Concrete Frame 10/2/2018 Not Ready for Inspection SORIN CIRSTOIU
Deputy Steel/Welding 10/3/2018 Approved DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 10/3/2018 Partial Approval DERRICK SPENCER
Footing/Foundation/Slab 10/3/2018 Partial Approval DERRICK SPENCER
METHANE-Subgrade 10/3/2018 Partial Approval DERRICK SPENCER
Deputy Steel/Welding 10/4/2018 Approved SORIN CIRSTOIU
Drywall Nailing 10/4/2018 Partial Approval SORIN CIRSTOIU
Floor/Roof Diaphrgm/Shear Wall 10/4/2018 Partial Inspection SORIN CIRSTOIU
Light Gage Steel Frame 10/4/2018 Partial Approval SORIN CIRSTOIU
Pre-Inspection 10/4/2018 Approved DERRICK SPENCER
Special/Order Compliance 10/4/2018 Approved DERRICK SPENCER
Deputy Steel/Welding 10/5/2018 Approved SORIN CIRSTOIU
Footing/Foundation/Slab 10/5/2018 Partial Approval DERRICK SPENCER
Insulation 10/5/2018 Partial Inspection SORIN CIRSTOIU
Light Gage Steel Frame 10/5/2018 Conditional Approval SORIN CIRSTOIU
METHANE-Subgrade 10/5/2018 Partial Approval DERRICK SPENCER
Reinforced Masonry Frame 10/5/2018 Partial Approval DERRICK SPENCER
Deputy Steel/Welding 10/9/2018 Approved DERRICK SPENCER
Insulation 10/9/2018 Partial Approval SORIN CIRSTOIU
Reinforced Concrete Frame 10/9/2018 Partial Inspection SORIN CIRSTOIU
Deputy Steel/Welding 10/10/2018 Approved SORIN CIRSTOIU
Excavation/Setback/Form/Re-Bar 10/10/2018 Partial Approval DERRICK SPENCER
Pre-Inspection 10/10/2018 Partial Approval SORIN CIRSTOIU
Special/Order Compliance 10/10/2018 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 10/11/2018 Approved SORIN CIRSTOIU
Drywall Nailing 10/11/2018 Partial Approval SORIN CIRSTOIU
Excavation/Setback/Form/Re-Bar 10/11/2018 Partial Inspection SORIN CIRSTOIU
Footing/Foundation/Slab 10/11/2018 Partial Inspection SORIN CIRSTOIU
Light Gage Steel Frame 10/11/2018 Partial Approval SORIN CIRSTOIU
METHANE-Subgrade 10/11/2018 Partial Inspection SORIN CIRSTOIU
Deputy Reinf. Concrete 10/12/2018 Approved SORIN CIRSTOIU
Deputy Steel/Welding 10/12/2018 Approved SORIN CIRSTOIU
Deputy Steel/Welding 10/15/2018 Approved SORIN CIRSTOIU
Drywall Nailing 10/15/2018 Partial Approval SORIN CIRSTOIU
Insulation 10/15/2018 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 10/15/2018 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 10/16/2018 Conditional Approval SORIN CIRSTOIU
Excavation/Setback/Form/Re-Bar 10/16/2018 Partial Approval DERRICK SPENCER
Deputy Steel/Welding 10/17/2018 Approved SORIN CIRSTOIU
Drywall Nailing 10/17/2018 Partial Inspection SORIN CIRSTOIU
Excavation/Setback/Form/Re-Bar 10/17/2018 Partial Approval DERRICK SPENCER
Insulation 10/17/2018 Partial Inspection SORIN CIRSTOIU
Light Gage Steel Frame 10/17/2018 Partial Inspection SORIN CIRSTOIU
Reinforced Concrete Frame 10/17/2018 Partial Approval DERRICK SPENCER
Deputy Steel/Welding 10/18/2018 Approved SORIN CIRSTOIU
Drywall Nailing 10/18/2018 Partial Inspection SORIN CIRSTOIU
Excavation/Setback/Form/Re-Bar 10/18/2018 Partial Inspection SORIN CIRSTOIU
Insulation 10/18/2018 Partial Inspection SORIN CIRSTOIU
Light Gage Steel Frame 10/18/2018 Partial Inspection SORIN CIRSTOIU
Special/Order Compliance 10/18/2018 Partial Inspection SORIN CIRSTOIU
Deputy Steel/Welding 10/19/2018 Conditional Approval SORIN CIRSTOIU
Excavation/Setback/Form/Re-Bar 10/19/2018 Partial Approval DERRICK SPENCER
Footing/Foundation/Slab 10/19/2018 Partial Approval DERRICK SPENCER
Insulation 10/19/2018 Partial Inspection SORIN CIRSTOIU
Light Gage Steel Frame 10/19/2018 Partial Inspection SORIN CIRSTOIU
METHANE-Subgrade 10/19/2018 Partial Approval DERRICK SPENCER
Deputy Steel/Welding 10/22/2018 Approved SORIN CIRSTOIU
Drywall Nailing 10/22/2018 Partial Approval SORIN CIRSTOIU
Insulation 10/22/2018 Partial Approval SORIN CIRSTOIU
Special/Order Compliance 10/22/2018 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 10/23/2018 Approved DERRICK SPENCER
Footing/Foundation/Slab 10/23/2018 Partial Approval DERRICK SPENCER
METHANE-Subgrade 10/23/2018 Partial Approval DERRICK SPENCER
Deputy Steel/Welding 10/24/2018 Conditional Approval SORIN CIRSTOIU
Drywall Nailing 10/24/2018 Not Ready for Inspection SORIN CIRSTOIU
Deputy Steel/Welding 10/25/2018 Approved SORIN CIRSTOIU
Drywall Nailing 10/25/2018 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 10/25/2018 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 10/26/2018 Approved SORIN CIRSTOIU
Drywall Nailing 10/26/2018 Not Ready for Inspection SORIN CIRSTOIU
Footing/Foundation/Slab 10/26/2018 Partial Approval DERRICK SPENCER
Light Gage Steel Frame 10/26/2018 Not Ready for Inspection SORIN CIRSTOIU
METHANE-Subgrade 10/26/2018 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 10/29/2018 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 10/29/2018 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 10/29/2018 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 10/30/2018 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 10/30/2018 Approved SORIN CIRSTOIU
Deputy Steel/Welding 10/30/2018 Approved SORIN CIRSTOIU
Drywall Nailing 10/30/2018 Partial Approval SORIN CIRSTOIU
Insulation 10/30/2018 Partial Approval SORIN CIRSTOIU
Reinforced Concrete Frame 10/30/2018 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 10/31/2018 Approved DERRICK SPENCER
Deputy Reinf. Concrete 10/31/2018 Approved DERRICK SPENCER
Deputy Steel/Welding 10/31/2018 Approved DERRICK SPENCER
Drywall Nailing 10/31/2018 Partial Inspection SORIN CIRSTOIU
Insulation 10/31/2018 Partial Inspection SORIN CIRSTOIU
Deputy Drilled-In Anchors 11/1/2018 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 11/1/2018 Approved DERRICK SPENCER
Deputy Steel/Welding 11/1/2018 Approved SORIN CIRSTOIU
Drywall Nailing 11/1/2018 Partial Approval SORIN CIRSTOIU
Footing/Foundation/Slab 11/1/2018 Partial Approval DERRICK SPENCER
Insulation 11/1/2018 Partial Approval SORIN CIRSTOIU
METHANE-Subgrade 11/1/2018 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 11/2/2018 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 11/2/2018 Approved SORIN CIRSTOIU
Deputy Steel/Welding 11/2/2018 Approved SORIN CIRSTOIU
Excavation/Setback/Form/Re-Bar 11/2/2018 Partial Approval DERRICK SPENCER
Reinforced Concrete Frame 11/2/2018 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 11/5/2018 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 11/5/2018 Approved SORIN CIRSTOIU
Deputy Reinf. Masonry 11/5/2018 Approved SORIN CIRSTOIU
Deputy Shotcrete 11/5/2018 Approved SORIN CIRSTOIU
Drywall Nailing 11/5/2018 Partial Approval SORIN CIRSTOIU
Insulation 11/5/2018 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 11/6/2018 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 11/6/2018 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Masonry 11/6/2018 Conditional Approval SORIN CIRSTOIU
Deputy Shotcrete 11/6/2018 Conditional Approval SORIN CIRSTOIU
Excavation/Setback/Form/Re-Bar 11/6/2018 Partial Approval DERRICK SPENCER
Piling/Pier/Caisson 11/6/2018 Partial Approval DERRICK SPENCER
Special/Order Compliance 11/6/2018 Partial Inspection SORIN CIRSTOIU
Deputy Drilled-In Anchors 11/7/2018 Approved DERRICK SPENCER
Deputy Fireproofing 11/7/2018 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 11/7/2018 Approved DERRICK SPENCER
Deputy Reinf. Masonry 11/7/2018 Approved DERRICK SPENCER
Deputy Shotcrete 11/7/2018 Approved DERRICK SPENCER
Deputy Steel/Welding 11/7/2018 Approved SORIN CIRSTOIU
Footing/Foundation/Slab 11/7/2018 Partial Approval DERRICK SPENCER
Light Gage Steel Frame 11/7/2018 Partial Inspection SORIN CIRSTOIU
METHANE-Subgrade 11/7/2018 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 11/8/2018 Approved SORIN CIRSTOIU
Deputy Drilled-In Anchors 11/8/2018 Conditional Approval SORIN CIRSTOIU
Deputy Fireproofing 11/8/2018 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 11/8/2018 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Masonry 11/8/2018 Conditional Approval SORIN CIRSTOIU
Deputy Shotcrete 11/8/2018 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 11/8/2018 Approved SORIN CIRSTOIU
Drywall Nailing 11/8/2018 Partial Inspection SORIN CIRSTOIU
Insulation 11/8/2018 Partial Inspection SORIN CIRSTOIU
Light Gage Steel Frame 11/8/2018 Conditional Approval SORIN CIRSTOIU
Piling/Pier/Caisson 11/8/2018 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 11/9/2018 Approved SORIN CIRSTOIU
Deputy Fireproofing 11/9/2018 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 11/9/2018 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Masonry 11/9/2018 Conditional Approval SORIN CIRSTOIU
Deputy Shotcrete 11/9/2018 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 11/9/2018 Approved SORIN CIRSTOIU
Reinforced Concrete Frame 11/9/2018 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 11/13/2018 Approved DERRICK SPENCER
Deputy Fireproofing 11/13/2018 Approved DERRICK SPENCER
Deputy Steel/Welding 11/13/2018 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 11/14/2018 Approved DERRICK SPENCER
Deputy Fireproofing 11/14/2018 Approved DERRICK SPENCER
Deputy Steel/Welding 11/14/2018 Approved DERRICK SPENCER
Reinforced Concrete Frame 11/14/2018 Partial Approval DERRICK SPENCER
Deputy Steel/Welding 11/15/2018 Approved TONY HARTONO
Deputy Steel/Welding 11/16/2018 Approved DERRICK SPENCER
Deputy Steel/Welding 11/19/2018 Approved DERRICK SPENCER
Deputy Steel/Welding 11/20/2018 Approved DERRICK SPENCER
Deputy Steel/Welding 11/21/2018 Approved DERRICK SPENCER
Drywall Nailing 11/21/2018 Partial Approval DERRICK SPENCER
Deputy Steel/Welding 11/27/2018 Approved DERRICK SPENCER
Reinforced Concrete Frame 11/27/2018 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 11/28/2018 Approved DERRICK SPENCER
Deputy Steel/Welding 11/28/2018 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 11/29/2018 Approved DERRICK SPENCER
Deputy Steel/Welding 11/29/2018 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 11/30/2018 Approved DERRICK SPENCER
Deputy Steel/Welding 11/30/2018 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 12/3/2018 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 12/3/2018 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 12/4/2018 Approved SORIN CIRSTOIU
Deputy Drilled-In Anchors 12/4/2018 Conditional Approval SORIN CIRSTOIU
Deputy Fireproofing 12/4/2018 Approved SORIN CIRSTOIU
Deputy Steel/Welding 12/4/2018 Approved SORIN CIRSTOIU
Deputy Steel/Welding 12/4/2018 Conditional Approval SORIN CIRSTOIU
Reinforced Masonry Frame 12/4/2018 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 12/5/2018 Approved SORIN CIRSTOIU
Deputy Drilled-In Anchors 12/5/2018 Conditional Approval SORIN CIRSTOIU
Deputy Fireproofing 12/5/2018 Approved SORIN CIRSTOIU
Deputy Steel/Welding 12/5/2018 Approved SORIN CIRSTOIU
Deputy Steel/Welding 12/5/2018 Conditional Approval SORIN CIRSTOIU
Reinforced Masonry Frame 12/5/2018 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 12/6/2018 Approved SORIN CIRSTOIU
Deputy Drilled-In Anchors 12/6/2018 Conditional Approval SORIN CIRSTOIU
Deputy Fireproofing 12/6/2018 Approved SORIN CIRSTOIU
Deputy Steel/Welding 12/6/2018 Approved SORIN CIRSTOIU
Deputy Steel/Welding 12/6/2018 Conditional Approval SORIN CIRSTOIU
Drywall Nailing 12/6/2018 Not Ready for Inspection SORIN CIRSTOIU
Reinforced Concrete Frame 12/6/2018 Not Ready for Inspection SORIN CIRSTOIU
Deputy Drilled-In Anchors 12/7/2018 Approved SORIN CIRSTOIU
Deputy Fireproofing 12/7/2018 Approved SORIN CIRSTOIU
Deputy Steel/Welding 12/7/2018 Approved SORIN CIRSTOIU
Drywall Nailing 12/7/2018 Partial Approval SORIN CIRSTOIU
Structural Steel Frame 12/7/2018 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 12/10/2018 Approved SORIN CIRSTOIU
Deputy Fireproofing 12/10/2018 Approved SORIN CIRSTOIU
Deputy Steel/Welding 12/10/2018 Approved SORIN CIRSTOIU
Structural Steel Frame 12/10/2018 Partial Inspection SORIN CIRSTOIU
Drywall Nailing 12/11/2018 Not Ready for Inspection SORIN CIRSTOIU
Light Gage Steel Frame 12/11/2018 Not Ready for Inspection SORIN CIRSTOIU
Reinforced Concrete Frame 12/11/2018 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 12/12/2018 Approved SORIN CIRSTOIU
Deputy Steel/Welding 12/12/2018 Approved SORIN CIRSTOIU
Drywall Nailing 12/12/2018 Not Ready for Inspection SORIN CIRSTOIU
Light Gage Steel Frame 12/12/2018 Not Ready for Inspection SORIN CIRSTOIU
Pre-Inspection 12/12/2018 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 12/13/2018 Approved SORIN CIRSTOIU
Deputy Steel/Welding 12/13/2018 Approved SORIN CIRSTOIU
Deputy Drilled-In Anchors 12/14/2018 Approved TONY HARTONO
Deputy Steel/Welding 12/14/2018 Approved TONY HARTONO
Drywall Nailing 12/14/2018 Not Ready for Inspection TONY HARTONO
Light Gage Steel Frame 12/14/2018 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 12/14/2018 Partial Approval TONY HARTONO
Structural Steel Frame 12/14/2018 Not Ready for Inspection TONY HARTONO
Drywall Nailing 12/17/2018 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 12/17/2018 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 12/18/2018 Approved SORIN CIRSTOIU
Drywall Nailing 12/18/2018 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 12/18/2018 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 12/19/2018 Approved SORIN CIRSTOIU
Deputy Steel/Welding 12/20/2018 Approved SORIN CIRSTOIU
Light Gage Steel Frame 12/20/2018 Corrections Issued SORIN CIRSTOIU
Deputy Drilled-In Anchors 12/21/2018 Approved SORIN CIRSTOIU
Deputy Fireproofing 12/21/2018 Approved SORIN CIRSTOIU
Deputy Steel/Welding 12/21/2018 Approved SORIN CIRSTOIU
Insulation 12/21/2018 Partial Inspection SORIN CIRSTOIU
Deputy Drilled-In Anchors 12/24/2018 Conditional Approval SORIN CIRSTOIU
Deputy Fireproofing 12/24/2018 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 12/24/2018 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 12/26/2018 Approved SORIN CIRSTOIU
Deputy Fireproofing 12/26/2018 Approved SORIN CIRSTOIU
Deputy Steel/Welding 12/26/2018 Approved SORIN CIRSTOIU
Deputy Drilled-In Anchors 12/27/2018 Approved SORIN CIRSTOIU
Deputy Fireproofing 12/27/2018 Approved SORIN CIRSTOIU
Deputy Steel/Welding 12/27/2018 Approved SORIN CIRSTOIU
Drywall Nailing 12/27/2018 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 12/27/2018 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 12/28/2018 Approved SORIN CIRSTOIU
Deputy Fireproofing 12/28/2018 Approved SORIN CIRSTOIU
Deputy Steel/Welding 12/28/2018 Approved SORIN CIRSTOIU
Reinforced Concrete Frame 12/28/2018 Corrections Issued SORIN CIRSTOIU
Deputy Steel/Welding 1/2/2019 Approved SORIN CIRSTOIU
Drywall Nailing 1/2/2019 Partial Inspection SORIN CIRSTOIU
Pre-Inspection 1/2/2019 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 1/3/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 1/4/2019 Approved SORIN CIRSTOIU
Pre-Inspection 1/4/2019 Approved SORIN CIRSTOIU
Reinforced Concrete Frame 1/4/2019 Partial Approval SORIN CIRSTOIU
Drywall Nailing 1/7/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 1/7/2019 Partial Inspection SORIN CIRSTOIU
Structural Steel Frame 1/7/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 1/8/2019 Conditional Approval SORIN CIRSTOIU
Pre-Inspection 1/8/2019 Partial Inspection SORIN CIRSTOIU
Interior/Exterior Lathing 1/9/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 1/9/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 1/11/2019 Approved SORIN CIRSTOIU
Deputy Drilled-In Anchors 1/14/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 1/14/2019 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 1/14/2019 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 1/14/2019 Approved SORIN CIRSTOIU
Drywall Nailing 1/14/2019 Partial Approval SORIN CIRSTOIU
Interior/Exterior Lathing 1/14/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 1/15/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 1/15/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 1/15/2019 Approved SORIN CIRSTOIU
Deputy Drilled-In Anchors 1/16/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 1/16/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 1/16/2019 Approved SORIN CIRSTOIU
Drywall Nailing 1/16/2019 Partial Approval SORIN CIRSTOIU
Interior/Exterior Lathing 1/16/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 1/16/2019 Corrections Issued SORIN CIRSTOIU
Deputy Drilled-In Anchors 1/17/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 1/17/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 1/17/2019 Approved DERRICK SPENCER
Deputy Steel/Welding 1/17/2019 Approved SORIN CIRSTOIU
Drywall Nailing 1/17/2019 Partial Approval SORIN CIRSTOIU
Special/Order Compliance 1/17/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 1/18/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 1/18/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 1/18/2019 Approved SORIN CIRSTOIU
Drywall Nailing 1/18/2019 Partial Approval SORIN CIRSTOIU
Insulation 1/18/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 1/18/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 1/18/2019 Partial Inspection SORIN CIRSTOIU
Deputy Steel/Welding 1/22/2019 Approved SORIN CIRSTOIU
Reinforced Concrete Frame 1/22/2019 Not Ready for Inspection SORIN CIRSTOIU
Deputy Steel/Welding 1/23/2019 Approved SORIN CIRSTOIU
Pre-Inspection 1/23/2019 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 1/24/2019 Approved DERRICK SPENCER
Deputy Steel/Welding 1/24/2019 Approved SORIN CIRSTOIU
Drywall Nailing 1/24/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 1/24/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 1/24/2019 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 1/25/2019 Approved SORIN CIRSTOIU
Pre-Inspection 1/25/2019 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 1/28/2019 Approved SORIN CIRSTOIU
Drywall Nailing 1/28/2019 Partial Approval SORIN CIRSTOIU
Insulation 1/28/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 1/28/2019 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 1/29/2019 Approved DERRICK SPENCER
Deputy Steel/Welding 1/30/2019 Approved SORIN CIRSTOIU
Drywall Nailing 1/30/2019 Partial Approval SORIN CIRSTOIU
Insulation 1/30/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 1/30/2019 Partial Approval SORIN CIRSTOIU
Reinforced Concrete Frame 1/30/2019 Partial Inspection SORIN CIRSTOIU
Deputy Drilled-In Anchors 1/31/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 1/31/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 1/31/2019 Approved SORIN CIRSTOIU
Drywall Nailing 1/31/2019 Partial Approval SORIN CIRSTOIU
Insulation 1/31/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 1/31/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 1/31/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 2/1/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 2/1/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 2/1/2019 Approved SORIN CIRSTOIU
Drywall Nailing 2/1/2019 Partial Approval SORIN CIRSTOIU
Insulation 2/1/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 2/1/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 2/4/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 2/4/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 2/4/2019 Approved SORIN CIRSTOIU
Deputy Drilled-In Anchors 2/5/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 2/5/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 2/5/2019 Approved SORIN CIRSTOIU
Drywall Nailing 2/5/2019 Partial Approval SORIN CIRSTOIU
Insulation 2/5/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 2/5/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 2/5/2019 Partial Approval SORIN CIRSTOIU
Reinforced Concrete Frame 2/5/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 2/6/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 2/6/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 2/6/2019 Approved SORIN CIRSTOIU
Drywall Nailing 2/6/2019 Partial Approval SORIN CIRSTOIU
Insulation 2/6/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 2/6/2019 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 2/7/2019 Approved SORIN CIRSTOIU
Insulation 2/7/2019 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 2/8/2019 Approved SORIN CIRSTOIU
Drywall Nailing 2/8/2019 Partial Approval SORIN CIRSTOIU
Insulation 2/8/2019 Partial Approval SORIN CIRSTOIU
Structural Steel Frame 2/8/2019 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 2/11/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 2/12/2019 Approved SORIN CIRSTOIU
Reinforced Concrete Frame 2/12/2019 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 2/13/2019 Approved SORIN CIRSTOIU
Drywall Nailing 2/13/2019 Partial Approval SORIN CIRSTOIU
Insulation 2/13/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 2/13/2019 Partial Approval SORIN CIRSTOIU
Reinforced Concrete Frame 2/13/2019 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 2/14/2019 Approved SORIN CIRSTOIU
Drywall Nailing 2/14/2019 Partial Inspection SORIN CIRSTOIU
Insulation 2/14/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 2/14/2019 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 2/15/2019 Approved SORIN CIRSTOIU
Reinforced Concrete Frame 2/15/2019 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 2/19/2019 Approved SORIN CIRSTOIU
Structural Steel Frame 2/19/2019 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 2/20/2019 Approved SORIN CIRSTOIU
Drywall Nailing 2/20/2019 Partial Approval SORIN CIRSTOIU
Excavation/Setback/Form/Re-Bar 2/20/2019 Partial Approval SORIN CIRSTOIU
Insulation 2/20/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 2/20/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 2/20/2019 Not Ready for Inspection SORIN CIRSTOIU
Reinforced Concrete Frame 2/20/2019 Partial Approval SORIN CIRSTOIU
Special/Order Compliance 2/20/2019 Partial Inspection SORIN CIRSTOIU
Deputy Steel/Welding 2/21/2019 Conditional Approval SORIN CIRSTOIU
Drywall Nailing 2/21/2019 Not Ready for Inspection DERRICK SPENCER
Insulation 2/21/2019 Not Ready for Inspection DERRICK SPENCER
Light Gage Steel Frame 2/21/2019 Not Ready for Inspection DERRICK SPENCER
Pre-Inspection 2/21/2019 Not Ready for Inspection DERRICK SPENCER
Deputy Fireproofing 2/22/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 2/22/2019 Approved SORIN CIRSTOIU
Drywall Nailing 2/22/2019 Partial Approval SORIN CIRSTOIU
Insulation 2/22/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 2/22/2019 Partial Approval SORIN CIRSTOIU
Special/Order Compliance 2/22/2019 Not Ready for Inspection SORIN CIRSTOIU
Deputy Fireproofing 2/25/2019 Approved SORIN CIRSTOIU
Pre-Inspection 2/25/2019 Partial Approval SORIN CIRSTOIU
Deputy Fireproofing 2/26/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 2/26/2019 Approved SORIN CIRSTOIU
Drywall Nailing 2/26/2019 Partial Inspection SORIN CIRSTOIU
Insulation 2/26/2019 Partial Inspection SORIN CIRSTOIU
Light Gage Steel Frame 2/26/2019 Partial Inspection SORIN CIRSTOIU
Deputy Fireproofing 2/27/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 2/27/2019 Approved SORIN CIRSTOIU
Drywall Nailing 2/27/2019 Partial Approval SORIN CIRSTOIU
Insulation 2/27/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 2/27/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 2/27/2019 Partial Approval SORIN CIRSTOIU
Deputy Fireproofing 2/28/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 2/28/2019 Approved SORIN CIRSTOIU
Structural Steel Frame 2/28/2019 Partial Approval SORIN CIRSTOIU
Deputy Fireproofing 3/1/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 3/1/2019 Approved SORIN CIRSTOIU
Pre-Inspection 3/1/2019 Partial Approval SORIN CIRSTOIU
Deputy Fireproofing 3/4/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 3/5/2019 Approved SORIN CIRSTOIU
Drywall Nailing 3/5/2019 Partial Approval SORIN CIRSTOIU
Insulation 3/5/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 3/5/2019 Partial Approval SORIN CIRSTOIU
Structural Steel Frame 3/5/2019 Partial Inspection SORIN CIRSTOIU
Deputy Fireproofing 3/6/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 3/6/2019 Approved SORIN CIRSTOIU
Drywall Nailing 3/6/2019 Partial Approval SORIN CIRSTOIU
Insulation 3/6/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 3/6/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 3/6/2019 Partial Approval SORIN CIRSTOIU
Deputy Fireproofing 3/7/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 3/7/2019 Approved SORIN CIRSTOIU
Drywall Nailing 3/7/2019 Partial Inspection SORIN CIRSTOIU
Insulation 3/7/2019 Partial Inspection SORIN CIRSTOIU
Light Gage Steel Frame 3/7/2019 Corrections Issued SORIN CIRSTOIU
Pre-Inspection 3/7/2019 Partial Inspection SORIN CIRSTOIU
Deputy Drilled-In Anchors 3/8/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 3/8/2019 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 3/8/2019 Approved SORIN CIRSTOIU
Drywall Nailing 3/8/2019 Partial Inspection SORIN CIRSTOIU
Insulation 3/8/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 3/8/2019 Partial Approval SORIN CIRSTOIU
Masonry Wall/Backfill 3/8/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 3/11/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 3/11/2019 Approved SORIN CIRSTOIU
Drywall Nailing 3/11/2019 Partial Approval SORIN CIRSTOIU
Insulation 3/11/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 3/11/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 3/11/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 3/12/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 3/12/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 3/12/2019 Approved SORIN CIRSTOIU
Pre-Inspection 3/12/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 3/13/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 3/13/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 3/13/2019 Approved SORIN CIRSTOIU
Drywall Nailing 3/13/2019 Partial Inspection SORIN CIRSTOIU
Insulation 3/13/2019 Partial Inspection SORIN CIRSTOIU
Light Gage Steel Frame 3/13/2019 Partial Inspection SORIN CIRSTOIU
Pre-Inspection 3/13/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 3/14/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 3/14/2019 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 3/14/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 3/14/2019 Approved SORIN CIRSTOIU
Structural Steel Frame 3/14/2019 Partial Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 3/15/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 3/15/2019 Approved SORIN CIRSTOIU
Drywall Nailing 3/15/2019 Partial Approval SORIN CIRSTOIU
Insulation 3/15/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 3/15/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 3/18/2019 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 3/18/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 3/18/2019 Approved SORIN CIRSTOIU
Deputy Drilled-In Anchors 3/19/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 3/19/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 3/19/2019 Approved SORIN CIRSTOIU
Drywall Nailing 3/19/2019 Partial Inspection SORIN CIRSTOIU
Insulation 3/19/2019 Partial Inspection SORIN CIRSTOIU
Light Gage Steel Frame 3/19/2019 Partial Inspection SORIN CIRSTOIU
Reinforced Concrete Frame 3/19/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 3/20/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 3/20/2019 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 3/20/2019 Approved SORIN CIRSTOIU
Deputy Reinf. Masonry 3/20/2019 Approved SORIN CIRSTOIU
Deputy Shotcrete 3/20/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 3/20/2019 Approved SORIN CIRSTOIU
Drywall Nailing 3/20/2019 Partial Approval SORIN CIRSTOIU
Insulation 3/20/2019 Partial Approval SORIN CIRSTOIU
Interior/Exterior Lathing 3/20/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 3/20/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 3/21/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 3/21/2019 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 3/21/2019 Approved SORIN CIRSTOIU
Deputy Reinf. Masonry 3/21/2019 Approved SORIN CIRSTOIU
Deputy Shotcrete 3/21/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 3/21/2019 Approved SORIN CIRSTOIU
Drywall Nailing 3/21/2019 Partial Inspection SORIN CIRSTOIU
Insulation 3/21/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 3/21/2019 Partial Inspection SORIN CIRSTOIU
Deputy Drilled-In Anchors 3/22/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 3/22/2019 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 3/22/2019 Approved SORIN CIRSTOIU
Deputy Reinf. Masonry 3/22/2019 Approved SORIN CIRSTOIU
Deputy Shotcrete 3/22/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 3/22/2019 Approved SORIN CIRSTOIU
Deputy Drilled-In Anchors 3/26/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 3/26/2019 Approved SORIN CIRSTOIU
Drywall Nailing 3/26/2019 Partial Approval SORIN CIRSTOIU
Insulation 3/26/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 3/26/2019 Partial Approval SORIN CIRSTOIU
Reinforced Concrete Frame 3/26/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 3/27/2019 Approved DERRICK SPENCER
Deputy Fireproofing 3/27/2019 Approved DERRICK SPENCER
Deputy Reinf. Concrete 3/27/2019 Approved DERRICK SPENCER
Deputy Reinf. Masonry 3/27/2019 Approved DERRICK SPENCER
Deputy Shotcrete 3/27/2019 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 3/28/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 3/28/2019 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 3/28/2019 Approved SORIN CIRSTOIU
Deputy Reinf. Masonry 3/28/2019 Approved SORIN CIRSTOIU
Deputy Shotcrete 3/28/2019 Approved SORIN CIRSTOIU
Drywall Nailing 3/28/2019 Partial Inspection SORIN CIRSTOIU
Insulation 3/28/2019 Partial Inspection SORIN CIRSTOIU
Light Gage Steel Frame 3/28/2019 Partial Inspection SORIN CIRSTOIU
Pre-Inspection 3/28/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 3/29/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 3/29/2019 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 3/29/2019 Approved SORIN CIRSTOIU
Deputy Reinf. Masonry 3/29/2019 Approved SORIN CIRSTOIU
Deputy Shotcrete 3/29/2019 Approved SORIN CIRSTOIU
Deputy Drilled-In Anchors 4/1/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 4/1/2019 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 4/1/2019 Approved SORIN CIRSTOIU
Deputy Reinf. Masonry 4/1/2019 Approved SORIN CIRSTOIU
Deputy Shotcrete 4/1/2019 Approved SORIN CIRSTOIU
Drywall Nailing 4/1/2019 Partial Approval SORIN CIRSTOIU
Insulation 4/1/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 4/1/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 4/1/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 4/2/2019 Conditional Approval SORIN CIRSTOIU
Deputy Fireproofing 4/2/2019 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 4/2/2019 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Masonry 4/2/2019 Conditional Approval SORIN CIRSTOIU
Deputy Shotcrete 4/2/2019 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 4/2/2019 Conditional Approval SORIN CIRSTOIU
Pre-Inspection 4/2/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 4/3/2019 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 4/3/2019 Approved SORIN CIRSTOIU
Deputy Reinf. Masonry 4/3/2019 Approved SORIN CIRSTOIU
Deputy Shotcrete 4/3/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 4/3/2019 Approved SORIN CIRSTOIU
Drywall Nailing 4/3/2019 Partial Approval SORIN CIRSTOIU
Insulation 4/3/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 4/3/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 4/3/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 4/4/2019 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 4/4/2019 Approved SORIN CIRSTOIU
Deputy Reinf. Masonry 4/4/2019 Approved SORIN CIRSTOIU
Deputy Shotcrete 4/4/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 4/4/2019 Approved SORIN CIRSTOIU
Drywall Nailing 4/4/2019 Partial Approval SORIN CIRSTOIU
Insulation 4/4/2019 Partial Approval SORIN CIRSTOIU
Interior/Exterior Lathing 4/4/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 4/4/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 4/4/2019 Partial Inspection SORIN CIRSTOIU
Deputy Drilled-In Anchors 4/5/2019 Approved DERRICK SPENCER
Deputy Reinf. Concrete 4/5/2019 Approved DERRICK SPENCER
Deputy Reinf. Masonry 4/5/2019 Approved DERRICK SPENCER
Deputy Shotcrete 4/5/2019 Approved DERRICK SPENCER
Deputy Steel/Welding 4/5/2019 Approved DERRICK SPENCER
Drywall Nailing 4/5/2019 Partial Approval DERRICK SPENCER
Insulation 4/5/2019 Partial Approval DERRICK SPENCER
Light Gage Steel Frame 4/5/2019 Partial Approval DERRICK SPENCER
Pre-Inspection 4/5/2019 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 4/8/2019 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 4/8/2019 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Masonry 4/8/2019 Conditional Approval SORIN CIRSTOIU
Deputy Shotcrete 4/8/2019 Conditional Approval SORIN CIRSTOIU
Deputy Fireproofing 4/9/2019 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 4/9/2019 Approved SORIN CIRSTOIU
Drywall Nailing 4/9/2019 Partial Approval SORIN CIRSTOIU
Insulation 4/9/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 4/9/2019 Partial Approval SORIN CIRSTOIU
Deputy Fireproofing 4/10/2019 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 4/10/2019 Conditional Approval SORIN CIRSTOIU
Pre-Inspection 4/10/2019 Not Ready for Inspection SORIN CIRSTOIU
Structural Steel Frame 4/10/2019 Not Ready for Inspection SORIN CIRSTOIU
Deputy Fireproofing 4/11/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 4/11/2019 Approved SORIN CIRSTOIU
Drywall Nailing 4/11/2019 Partial Approval SORIN CIRSTOIU
Insulation 4/11/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 4/11/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 4/11/2019 Partial Approval SORIN CIRSTOIU
Deputy Fireproofing 4/12/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 4/12/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 4/15/2019 Conditional Approval SORIN CIRSTOIU
Deputy Fireproofing 4/16/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 4/16/2019 Approved SORIN CIRSTOIU
Drywall Nailing 4/16/2019 Partial Approval SORIN CIRSTOIU
Insulation 4/16/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 4/16/2019 Partial Approval SORIN CIRSTOIU
Masonry Wall/Backfill 4/16/2019 Partial Approval SORIN CIRSTOIU
Reinforced Masonry Frame 4/16/2019 Partial Approval SORIN CIRSTOIU
Special/Order Compliance 4/16/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 4/17/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 4/17/2019 Approved SORIN CIRSTOIU
Pre-Inspection 4/17/2019 Partial Approval SORIN CIRSTOIU
Deputy Fireproofing 4/18/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 4/18/2019 Approved SORIN CIRSTOIU
Drywall Nailing 4/18/2019 Partial Approval SORIN CIRSTOIU
Insulation 4/18/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 4/18/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 4/18/2019 Partial Approval SORIN CIRSTOIU
Deputy Fireproofing 4/19/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 4/19/2019 Approved SORIN CIRSTOIU
Drywall Nailing 4/19/2019 Partial Approval SORIN CIRSTOIU
Insulation 4/19/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 4/19/2019 Partial Approval SORIN CIRSTOIU
Deputy Fireproofing 4/22/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 4/22/2019 Approved SORIN CIRSTOIU
Drywall Nailing 4/22/2019 Partial Approval SORIN CIRSTOIU
Interior/Exterior Lathing 4/22/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 4/22/2019 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 4/23/2019 Approved DERRICK SPENCER
Drywall Nailing 4/23/2019 Partial Approval SORIN CIRSTOIU
Insulation 4/23/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 4/23/2019 Partial Approval SORIN CIRSTOIU
Masonry Wall/Backfill 4/23/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 4/23/2019 Partial Approval SORIN CIRSTOIU
Reinforced Masonry Frame 4/23/2019 Partial Approval SORIN CIRSTOIU
Deputy Fireproofing 4/24/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 4/24/2019 Approved SORIN CIRSTOIU
Drywall Nailing 4/24/2019 Partial Approval SORIN CIRSTOIU
Insulation 4/24/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 4/24/2019 Partial Approval SORIN CIRSTOIU
Deputy Fireproofing 4/25/2019 Approved SORIN CIRSTOIU
Drywall Nailing 4/25/2019 Partial Approval SORIN CIRSTOIU
Insulation 4/25/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 4/25/2019 Partial Approval SORIN CIRSTOIU
Reinforced Concrete Frame 4/25/2019 Partial Approval SORIN CIRSTOIU
Deputy Fireproofing 4/26/2019 Approved DERRICK SPENCER
Deputy Reinf. Concrete 4/26/2019 Conditional Approval PAUL DAVIDSON
Deputy Steel/Welding 4/29/2019 Approved SORIN CIRSTOIU
Drywall Nailing 4/29/2019 Partial Approval SORIN CIRSTOIU
Insulation 4/29/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 4/29/2019 Partial Approval SORIN CIRSTOIU
Structural Steel Frame 4/29/2019 Partial Inspection SORIN CIRSTOIU
Deputy Steel/Welding 4/30/2019 Conditional Approval SORIN CIRSTOIU
Masonry Wall/Backfill 4/30/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 4/30/2019 Conditional Approval SORIN CIRSTOIU
Reinforced Masonry Frame 4/30/2019 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 5/1/2019 Approved DERRICK SPENCER
Drywall Nailing 5/1/2019 Partial Approval DERRICK SPENCER
Insulation 5/1/2019 Partial Approval DERRICK SPENCER
Light Gage Steel Frame 5/1/2019 Partial Approval DERRICK SPENCER
Pre-Inspection 5/1/2019 Partial Approval DERRICK SPENCER
Deputy Fireproofing 5/2/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 5/2/2019 Approved SORIN CIRSTOIU
Pre-Inspection 5/2/2019 Partial Inspection SORIN CIRSTOIU
Deputy Fireproofing 5/3/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 5/3/2019 Approved SORIN CIRSTOIU
Drywall Nailing 5/3/2019 Partial Approval SORIN CIRSTOIU
Insulation 5/3/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 5/3/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 5/3/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 5/6/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 5/6/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 5/6/2019 No Access for Inspection SORIN CIRSTOIU
Drywall Nailing 5/6/2019 Partial Approval SORIN CIRSTOIU
Insulation 5/6/2019 Partial Approval SORIN CIRSTOIU
Interior/Exterior Lathing 5/6/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 5/6/2019 Partial Inspection SORIN CIRSTOIU
Reinforced Concrete Frame 5/6/2019 Not Ready for Inspection SORIN CIRSTOIU
Deputy Reinf. Concrete 5/7/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 5/7/2019 No Access for Inspection SORIN CIRSTOIU
Drywall Nailing 5/7/2019 Partial Approval SORIN CIRSTOIU
Insulation 5/7/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 5/7/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 5/8/2019 Approved SORIN CIRSTOIU
Deputy Reinf. Masonry 5/8/2019 Approved SORIN CIRSTOIU
Deputy Shotcrete 5/8/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 5/8/2019 No Access for Inspection SORIN CIRSTOIU
Drywall Nailing 5/8/2019 Partial Approval SORIN CIRSTOIU
Insulation 5/8/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 5/8/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 5/9/2019 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 5/9/2019 No Access for Inspection SORIN CIRSTOIU
Deputy Reinf. Masonry 5/9/2019 No Access for Inspection SORIN CIRSTOIU
Deputy Shotcrete 5/9/2019 No Access for Inspection SORIN CIRSTOIU
Deputy Steel/Welding 5/9/2019 No Access for Inspection SORIN CIRSTOIU
Deputy Steel/Welding 5/10/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 5/10/2019 No Access for Inspection SORIN CIRSTOIU
Drywall Nailing 5/10/2019 Partial Approval SORIN CIRSTOIU
Insulation 5/10/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 5/10/2019 Partial Approval SORIN CIRSTOIU
Reinforced Concrete Frame 5/10/2019 Partial Inspection SORIN CIRSTOIU
Deputy Drilled-In Anchors 5/14/2019 No Access for Inspection SORIN CIRSTOIU
Deputy Reinf. Concrete 5/14/2019 No Access for Inspection SORIN CIRSTOIU
Deputy Steel/Welding 5/14/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 5/14/2019 No Access for Inspection SORIN CIRSTOIU
Drywall Nailing 5/14/2019 Partial Inspection SORIN CIRSTOIU
Insulation 5/14/2019 Partial Inspection SORIN CIRSTOIU
Light Gage Steel Frame 5/14/2019 Partial Inspection SORIN CIRSTOIU
Deputy Drilled-In Anchors 5/15/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 5/15/2019 Approved SORIN CIRSTOIU
Drywall Nailing 5/15/2019 Partial Approval SORIN CIRSTOIU
Insulation 5/15/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 5/15/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 5/16/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 5/16/2019 Approved SORIN CIRSTOIU
Drywall Nailing 5/16/2019 Partial Approval SORIN CIRSTOIU
Insulation 5/16/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 5/16/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 5/17/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 5/17/2019 Approved SORIN CIRSTOIU
Light Gage Steel Frame 5/17/2019 Partial Inspection SORIN CIRSTOIU
Deputy Drilled-In Anchors 5/20/2019 Approved SORIN CIRSTOIU
Deputy Pre-Stress Concrete 5/20/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 5/20/2019 Approved SORIN CIRSTOIU
Drywall Nailing 5/20/2019 Partial Approval SORIN CIRSTOIU
Insulation 5/20/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 5/20/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 5/21/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 5/21/2019 Approved SORIN CIRSTOIU
Reinforced Concrete Frame 5/21/2019 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 5/22/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 5/22/2019 Approved SORIN CIRSTOIU
Drywall Nailing 5/22/2019 Partial Approval SORIN CIRSTOIU
Insulation 5/22/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 5/22/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 5/23/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 5/23/2019 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 5/23/2019 Approved SORIN CIRSTOIU
Deputy Reinf. Masonry 5/23/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 5/23/2019 Approved SORIN CIRSTOIU
Pre-Inspection 5/23/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 5/24/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 5/24/2019 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 5/24/2019 Approved SORIN CIRSTOIU
Deputy Reinf. Masonry 5/24/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 5/24/2019 Approved SORIN CIRSTOIU
Drywall Nailing 5/24/2019 Partial Approval SORIN CIRSTOIU
Insulation 5/24/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 5/24/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 5/28/2019 Conditional Approval SORIN CIRSTOIU
Deputy Fireproofing 5/28/2019 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 5/28/2019 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Masonry 5/28/2019 Conditional Approval SORIN CIRSTOIU
Drywall Nailing 5/28/2019 Not Ready for Inspection SORIN CIRSTOIU
Insulation 5/28/2019 Not Ready for Inspection SORIN CIRSTOIU
Light Gage Steel Frame 5/28/2019 Not Ready for Inspection SORIN CIRSTOIU
Deputy Drilled-In Anchors 5/29/2019 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 5/29/2019 Conditional Approval SORIN CIRSTOIU
Drywall Nailing 5/29/2019 Partial Approval SORIN CIRSTOIU
Insulation 5/29/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 5/29/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 5/30/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 5/30/2019 Approved SORIN CIRSTOIU
Drywall Nailing 5/30/2019 Partial Approval SORIN CIRSTOIU
Insulation 5/30/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 5/30/2019 Partial Approval SORIN CIRSTOIU
Reinforced Concrete Frame 5/30/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 5/31/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 5/31/2019 Approved SORIN CIRSTOIU
Deputy Drilled-In Anchors 6/3/2019 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Concrete 6/3/2019 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Masonry 6/3/2019 Conditional Approval PAUL DAVIDSON
Deputy Drilled-In Anchors 6/4/2019 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 6/4/2019 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Masonry 6/4/2019 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 6/4/2019 Conditional Approval SORIN CIRSTOIU
Drywall Nailing 6/4/2019 Partial Approval SORIN CIRSTOIU
Insulation 6/4/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 6/4/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 6/4/2019 Conditional Approval SORIN CIRSTOIU
Reinforced Concrete Frame 6/4/2019 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 6/5/2019 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 6/5/2019 Approved SORIN CIRSTOIU
Deputy Reinf. Masonry 6/5/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 6/5/2019 Approved SORIN CIRSTOIU
Drywall Nailing 6/5/2019 Partial Approval SORIN CIRSTOIU
Final 6/5/2019 Not Ready for Inspection SORIN CIRSTOIU
Footing/Foundation/Slab 6/5/2019 Partial Approval SORIN CIRSTOIU
Green Building Final 6/5/2019 Partial Inspection SORIN CIRSTOIU
Insulation 6/5/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 6/5/2019 Partial Approval SORIN CIRSTOIU
METHANE-Subgrade 6/5/2019 Partial Inspection SORIN CIRSTOIU
SGSOV-Seismic Gas S/O Valve 6/5/2019 SGSOV Not Ready SORIN CIRSTOIU
Smoke Detectors 6/5/2019 Not Ready for Inspection SORIN CIRSTOIU
Deputy Drilled-In Anchors 6/6/2019 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 6/6/2019 Approved SORIN CIRSTOIU
Deputy Reinf. Masonry 6/6/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 6/6/2019 Approved SORIN CIRSTOIU
Drywall Nailing 6/6/2019 Partial Approval SORIN CIRSTOIU
Insulation 6/6/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 6/6/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 6/7/2019 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 6/7/2019 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Masonry 6/7/2019 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 6/7/2019 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 6/10/2019 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 6/10/2019 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 6/11/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 6/11/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 6/11/2019 Approved SORIN CIRSTOIU
Drywall Nailing 6/11/2019 Partial Approval SORIN CIRSTOIU
Insulation 6/11/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 6/11/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 6/12/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 6/12/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 6/12/2019 Approved SORIN CIRSTOIU
Drywall Nailing 6/12/2019 Partial Approval SORIN CIRSTOIU
Insulation 6/12/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 6/12/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 6/13/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 6/13/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 6/13/2019 Approved SORIN CIRSTOIU
Drywall Nailing 6/13/2019 Partial Approval SORIN CIRSTOIU
Insulation 6/13/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 6/13/2019 Partial Inspection SORIN CIRSTOIU
Deputy Drilled-In Anchors 6/14/2019 Conditional Approval SORIN CIRSTOIU
Deputy Fireproofing 6/14/2019 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 6/14/2019 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 6/17/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 6/17/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 6/17/2019 Approved SORIN CIRSTOIU
Deputy Drilled-In Anchors 6/18/2019 Conditional Approval SORIN CIRSTOIU
Deputy Fireproofing 6/18/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 6/18/2019 Approved SORIN CIRSTOIU
Drywall Nailing 6/18/2019 Partial Approval SORIN CIRSTOIU
Insulation 6/18/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 6/18/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 6/19/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 6/19/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 6/19/2019 Approved SORIN CIRSTOIU
Drywall Nailing 6/19/2019 Partial Approval SORIN CIRSTOIU
Insulation 6/19/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 6/19/2019 Corrections Issued SORIN CIRSTOIU
Deputy Drilled-In Anchors 6/20/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 6/20/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 6/20/2019 Approved SORIN CIRSTOIU
Drywall Nailing 6/20/2019 Partial Approval SORIN CIRSTOIU
Insulation 6/20/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 6/20/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 6/21/2019 Conditional Approval SORIN CIRSTOIU
Deputy Fireproofing 6/21/2019 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 6/21/2019 Conditional Approval SORIN CIRSTOIU
Drywall Nailing 6/21/2019 Conditional Approval SORIN CIRSTOIU
Light Gage Steel Frame 6/21/2019 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 6/24/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 6/24/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 6/24/2019 Approved SORIN CIRSTOIU
Deputy Drilled-In Anchors 6/25/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 6/25/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 6/25/2019 Approved SORIN CIRSTOIU
Drywall Nailing 6/25/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 6/25/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 6/26/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 6/26/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 6/26/2019 Approved SORIN CIRSTOIU
Drywall Nailing 6/26/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 6/26/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 6/26/2019 Approved SORIN CIRSTOIU
Deputy Drilled-In Anchors 6/27/2019 Approved DERRICK SPENCER
Deputy Fireproofing 6/27/2019 Approved DERRICK SPENCER
Deputy Steel/Welding 6/27/2019 Approved DERRICK SPENCER
Drywall Nailing 6/27/2019 Partial Approval DERRICK SPENCER
Light Gage Steel Frame 6/27/2019 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 6/28/2019 Conditional Approval PAUL DAVIDSON
Deputy Fireproofing 6/28/2019 Conditional Approval PAUL DAVIDSON
Deputy Steel/Welding 6/28/2019 Conditional Approval PAUL DAVIDSON
Deputy Drilled-In Anchors 7/1/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 7/1/2019 Approved SORIN CIRSTOIU
Drywall Nailing 7/1/2019 Partial Approval SORIN CIRSTOIU
Insulation 7/1/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 7/1/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 7/2/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 7/2/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 7/2/2019 Approved SORIN CIRSTOIU
Drywall Nailing 7/2/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 7/2/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 7/2/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 7/3/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 7/3/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 7/3/2019 Approved SORIN CIRSTOIU
Drywall Nailing 7/3/2019 Partial Approval SORIN CIRSTOIU
Insulation 7/3/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 7/3/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 7/3/2019 Corrections Issued SORIN CIRSTOIU
Deputy Drilled-In Anchors 7/5/2019 Conditional Approval SORIN CIRSTOIU
Deputy Fireproofing 7/5/2019 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 7/5/2019 Conditional Approval SORIN CIRSTOIU
Drywall Nailing 7/8/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 7/8/2019 Partial Approval SORIN CIRSTOIU
Deputy Fireproofing 7/9/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 7/9/2019 Approved SORIN CIRSTOIU
Drywall Nailing 7/9/2019 Partial Approval SORIN CIRSTOIU
Insulation 7/9/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 7/9/2019 Corrections Issued SORIN CIRSTOIU
Deputy Fireproofing 7/10/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 7/10/2019 Approved SORIN CIRSTOIU
Drywall Nailing 7/10/2019 Partial Inspection SORIN CIRSTOIU
Light Gage Steel Frame 7/10/2019 Partial Inspection SORIN CIRSTOIU
Deputy Fireproofing 7/11/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 7/11/2019 Approved SORIN CIRSTOIU
Drywall Nailing 7/11/2019 Partial Approval SORIN CIRSTOIU
Insulation 7/11/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 7/11/2019 Partial Approval SORIN CIRSTOIU
Deputy Fireproofing 7/12/2019 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 7/12/2019 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 7/15/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 7/15/2019 Approved SORIN CIRSTOIU
Drywall Nailing 7/15/2019 Partial Approval SORIN CIRSTOIU
Insulation 7/15/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 7/15/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 7/16/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 7/16/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 7/16/2019 Approved SORIN CIRSTOIU
Drywall Nailing 7/16/2019 Partial Approval SORIN CIRSTOIU
Insulation 7/16/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 7/16/2019 Corrections Issued SORIN CIRSTOIU
Deputy Drilled-In Anchors 7/17/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 7/17/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 7/17/2019 Approved SORIN CIRSTOIU
Drywall Nailing 7/17/2019 Partial Approval SORIN CIRSTOIU
Insulation 7/17/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 7/17/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 7/18/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 7/18/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 7/18/2019 Approved SORIN CIRSTOIU
Drywall Nailing 7/18/2019 Partial Approval SORIN CIRSTOIU
Insulation 7/18/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 7/18/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 7/19/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 7/19/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 7/19/2019 Approved SORIN CIRSTOIU
Drywall Nailing 7/19/2019 Partial Approval SORIN CIRSTOIU
Insulation 7/19/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 7/19/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 7/22/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 7/22/2019 Approved SORIN CIRSTOIU
Drywall Nailing 7/22/2019 Partial Approval SORIN CIRSTOIU
Insulation 7/22/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 7/22/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 7/23/2019 Approved DERRICK SPENCER
Deputy Fireproofing 7/23/2019 Approved DERRICK SPENCER
Deputy Shotcrete 7/23/2019 Approved DERRICK SPENCER
Deputy Steel/Welding 7/23/2019 Approved DERRICK SPENCER
Drywall Nailing 7/23/2019 Partial Approval DERRICK SPENCER
Insulation 7/23/2019 Partial Approval DERRICK SPENCER
Light Gage Steel Frame 7/23/2019 Partial Approval DERRICK SPENCER
Pre-Inspection 7/23/2019 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 7/24/2019 Approved DERRICK SPENCER
Deputy Fireproofing 7/24/2019 Approved DERRICK SPENCER
Deputy Steel/Welding 7/24/2019 Approved DERRICK SPENCER
Drywall Nailing 7/24/2019 Approved DERRICK SPENCER
Insulation 7/24/2019 Approved DERRICK SPENCER
Light Gage Steel Frame 7/24/2019 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 7/25/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 7/25/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 7/25/2019 Approved SORIN CIRSTOIU
Deputy Drilled-In Anchors 7/26/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 7/26/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 7/26/2019 Approved SORIN CIRSTOIU
Drywall Nailing 7/26/2019 Partial Approval SORIN CIRSTOIU
Insulation 7/26/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 7/26/2019 Partial Approval SORIN CIRSTOIU
Drywall Nailing 7/29/2019 Partial Approval SORIN CIRSTOIU
Insulation 7/29/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 7/29/2019 Partial Approval SORIN CIRSTOIU
Deputy Methane Barrier 7/30/2019 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 7/30/2019 Conditional Approval SORIN CIRSTOIU
Drywall Nailing 7/30/2019 Not Ready for Inspection SORIN CIRSTOIU
Light Gage Steel Frame 7/30/2019 Not Ready for Inspection SORIN CIRSTOIU
Deputy Methane Barrier 7/31/2019 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 7/31/2019 Approved SORIN CIRSTOIU
Drywall Nailing 7/31/2019 Partial Approval SORIN CIRSTOIU
Insulation 7/31/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 7/31/2019 Partial Approval SORIN CIRSTOIU
Deputy Methane Barrier 8/1/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 8/1/2019 Approved SORIN CIRSTOIU
Drywall Nailing 8/1/2019 Partial Approval SORIN CIRSTOIU
Insulation 8/1/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 8/1/2019 Partial Approval SORIN CIRSTOIU
Reinforced Concrete Frame 8/1/2019 Partial Approval SORIN CIRSTOIU
Deputy Methane Barrier 8/2/2019 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 8/2/2019 Approved SORIN CIRSTOIU
Drywall Nailing 8/12/2019 Partial Approval SORIN CIRSTOIU
Insulation 8/12/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 8/12/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 8/13/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 8/13/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 8/13/2019 Approved SORIN CIRSTOIU
Drywall Nailing 8/13/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 8/13/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 8/14/2019 Conditional Approval SORIN CIRSTOIU
Deputy Fireproofing 8/14/2019 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 8/14/2019 Conditional Approval SORIN CIRSTOIU
Drywall Nailing 8/14/2019 Partial Inspection SORIN CIRSTOIU
Insulation 8/14/2019 Partial Inspection SORIN CIRSTOIU
Light Gage Steel Frame 8/14/2019 Partial Inspection SORIN CIRSTOIU
Pre-Inspection 8/14/2019 Partial Inspection SORIN CIRSTOIU
Deputy Drilled-In Anchors 8/15/2019 Conditional Approval PAUL DAVIDSON
Deputy Fireproofing 8/15/2019 Conditional Approval PAUL DAVIDSON
Deputy Steel/Welding 8/15/2019 Conditional Approval PAUL DAVIDSON
Deputy Drilled-In Anchors 8/16/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 8/16/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 8/16/2019 Approved SORIN CIRSTOIU
Drywall Nailing 8/16/2019 Partial Approval SORIN CIRSTOIU
Insulation 8/16/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 8/16/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 8/19/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 8/19/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 8/19/2019 Approved SORIN CIRSTOIU
Drywall Nailing 8/19/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 8/19/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 8/20/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 8/20/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 8/20/2019 Approved SORIN CIRSTOIU
Drywall Nailing 8/20/2019 Partial Approval SORIN CIRSTOIU
Insulation 8/20/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 8/20/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 8/20/2019 Partial Inspection SORIN CIRSTOIU
Deputy Drilled-In Anchors 8/21/2019 Conditional Approval PAUL DAVIDSON
Deputy Fireproofing 8/21/2019 Conditional Approval PAUL DAVIDSON
Deputy Steel/Welding 8/21/2019 Conditional Approval PAUL DAVIDSON
Drywall Nailing 8/21/2019 Partial Approval DERRICK SPENCER
Insulation 8/21/2019 Partial Approval DERRICK SPENCER
Light Gage Steel Frame 8/21/2019 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 8/22/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 8/22/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 8/22/2019 Approved SORIN CIRSTOIU
Drywall Nailing 8/22/2019 Partial Approval SORIN CIRSTOIU
Insulation 8/22/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 8/22/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 8/23/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 8/23/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 8/23/2019 Approved SORIN CIRSTOIU
Drywall Nailing 8/23/2019 Partial Approval SORIN CIRSTOIU
Insulation 8/23/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 8/23/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 8/26/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 8/26/2019 Approved SORIN CIRSTOIU
Drywall Nailing 8/26/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 8/26/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 8/27/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 8/27/2019 Approved SORIN CIRSTOIU
Drywall Nailing 8/27/2019 Partial Approval SORIN CIRSTOIU
Insulation 8/27/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 8/27/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 8/27/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 8/28/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 8/28/2019 Approved SORIN CIRSTOIU
Drywall Nailing 8/28/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 8/28/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 8/29/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 8/29/2019 Approved SORIN CIRSTOIU
Drywall Nailing 8/29/2019 Partial Approval SORIN CIRSTOIU
Insulation 8/29/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 8/29/2019 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 8/30/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 8/30/2019 Approved SORIN CIRSTOIU
Drywall Nailing 8/30/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 8/30/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 8/30/2019 Partial Approval SORIN CIRSTOIU
Reinforced Concrete Frame 8/30/2019 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 9/3/2019 Approved SORIN CIRSTOIU
Drywall Nailing 9/3/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 9/3/2019 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 9/4/2019 Approved SORIN CIRSTOIU
Drywall Nailing 9/4/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 9/4/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 9/4/2019 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 9/5/2019 Approved SORIN CIRSTOIU
Drywall Nailing 9/5/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 9/5/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 9/5/2019 Partial Inspection SORIN CIRSTOIU
Deputy Steel/Welding 9/6/2019 Approved SORIN CIRSTOIU
Drywall Nailing 9/6/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 9/6/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 9/6/2019 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 9/9/2019 Approved SORIN CIRSTOIU
Pre-Inspection 9/9/2019 Partial Approval SORIN CIRSTOIU
Deputy Fireproofing 9/10/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 9/10/2019 Approved SORIN CIRSTOIU
Drywall Nailing 9/10/2019 Partial Approval SORIN CIRSTOIU
Insulation 9/10/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 9/10/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 9/10/2019 Partial Approval SORIN CIRSTOIU
Deputy Fireproofing 9/11/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 9/11/2019 Approved SORIN CIRSTOIU
Drywall Nailing 9/11/2019 Partial Approval SORIN CIRSTOIU
Insulation 9/11/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 9/11/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 9/11/2019 Partial Approval SORIN CIRSTOIU
Deputy Fireproofing 9/12/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 9/12/2019 Approved SORIN CIRSTOIU
Drywall Nailing 9/12/2019 Partial Approval SORIN CIRSTOIU
Insulation 9/12/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 9/12/2019 Partial Approval SORIN CIRSTOIU
Deputy Fireproofing 9/13/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 9/13/2019 Approved SORIN CIRSTOIU
Drywall Nailing 9/16/2019 Partial Inspection SORIN CIRSTOIU
Light Gage Steel Frame 9/16/2019 Partial Inspection SORIN CIRSTOIU
Drywall Nailing 9/17/2019 Partial Inspection SORIN CIRSTOIU
Light Gage Steel Frame 9/17/2019 Partial Inspection SORIN CIRSTOIU
Pre-Inspection 9/17/2019 Partial Approval SORIN CIRSTOIU
Drywall Nailing 9/18/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 9/18/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 9/18/2019 Partial Approval SORIN CIRSTOIU
Drywall Nailing 9/19/2019 Partial Approval DERRICK SPENCER
Insulation 9/19/2019 Partial Approval DERRICK SPENCER
Light Gage Steel Frame 9/19/2019 Partial Approval DERRICK SPENCER
Pre-Inspection 9/19/2019 Approved DERRICK SPENCER
Drywall Nailing 9/20/2019 Partial Approval SORIN CIRSTOIU
Insulation 9/20/2019 Partial Approval SORIN CIRSTOIU
Interior/Exterior Lathing 9/20/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 9/20/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 9/20/2019 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 9/23/2019 Approved SORIN CIRSTOIU
Drywall Nailing 9/23/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 9/23/2019 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 9/24/2019 Approved DERRICK SPENCER
Drywall Nailing 9/24/2019 Partial Approval DERRICK SPENCER
Light Gage Steel Frame 9/24/2019 Partial Approval DERRICK SPENCER
Pre-Inspection 9/24/2019 Approved DERRICK SPENCER
Deputy Steel/Welding 9/25/2019 Approved SORIN CIRSTOIU
Drywall Nailing 9/25/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 9/25/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 9/25/2019 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 9/26/2019 Approved SORIN CIRSTOIU
Drywall Nailing 9/26/2019 Partial Approval SORIN CIRSTOIU
Insulation 9/26/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 9/26/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 9/26/2019 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 9/27/2019 Approved SORIN CIRSTOIU
Drywall Nailing 9/27/2019 Partial Inspection SORIN CIRSTOIU
Insulation 9/27/2019 Partial Inspection SORIN CIRSTOIU
Light Gage Steel Frame 9/27/2019 Partial Inspection SORIN CIRSTOIU
Deputy Steel/Welding 9/30/2019 Approved SORIN CIRSTOIU
Pre-Inspection 9/30/2019 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 10/1/2019 Approved SORIN CIRSTOIU
Drywall Nailing 10/1/2019 Partial Approval SORIN CIRSTOIU
Insulation 10/1/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 10/1/2019 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 10/2/2019 Approved SORIN CIRSTOIU
Drywall Nailing 10/2/2019 Partial Approval SORIN CIRSTOIU
Insulation 10/2/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 10/2/2019 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 10/3/2019 Approved SORIN CIRSTOIU
Drywall Nailing 10/3/2019 Partial Approval SORIN CIRSTOIU
Insulation 10/3/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 10/3/2019 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 10/4/2019 Approved SORIN CIRSTOIU
Drywall Nailing 10/7/2019 Partial Approval SORIN CIRSTOIU
Insulation 10/7/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 10/7/2019 Partial Approval SORIN CIRSTOIU
Drywall Nailing 10/8/2019 Partial Approval SORIN CIRSTOIU
Insulation 10/8/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 10/8/2019 Partial Approval SORIN CIRSTOIU
Drywall Nailing 10/9/2019 Partial Approval SORIN CIRSTOIU
Insulation 10/9/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 10/9/2019 Partial Approval SORIN CIRSTOIU
Drywall Nailing 10/10/2019 Partial Approval SORIN CIRSTOIU
Insulation 10/10/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 10/10/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 10/10/2019 Partial Approval SORIN CIRSTOIU
Drywall Nailing 10/15/2019 Partial Inspection SORIN CIRSTOIU
Insulation 10/15/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 10/15/2019 Partial Approval SORIN CIRSTOIU
Drywall Nailing 10/16/2019 Partial Approval SORIN CIRSTOIU
Insulation 10/16/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 10/16/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 10/16/2019 Partial Approval SORIN CIRSTOIU
Drywall Nailing 10/17/2019 Partial Approval SORIN CIRSTOIU
Insulation 10/17/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 10/17/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 10/17/2019 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 10/22/2019 Approved SORIN CIRSTOIU
Drywall Nailing 10/22/2019 Partial Approval SORIN CIRSTOIU
Insulation 10/22/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 10/22/2019 Partial Inspection SORIN CIRSTOIU
Pre-Inspection 10/22/2019 Partial Approval SORIN CIRSTOIU
Special/Order Compliance 10/22/2019 Approved TED RIES
Deputy Steel/Welding 10/23/2019 Approved SORIN CIRSTOIU
Drywall Nailing 10/23/2019 Partial Approval SORIN CIRSTOIU
Insulation 10/23/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 10/23/2019 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 10/24/2019 Approved SORIN CIRSTOIU
Drywall Nailing 10/24/2019 Partial Approval SORIN CIRSTOIU
Insulation 10/24/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 10/24/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 10/24/2019 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 10/25/2019 Approved SORIN CIRSTOIU
Drywall Nailing 10/28/2019 Partial Approval SORIN CIRSTOIU
Insulation 10/28/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 10/28/2019 Partial Approval SORIN CIRSTOIU
Drywall Nailing 10/29/2019 Not Ready for Inspection SORIN CIRSTOIU
Insulation 10/29/2019 Not Ready for Inspection SORIN CIRSTOIU
Light Gage Steel Frame 10/29/2019 Not Ready for Inspection SORIN CIRSTOIU
Drywall Nailing 10/30/2019 Partial Approval SORIN CIRSTOIU
Insulation 10/30/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 10/30/2019 Partial Approval SORIN CIRSTOIU
Drywall Nailing 10/31/2019 Partial Approval SORIN CIRSTOIU
Insulation 10/31/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 10/31/2019 Partial Approval SORIN CIRSTOIU
Drywall Nailing 11/1/2019 Partial Approval SORIN CIRSTOIU
Insulation 11/1/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 11/1/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 11/4/2019 Partial Inspection SORIN CIRSTOIU
Drywall Nailing 11/5/2019 Partial Approval SORIN CIRSTOIU
Insulation 11/5/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 11/5/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 11/5/2019 Partial Approval SORIN CIRSTOIU
Drywall Nailing 11/6/2019 Partial Approval SORIN CIRSTOIU
Insulation 11/6/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 11/6/2019 Partial Approval SORIN CIRSTOIU
Drywall Nailing 11/8/2019 Partial Approval SORIN CIRSTOIU
Insulation 11/8/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 11/8/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 11/8/2019 Partial Approval SORIN CIRSTOIU
Drywall Nailing 11/13/2019 Partial Approval SORIN CIRSTOIU
Insulation 11/13/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 11/13/2019 Partial Approval SORIN CIRSTOIU
T-Bar Ceiling 11/13/2019 Partial Inspection SORIN CIRSTOIU
Deputy Steel/Welding 11/15/2019 Approved SORIN CIRSTOIU
Drywall Nailing 11/15/2019 Partial Approval SORIN CIRSTOIU
Insulation 11/15/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 11/15/2019 Partial Approval SORIN CIRSTOIU
Drywall Nailing 11/18/2019 Partial Approval SORIN CIRSTOIU
Insulation 11/18/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 11/18/2019 Partial Inspection SORIN CIRSTOIU
T-Bar Ceiling 11/18/2019 Partial Inspection SORIN CIRSTOIU
Drywall Nailing 11/19/2019 Partial Approval SORIN CIRSTOIU
Insulation 11/19/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 11/19/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 11/19/2019 Partial Approval SORIN CIRSTOIU
Drywall Nailing 11/20/2019 Partial Approval SORIN CIRSTOIU
Insulation 11/20/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 11/20/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 11/20/2019 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 11/22/2019 Approved SORIN CIRSTOIU
Drywall Nailing 11/22/2019 Partial Approval SORIN CIRSTOIU
Insulation 11/22/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 11/22/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 11/22/2019 Partial Approval SORIN CIRSTOIU
Drywall Nailing 11/25/2019 Partial Approval SORIN CIRSTOIU
Insulation 11/25/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 11/25/2019 Partial Approval SORIN CIRSTOIU
Drywall Nailing 11/26/2019 Partial Approval SORIN CIRSTOIU
Insulation 11/26/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 11/26/2019 Partial Approval SORIN CIRSTOIU
Drywall Nailing 12/2/2019 Partial Approval SORIN CIRSTOIU
Insulation 12/2/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 12/2/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 12/2/2019 Partial Approval SORIN CIRSTOIU
Drywall Nailing 12/3/2019 Partial Approval SORIN CIRSTOIU
Insulation 12/3/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 12/3/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 12/3/2019 Partial Approval SORIN CIRSTOIU
Drywall Nailing 12/4/2019 Partial Approval SORIN CIRSTOIU
Insulation 12/4/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 12/4/2019 Partial Approval SORIN CIRSTOIU
Drywall Nailing 12/6/2019 Partial Approval SORIN CIRSTOIU
Insulation 12/6/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 12/6/2019 Partial Approval SORIN CIRSTOIU
Deputy Fireproofing 12/9/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 12/9/2019 Approved SORIN CIRSTOIU
Pre-Inspection 12/9/2019 Not Ready for Inspection SORIN CIRSTOIU
Deputy Fireproofing 12/10/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 12/10/2019 Approved SORIN CIRSTOIU
Drywall Nailing 12/10/2019 Partial Approval SORIN CIRSTOIU
Insulation 12/10/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 12/10/2019 Partial Approval SORIN CIRSTOIU
Special/Order Compliance 12/10/2019 Approved TED RIES
Deputy Fireproofing 12/11/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 12/11/2019 Approved SORIN CIRSTOIU
Deputy Fireproofing 12/12/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 12/12/2019 Approved SORIN CIRSTOIU
Drywall Nailing 12/12/2019 Partial Approval SORIN CIRSTOIU
Insulation 12/12/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 12/12/2019 Partial Approval SORIN CIRSTOIU
Deputy Fireproofing 12/13/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 12/13/2019 Approved SORIN CIRSTOIU
Drywall Nailing 12/13/2019 Partial Approval SORIN CIRSTOIU
Insulation 12/13/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 12/13/2019 Partial Approval SORIN CIRSTOIU
Drywall Nailing 12/18/2019 Partial Approval SORIN CIRSTOIU
Insulation 12/18/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 12/18/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 12/19/2019 Approved DERRICK SPENCER
Drywall Nailing 12/20/2019 Partial Approval DERRICK SPENCER
Insulation 12/20/2019 Partial Approval DERRICK SPENCER
Light Gage Steel Frame 12/20/2019 Partial Approval DERRICK SPENCER
Pre-Inspection 12/20/2019 Approved DERRICK SPENCER
Deputy Steel/Welding 12/23/2019 Approved SORIN CIRSTOIU
Drywall Nailing 12/23/2019 Partial Approval SORIN CIRSTOIU
Insulation 12/23/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 12/23/2019 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 12/24/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 12/26/2019 Approved SORIN CIRSTOIU
Deputy Steel/Welding 12/27/2019 Approved JEFF BYTHEWAY
Drywall Nailing 12/27/2019 Not Ready for Inspection JEFF BYTHEWAY
Insulation 12/27/2019 Not Ready for Inspection JEFF BYTHEWAY
Light Gage Steel Frame 12/27/2019 Not Ready for Inspection JEFF BYTHEWAY
Deputy Reinf. Concrete 12/30/2019 Conditional Approval SORIN CIRSTOIU
Drywall Nailing 12/30/2019 Partial Approval SORIN CIRSTOIU
Insulation 12/30/2019 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 12/30/2019 Partial Approval SORIN CIRSTOIU
Pre-Inspection 12/30/2019 Partial Inspection SORIN CIRSTOIU
Drywall Nailing 1/6/2020 Partial Approval SORIN CIRSTOIU
Insulation 1/6/2020 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 1/6/2020 Partial Approval SORIN CIRSTOIU
Drywall Nailing 1/8/2020 Partial Approval SORIN CIRSTOIU
Insulation 1/8/2020 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 1/8/2020 Partial Approval SORIN CIRSTOIU
Pre-Inspection 1/8/2020 Partial Approval SORIN CIRSTOIU
Pre-Inspection 1/9/2020 Partial Approval DERRICK SPENCER
Drywall Nailing 1/10/2020 Not Ready for Inspection DERRICK SPENCER
Insulation 1/10/2020 Not Ready for Inspection DERRICK SPENCER
Light Gage Steel Frame 1/10/2020 Not Ready for Inspection DERRICK SPENCER
Pre-Inspection 1/10/2020 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 1/13/2020 Approved SORIN CIRSTOIU
Deputy Steel/Welding 1/13/2020 Approved SORIN CIRSTOIU
Deputy Drilled-In Anchors 1/14/2020 Approved SORIN CIRSTOIU
Deputy Steel/Welding 1/14/2020 Approved SORIN CIRSTOIU
Drywall Nailing 1/14/2020 Partial Approval SORIN CIRSTOIU
Insulation 1/14/2020 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 1/14/2020 Partial Approval SORIN CIRSTOIU
Reinforced Concrete Frame 1/14/2020 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 1/15/2020 Approved SORIN CIRSTOIU
Deputy Steel/Welding 1/15/2020 Approved SORIN CIRSTOIU
Deputy Drilled-In Anchors 1/16/2020 Approved SORIN CIRSTOIU
Deputy Steel/Welding 1/16/2020 Approved SORIN CIRSTOIU
Drywall Nailing 1/16/2020 Partial Approval SORIN CIRSTOIU
Insulation 1/16/2020 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 1/16/2020 Partial Approval SORIN CIRSTOIU
Pre-Inspection 1/16/2020 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 1/17/2020 Approved SORIN CIRSTOIU
Deputy Steel/Welding 1/17/2020 Approved SORIN CIRSTOIU
Pre-Inspection 1/17/2020 Partial Approval SORIN CIRSTOIU
Reinforced Masonry Frame 1/17/2020 Partial Approval SORIN CIRSTOIU
Deputy Fireproofing 1/21/2020 Approved SORIN CIRSTOIU
Deputy Steel/Welding 1/21/2020 Approved SORIN CIRSTOIU
Structural Steel Frame 1/21/2020 Partial Approval SORIN CIRSTOIU
Deputy Fireproofing 1/22/2020 Approved SORIN CIRSTOIU
Deputy Steel/Welding 1/22/2020 Approved SORIN CIRSTOIU
Drywall Nailing 1/22/2020 Partial Approval SORIN CIRSTOIU
Insulation 1/22/2020 Partial Approval SORIN CIRSTOIU
Interior/Exterior Lathing 1/22/2020 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 1/22/2020 Partial Approval SORIN CIRSTOIU
Deputy Fireproofing 1/23/2020 Approved DERRICK SPENCER
Deputy Steel/Welding 1/23/2020 Approved DERRICK SPENCER
Drywall Nailing 1/23/2020 Not Ready for Inspection DERRICK SPENCER
Insulation 1/23/2020 Not Ready for Inspection DERRICK SPENCER
Light Gage Steel Frame 1/23/2020 Not Ready for Inspection DERRICK SPENCER
Deputy Fireproofing 1/24/2020 Approved SORIN CIRSTOIU
Deputy Steel/Welding 1/24/2020 Approved SORIN CIRSTOIU
Pre-Inspection 1/24/2020 Partial Approval SORIN CIRSTOIU
Drywall Nailing 1/27/2020 Partial Approval SORIN CIRSTOIU
Insulation 1/27/2020 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 1/27/2020 Partial Approval SORIN CIRSTOIU
Reinforced Concrete Frame 1/28/2020 Partial Approval SORIN CIRSTOIU
Drywall Nailing 1/30/2020 Partial Approval SORIN CIRSTOIU
Insulation 1/30/2020 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 1/30/2020 Partial Approval SORIN CIRSTOIU
Footing/Foundation/Slab 1/31/2020 Partial Approval DERRICK SPENCER
METHANE-Subgrade 1/31/2020 Approved DERRICK SPENCER
Deputy Steel/Welding 2/3/2020 Approved DERRICK SPENCER
Deputy Steel/Welding 2/4/2020 Approved DERRICK SPENCER
Deputy Steel/Welding 2/5/2020 Approved DERRICK SPENCER
Deputy Steel/Welding 2/6/2020 Approved DERRICK SPENCER
Drywall Nailing 2/6/2020 Not Ready for Inspection DERRICK SPENCER
Insulation 2/6/2020 Not Ready for Inspection DERRICK SPENCER
Light Gage Steel Frame 2/6/2020 Not Ready for Inspection DERRICK SPENCER
Deputy Steel/Welding 2/7/2020 Approved DERRICK SPENCER
Drywall Nailing 2/7/2020 Partial Approval DERRICK SPENCER
Insulation 2/7/2020 Partial Approval DERRICK SPENCER
Light Gage Steel Frame 2/7/2020 Partial Approval DERRICK SPENCER
Deputy Fireproofing 2/10/2020 Approved DERRICK SPENCER
Deputy Steel/Welding 2/10/2020 Approved DERRICK SPENCER
Deputy Fireproofing 2/11/2020 Approved DERRICK SPENCER
Deputy Steel/Welding 2/11/2020 Approved DERRICK SPENCER
Drywall Nailing 2/11/2020 Partial Approval DERRICK SPENCER
Insulation 2/11/2020 Partial Approval DERRICK SPENCER
Light Gage Steel Frame 2/11/2020 Partial Approval DERRICK SPENCER
Reinforced Masonry Frame 2/11/2020 Partial Approval DERRICK SPENCER
Deputy Fireproofing 2/12/2020 Approved DERRICK SPENCER
Deputy Steel/Welding 2/12/2020 Approved DERRICK SPENCER
Pre-Inspection 2/12/2020 Corrections Issued DERRICK SPENCER
Reinforced Concrete Frame 2/12/2020 Partial Approval DERRICK SPENCER
Deputy Fireproofing 2/13/2020 Approved SORIN CIRSTOIU
Deputy Steel/Welding 2/13/2020 Approved SORIN CIRSTOIU
Deputy Fireproofing 2/14/2020 Approved SORIN CIRSTOIU
Deputy Steel/Welding 2/14/2020 Approved SORIN CIRSTOIU
Drywall Nailing 2/14/2020 Partial Approval SORIN CIRSTOIU
Insulation 2/14/2020 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 2/14/2020 Partial Approval SORIN CIRSTOIU
Deputy Fireproofing 2/18/2020 Conditional Approval PAUL DAVIDSON
Deputy Steel/Welding 2/18/2020 Conditional Approval PAUL DAVIDSON
Deputy Fireproofing 2/19/2020 Conditional Approval PAUL DAVIDSON
Deputy Steel/Welding 2/19/2020 Conditional Approval PAUL DAVIDSON
Drywall Nailing 2/19/2020 Partial Approval PAUL DAVIDSON
Insulation 2/19/2020 Not Ready for Inspection PAUL DAVIDSON
Light Gage Steel Frame 2/19/2020 Not Ready for Inspection PAUL DAVIDSON
Deputy Fireproofing 2/20/2020 Conditional Approval PAUL DAVIDSON
Deputy Steel/Welding 2/20/2020 Conditional Approval PAUL DAVIDSON
Drywall Nailing 2/20/2020 Partial Approval PAUL DAVIDSON
Insulation 2/20/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 2/20/2020 Partial Approval PAUL DAVIDSON
Deputy Fireproofing 2/21/2020 Conditional Approval PAUL DAVIDSON
Deputy Steel/Welding 2/21/2020 Conditional Approval PAUL DAVIDSON
Drywall Nailing 2/21/2020 Partial Approval PAUL DAVIDSON
Insulation 2/21/2020 Not Ready for Inspection PAUL DAVIDSON
Light Gage Steel Frame 2/21/2020 Not Ready for Inspection PAUL DAVIDSON
Insulation 2/25/2020 Not Ready for Inspection PAUL DAVIDSON
Light Gage Steel Frame 2/25/2020 Partial Approval PAUL DAVIDSON
T-Bar Ceiling 2/25/2020 Conditional Approval PAUL DAVIDSON
Drywall Nailing 2/26/2020 Not Ready for Inspection PAUL DAVIDSON
Insulation 2/26/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 2/26/2020 Partial Approval PAUL DAVIDSON
Drywall Nailing 3/3/2020 Partial Approval PAUL DAVIDSON
Insulation 3/3/2020 Not Ready for Inspection PAUL DAVIDSON
Light Gage Steel Frame 3/3/2020 Partial Approval PAUL DAVIDSON
Drywall Nailing 3/4/2020 Partial Approval PAUL DAVIDSON
Insulation 3/4/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 3/4/2020 Not Ready for Inspection PAUL DAVIDSON
Drywall Nailing 3/6/2020 Not Ready for Inspection PAUL DAVIDSON
Insulation 3/6/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 3/6/2020 Partial Approval PAUL DAVIDSON
Drywall Nailing 3/9/2020 Not Ready for Inspection PAUL DAVIDSON
Insulation 3/9/2020 Not Ready for Inspection PAUL DAVIDSON
Light Gage Steel Frame 3/9/2020 Not Ready for Inspection PAUL DAVIDSON
Drywall Nailing 3/10/2020 Partial Approval PAUL DAVIDSON
Insulation 3/10/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 3/10/2020 Partial Approval PAUL DAVIDSON
Drywall Nailing 3/11/2020 Not Ready for Inspection PAUL DAVIDSON
Insulation 3/11/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 3/11/2020 Partial Approval PAUL DAVIDSON
Drywall Nailing 3/12/2020 Partial Inspection PAUL DAVIDSON
Insulation 3/12/2020 Partial Inspection PAUL DAVIDSON
Light Gage Steel Frame 3/12/2020 Partial Inspection PAUL DAVIDSON
Drywall Nailing 3/13/2020 Partial Approval DERRICK SPENCER
Insulation 3/13/2020 Partial Approval DERRICK SPENCER
Light Gage Steel Frame 3/13/2020 Partial Approval DERRICK SPENCER
Drywall Nailing 3/16/2020 Partial Approval DERRICK SPENCER
Insulation 3/16/2020 Partial Approval DERRICK SPENCER
Light Gage Steel Frame 3/16/2020 Partial Approval DERRICK SPENCER
Drywall Nailing 3/17/2020 Not Ready for Inspection PAUL DAVIDSON
Insulation 3/17/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 3/17/2020 Partial Approval PAUL DAVIDSON
Drywall Nailing 3/18/2020 Partial Inspection PAUL DAVIDSON
Insulation 3/18/2020 Partial Inspection PAUL DAVIDSON
Light Gage Steel Frame 3/18/2020 Partial Inspection PAUL DAVIDSON
Drywall Nailing 3/19/2020 Not Ready for Inspection PAUL DAVIDSON
Insulation 3/19/2020 Not Ready for Inspection PAUL DAVIDSON
Special/Order Compliance 3/19/2020 Partial Inspection PAUL DAVIDSON
Drywall Nailing 3/20/2020 Partial Approval DERRICK SPENCER
Insulation 3/20/2020 Partial Approval DERRICK SPENCER
Light Gage Steel Frame 3/20/2020 Partial Approval DERRICK SPENCER
Pre-Inspection 3/20/2020 Approved DERRICK SPENCER
Drywall Nailing 3/23/2020 Partial Approval DERRICK SPENCER
Insulation 3/23/2020 Partial Approval DERRICK SPENCER
Light Gage Steel Frame 3/23/2020 Partial Approval DERRICK SPENCER
Pre-Inspection 3/23/2020 Approved DERRICK SPENCER
Drywall Nailing 3/24/2020 Partial Approval DERRICK SPENCER
Insulation 3/24/2020 Partial Approval DERRICK SPENCER
Structural Steel Frame 3/24/2020 Corrections Issued DERRICK SPENCER
Drywall Nailing 3/25/2020 Partial Approval DERRICK SPENCER
Insulation 3/25/2020 Partial Approval DERRICK SPENCER
Light Gage Steel Frame 3/25/2020 Partial Approval DERRICK SPENCER
Drywall Nailing 3/26/2020 Partial Approval DERRICK SPENCER
Insulation 3/26/2020 Partial Approval DERRICK SPENCER
Light Gage Steel Frame 3/26/2020 Partial Approval DERRICK SPENCER
Drywall Nailing 3/27/2020 Partial Approval DERRICK SPENCER
Insulation 3/27/2020 Partial Approval DERRICK SPENCER
Light Gage Steel Frame 3/27/2020 Partial Approval DERRICK SPENCER
Drywall Nailing 3/31/2020 Partial Approval PAUL DAVIDSON
Insulation 3/31/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 3/31/2020 Partial Approval PAUL DAVIDSON
Drywall Nailing 4/1/2020 Not Ready for Inspection PAUL DAVIDSON
Insulation 4/1/2020 Not Ready for Inspection PAUL DAVIDSON
Light Gage Steel Frame 4/1/2020 Not Ready for Inspection PAUL DAVIDSON
Drywall Nailing 4/2/2020 Partial Approval PAUL DAVIDSON
Insulation 4/2/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 4/2/2020 Partial Approval PAUL DAVIDSON
Drywall Nailing 4/3/2020 Not Ready for Inspection PAUL DAVIDSON
Insulation 4/3/2020 Not Ready for Inspection PAUL DAVIDSON
Light Gage Steel Frame 4/3/2020 Not Ready for Inspection PAUL DAVIDSON
Drywall Nailing 4/15/2020 Partial Approval PAUL DAVIDSON
Interior/Exterior Lathing 4/15/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 4/15/2020 Partial Approval PAUL DAVIDSON
Drywall Nailing 4/16/2020 Not Ready for Inspection PAUL DAVIDSON
Insulation 4/16/2020 Not Ready for Inspection PAUL DAVIDSON
Light Gage Steel Frame 4/16/2020 Partial Approval PAUL DAVIDSON
Drywall Nailing 4/17/2020 Not Ready for Inspection PAUL DAVIDSON
Insulation 4/17/2020 Not Ready for Inspection PAUL DAVIDSON
Light Gage Steel Frame 4/17/2020 Not Ready for Inspection PAUL DAVIDSON
Drywall Nailing 4/21/2020 Not Ready for Inspection PAUL DAVIDSON
Insulation 4/21/2020 Not Ready for Inspection PAUL DAVIDSON
Light Gage Steel Frame 4/21/2020 Partial Approval PAUL DAVIDSON
Drywall Nailing 4/22/2020 Partial Approval PAUL DAVIDSON
Insulation 4/22/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 4/22/2020 Partial Approval PAUL DAVIDSON
Drywall Nailing 4/23/2020 Not Ready for Inspection PAUL DAVIDSON
Insulation 4/23/2020 Not Ready for Inspection PAUL DAVIDSON
Light Gage Steel Frame 4/23/2020 Partial Approval PAUL DAVIDSON
Drywall Nailing 4/24/2020 Not Ready for Inspection PAUL DAVIDSON
Insulation 4/24/2020 Not Ready for Inspection PAUL DAVIDSON
Light Gage Steel Frame 4/24/2020 Not Ready for Inspection PAUL DAVIDSON
Drywall Nailing 4/27/2020 Partial Approval DERRICK SPENCER
Insulation 4/27/2020 Partial Approval DERRICK SPENCER
Light Gage Steel Frame 4/27/2020 Partial Approval DERRICK SPENCER
Pre-Inspection 4/27/2020 Approved DERRICK SPENCER
Drywall Nailing 4/28/2020 Not Ready for Inspection PAUL DAVIDSON
Insulation 4/28/2020 Not Ready for Inspection PAUL DAVIDSON
Light Gage Steel Frame 4/28/2020 Partial Inspection PAUL DAVIDSON
Drywall Nailing 4/29/2020 Partial Approval PAUL DAVIDSON
Interior/Exterior Lathing 4/29/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 4/29/2020 Partial Approval PAUL DAVIDSON
Drywall Nailing 4/30/2020 Partial Approval PAUL DAVIDSON
Insulation 4/30/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 4/30/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 5/1/2020 Not Ready for Inspection PAUL DAVIDSON
Drywall Nailing 5/4/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 5/4/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 5/5/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 5/6/2020 Partial Approval PAUL DAVIDSON
Drywall Nailing 5/7/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 5/7/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 5/11/2020 Partial Approval PAUL DAVIDSON
Drywall Nailing 5/12/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 5/12/2020 Partial Approval PAUL DAVIDSON
T-Bar Ceiling 5/12/2020 Partial Approval PAUL DAVIDSON
Drywall Nailing 5/13/2020 Partial Approval PAUL DAVIDSON
Interior/Exterior Lathing 5/13/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 5/13/2020 Partial Approval PAUL DAVIDSON
Drywall Nailing 5/14/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 5/14/2020 Partial Approval PAUL DAVIDSON
Special/Order Compliance 5/15/2020 Partial Inspection PAUL DAVIDSON
Light Gage Steel Frame 5/18/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 5/19/2020 Partial Approval PAUL DAVIDSON
Drywall Nailing 5/20/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 5/20/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 5/21/2020 Not Ready for Inspection PAUL DAVIDSON
Light Gage Steel Frame 5/22/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 5/26/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 5/27/2020 Not Ready for Inspection PAUL DAVIDSON
Interior/Exterior Lathing 5/28/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 5/28/2020 Partial Approval PAUL DAVIDSON
Drywall Nailing 6/9/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 6/9/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 6/10/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 6/11/2020 Not Ready for Inspection PAUL DAVIDSON
Special/Order Compliance 6/11/2020 Approved TED RIES
Drywall Nailing 6/12/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 6/12/2020 Partial Approval PAUL DAVIDSON
Special/Order Compliance 6/15/2020 Partial Inspection PAUL DAVIDSON
Interior/Exterior Lathing 6/16/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 6/16/2020 Partial Approval PAUL DAVIDSON
Drywall Nailing 6/17/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 6/17/2020 Partial Approval PAUL DAVIDSON
T-Bar Ceiling 6/17/2020 Partial Approval PAUL DAVIDSON
Drywall Nailing 6/19/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 6/19/2020 Partial Approval PAUL DAVIDSON
Drywall Nailing 6/23/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 6/25/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 6/30/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 7/2/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 7/7/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 7/8/2020 Not Ready for Inspection PAUL DAVIDSON
Drywall Nailing 7/14/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 7/14/2020 Partial Approval PAUL DAVIDSON
Interior/Exterior Lathing 7/15/2020 Partial Approval PAUL DAVIDSON
Special/Order Compliance 7/17/2020 No Access for Inspection PAUL DAVIDSON
Special/Order Compliance 7/29/2020 Partial Inspection PAUL DAVIDSON
Drywall Nailing 7/30/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 7/30/2020 Partial Approval PAUL DAVIDSON
Drywall Nailing 8/3/2020 Partial Approval PAUL DAVIDSON
Interior/Exterior Lathing 8/3/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 8/3/2020 Conditional Approval PAUL DAVIDSON
Special/Order Compliance 8/4/2020 Partial Inspection PAUL DAVIDSON
Interior/Exterior Lathing 8/5/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 8/6/2020 Partial Approval PAUL DAVIDSON
Drywall Nailing 8/7/2020 Partial Approval DERRICK SPENCER
Drywall Nailing 8/11/2020 Partial Approval PAUL DAVIDSON
Drywall Nailing 8/12/2020 Partial Inspection PAUL DAVIDSON
Drywall Nailing 8/14/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 8/14/2020 Partial Approval PAUL DAVIDSON
Drywall Nailing 8/18/2020 Partial Approval PAUL DAVIDSON
Special/Order Compliance 8/20/2020 Partial Inspection PAUL DAVIDSON
Special/Order Compliance 8/24/2020 Partial Inspection PAUL DAVIDSON
Special/Order Compliance 8/25/2020 Partial Approval PAUL DAVIDSON
Special/Order Compliance 8/26/2020 Partial Inspection PAUL DAVIDSON
Deputy Steel/Welding 8/27/2020 Approved DERRICK SPENCER
Pre-Inspection 8/27/2020 Approved DERRICK SPENCER
Deputy Steel/Welding 8/28/2020 Conditional Approval PAUL DAVIDSON
Drywall Nailing 8/28/2020 Partial Approval PAUL DAVIDSON
Light Gage Steel Frame 8/31/2020 Partial Approval PAUL DAVIDSON
Special/Order Compliance 8/31/2020 Partial Inspection PAUL DAVIDSON
Special/Order Compliance 9/1/2020 Partial Inspection PAUL DAVIDSON
Deputy Reinf. Concrete 9/2/2020 Conditional Approval PAUL DAVIDSON
Special/Order Compliance 9/2/2020 Partial Inspection PAUL DAVIDSON
Special/Order Compliance 9/3/2020 Partial Inspection PAUL DAVIDSON
Special/Order Compliance 9/4/2020 Partial Inspection PAUL DAVIDSON
Special/Order Compliance 9/8/2020 Partial Inspection PAUL DAVIDSON
Special/Order Compliance 9/9/2020 Partial Inspection PAUL DAVIDSON
Light Gage Steel Frame 9/10/2020 Partial Approval PAUL DAVIDSON
Special/Order Compliance 9/10/2020 Partial Inspection PAUL DAVIDSON
Drywall Nailing 9/11/2020 Partial Approval PAUL DAVIDSON
Interior/Exterior Lathing 9/11/2020 Partial Approval PAUL DAVIDSON
Special/Order Compliance 9/14/2020 Partial Inspection PAUL DAVIDSON
Special/Order Compliance 9/15/2020 Partial Inspection PAUL DAVIDSON
Light Gage Steel Frame 9/16/2020 Conditional Approval PAUL DAVIDSON
Special/Order Compliance 9/21/2020 Partial Inspection PAUL DAVIDSON
Deputy Steel/Welding 9/22/2020 Conditional Approval PAUL DAVIDSON
Light Gage Steel Frame 9/22/2020 Partial Approval PAUL DAVIDSON
Special/Order Compliance 9/22/2020 Corrections Issued PAUL DAVIDSON
Drywall Nailing 9/23/2020 Not Ready for Inspection PAUL DAVIDSON
Light Gage Steel Frame 9/23/2020 Partial Approval PAUL DAVIDSON
Drywall Nailing 9/24/2020 Partial Approval PAUL DAVIDSON
Special/Order Compliance 9/24/2020 Partial Inspection PAUL DAVIDSON
Footing/Foundation/Slab 9/25/2020 Partial Approval PAUL DAVIDSON
Drywall Nailing 9/28/2020 Partial Inspection PAUL DAVIDSON
Special/Order Compliance 9/29/2020 Partial Inspection PAUL DAVIDSON
Special/Order Compliance 10/1/2020 Partial Inspection PAUL DAVIDSON
Special/Order Compliance 10/6/2020 Corrections Issued PAUL DAVIDSON
Special/Order Compliance 10/7/2020 Partial Inspection PAUL DAVIDSON
Special/Order Compliance 10/8/2020 Corrections Issued PAUL DAVIDSON
Special/Order Compliance 10/13/2020 Partial Inspection PAUL DAVIDSON
Drywall Nailing 10/15/2020 Not Ready for Inspection PAUL DAVIDSON
Special/Order Compliance 10/21/2020 Partial Inspection PAUL DAVIDSON
Special/Order Compliance 10/23/2020 Partial Inspection PAUL DAVIDSON
Special/Order Compliance 11/4/2020 Partial Inspection PAUL DAVIDSON
Special/Order Compliance 11/16/2020 Partial Inspection PAUL DAVIDSON
Special/Order Compliance 11/23/2020 Partial Inspection PAUL DAVIDSON
Light Gage Steel Frame 12/14/2020 Approved PAUL DAVIDSON
Drywall Nailing 12/17/2020 Partial Approval PAUL DAVIDSON
Interior/Exterior Lathing 12/22/2020 Partial Approval PAUL DAVIDSON
Special/Order Compliance 12/28/2020 No Access for Inspection PAUL DAVIDSON
Pre-Inspection 12/30/2020 Partial Approval PAUL DAVIDSON
Deputy Steel/Welding 2/25/2021 Conditional Approval PAUL DAVIDSON
Pre-Inspection 3/17/2021 Partial Approval PAUL DAVIDSON
Structural Steel Frame 3/17/2021 Partial Inspection PAUL DAVIDSON
Special/Order Compliance 4/7/2021 Conditional Approval PAUL DAVIDSON
Special/Order Compliance 4/27/2021 Approved TED RIES
Light Gage Steel Frame 5/5/2021 Partial Approval DERRICK SPENCER
Pre-Inspection 5/19/2021 Partial Inspection PAUL DAVIDSON
Pre-Inspection 6/1/2021 Not Ready for Inspection PAUL DAVIDSON
Pre-Inspection 6/3/2021 Partial Inspection PAUL DAVIDSON
Pre-Inspection 6/7/2021 Partial Inspection PAUL DAVIDSON
Drywall Nailing 6/8/2021 Pending Review
Special/Order Compliance 6/23/2021 Partial Approval PAUL DAVIDSON
Drywall Nailing 7/19/2021 Partial Inspection PAUL DAVIDSON
Special/Order Compliance 9/15/2021 Partial Inspection PAUL DAVIDSON
Deputy Drilled-In Anchors 10/28/2021 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Concrete 10/28/2021 Conditional Approval PAUL DAVIDSON
Deputy Drilled-In Anchors 11/8/2021 Conditional Approval PAUL DAVIDSON
Deputy Drilled-In Anchors 11/9/2021 Conditional Approval PAUL DAVIDSON
Special/Order Compliance 12/22/2021 Partial Inspection PAUL DAVIDSON
Deputy Steel/Welding 1/3/2022 No Access for Inspection PAUL DAVIDSON
Deputy Steel/Welding 1/4/2022 Conditional Approval PAUL DAVIDSON
Deputy Steel/Welding 1/18/2022 Conditional Approval PAUL DAVIDSON
Deputy Steel/Welding 1/19/2022 Conditional Approval PAUL DAVIDSON
Deputy Steel/Welding 1/20/2022 Conditional Approval PAUL DAVIDSON
Deputy Steel/Welding 1/21/2022 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Concrete 2/8/2022 Conditional Approval PAUL DAVIDSON
Special/Order Compliance 3/9/2022 Partial Inspection PAUL DAVIDSON
Deputy Steel/Welding 6/3/2022 Conditional Approval PAUL DAVIDSON
Special/Order Compliance 9/13/2022 Partial Inspection PAUL DAVIDSON
Final 12/6/2022 Not Ready for Inspection DERRICK SPENCER
Footing/Foundation/Slab 12/6/2022 Approved DERRICK SPENCER
Green Building Final 12/6/2022 Not Ready for Inspection DERRICK SPENCER
Reinforced Concrete Frame 12/6/2022 Approved DERRICK SPENCER
SGSOV-Seismic Gas S/O Valve 12/6/2022 SGSOV Approved DERRICK SPENCER
Smoke Detectors 12/6/2022 Approved DERRICK SPENCER
Special/Order Compliance 3/9/2023 Partial Inspection PAUL DAVIDSON
Special/Order Compliance 9/6/2023 Partial Inspection PAUL DAVIDSON
Final 9/25/2023 No Access for Inspection PAUL DAVIDSON
Green Building Final 9/25/2023 No Access for Inspection PAUL DAVIDSON
Final 9/26/2023 Conditional Approval PAUL DAVIDSON
Green Building Final 9/26/2023 Approved PAUL DAVIDSON