6245 W WILSHIRE BLVD 90048

Certificate Information: 6245 W WILSHIRE BLVD 90048

Application / Permit
15010-10000-00771
Plan Check / Job No.
B15LA03133
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
New 19-story mixed use( Apartment /Core and Shell only Retail) builidng with 3 levels of basement parking garage .
Permit Issued
Issued on 8/25/2016
Issuing Office
Metro
Current Status
CofO Corrected on 5/14/2019
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 3/20/2015 APPLICANT
Assigned to Plan Check Engineer 4/9/2015 SAI KHUM
Corrections Issued 4/29/2015 SAI KHUM
Quality Review Completed 5/6/2015 CHARLES CHANG
Building Plans Picked Up 5/6/2015 APPLICANT
Applicant returned to address corrections 6/9/2015 SAI KHUM
Applicant returned to address corrections 7/21/2015 SAI KHUM
Applicant returned to address corrections 8/28/2015 SAI KHUM
Applicant returned to address corrections 9/2/2015 SAI KHUM
Applicant returned to address corrections 9/14/2015 SAI KHUM
Applicant returned to address corrections 11/2/2015 SAI KHUM
Applicant returned to address corrections 11/16/2015 SAI KHUM
Applicant returned to address corrections 1/4/2016 SAI KHUM
Applicant returned to address corrections 1/7/2016 SAI KHUM
Applicant returned to address corrections 1/12/2016 SAI KHUM
Applicant returned to address corrections 3/14/2016 ALLEN MANALANSAN
Applicant returned to address corrections 3/21/2016 ALLEN MANALANSAN
Applicant returned to address corrections 7/11/2016 SAI KHUM
Applicant returned to address corrections 7/13/2016 SAI KHUM
Plan Check Approved 8/25/2016 SAI KWAN KHUM
Issued 8/25/2016 LADBS
TCO Issued (Expire Date: 10-23-2018) 4/26/2018 HAMID PISHEHVAR
TCO Issued (Expire Date: 04-22-2019) 10/24/2018 RICKEY JACKSON
CofO in Progress 10/31/2018 GREGORY POMISH
CofO Issued-Status Void 11/27/2018 RICKEY JACKSON
Permit Finaled-Status Void 11/27/2018 RICKEY JACKSON
Re-Activate Permit 5/14/2019 DAVID TSAU
CofO Corrected 5/14/2019 DAVID TSAU
Permit Finaled 5/14/2019 DAVID TSAU

Permit Application Clearance Information

Address approval Cleared 8/3/2015 ARMENIA HERNANDEZ
Metro Rail approval Cleared 9/28/2015 SAI KWAN KHUM
Highway dedication Cleared 10/27/2015 ARMENIA HERNANDEZ
Low Impact Development Cleared 1/25/2016 AMMAR ELTAWIL
Stormwater Pollution Mitigatn Cleared 1/25/2016 AMMAR ELTAWIL
Eng Process Fee Ord 176,300 Cleared 4/19/2016 JAMES KHO
Sewer availability Cleared 4/19/2016 ARMENIA AGUILAR
DAS Clearance Cleared 7/20/2016 SAI KWAN KHUM
Construction near power lines Cleared 7/26/2016 WALTER RAMIREZ
Construction within easement Cleared 7/26/2016 WALTER RAMIREZ
Driveway location Cleared 7/26/2016 COLLINS ALLAN
"D" conditions Cleared 8/3/2016 MARITZA PRZEKOP
"Q" conditions Cleared 8/3/2016 MARITZA PRZEKOP
Miscellaneous Cleared 8/3/2016 MARITZA PRZEKOP
Opn space landscape/Water mgmt Cleared 8/3/2016 MARITZA PRZEKOP
Permit Cleared 8/3/2016 JAMES KHO
Prkng lot landscape/Water mgmt Cleared 8/3/2016 MARITZA PRZEKOP
Roof/Waste drainage to street Cleared 8/3/2016 JAMES KHO
Site Plan review Cleared 8/3/2016 MARITZA PRZEKOP
Tract Map conditions Cleared 8/3/2016 MARITZA PRZEKOP
Work Adjacent to Public Way Cleared 8/3/2016 WARREN LIU
ZA Case Cleared 8/3/2016 MARITZA PRZEKOP
ZA Case Cleared 8/3/2016 MARITZA PRZEKOP
ZA Case Cleared 8/3/2016 MARITZA PRZEKOP
Green Code Cleared 8/4/2016 RUSSELL KELLY
Hydrant and Access approval Cleared 8/4/2016 ROBERT DUFF
Internal circulation Cleared 8/4/2016 COLLINS ALLAN
Fire Marshall Fire Life Safety Cleared 8/19/2016 DAVE MYERS
Methane Ordinance Cleared 8/19/2016 DAVE MYERS
Building over 3-story or 36-ft Cleared 8/25/2016 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 8/25/2016 CALOSHA APPROVED
Hold Cleared 9/15/2016 LOURDES RAMIRO

Contact Information

Architect Hart, David Curtis; Lic. No.: C26391 16127 ALCIMA AVENUE      PACIFIC PALISADES, CA 90272
Contractor Matt Construction Corporation; Lic. No.: 631020-B 9814 NORWALK BLVD #100      SANTA FE SPRINGS, CA 90670
Engineer Powers, Brian Frederick; Lic. No.: C75902 2090 WEST 31ST STREET      LOS ANGELES, CA 90018
Engineer Wilkerson, Ryan Lee; Lic. No.: S4728 20734 SARDINIA WAY      PORTER RANCH, CA 91326
Engineer Zadoorian, Christopher John; Lic. No.: GE2493 2121 S TOWNE CENTRE PLACE SUITE 130      ANAHEIM, CA 92806

Inspector Information

EDWIN GREGORYONA, (213) 482-7357 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

METHANE-Rough 9/27/2016 Partial Inspection GREGORY POMISH
Reinforced Concrete Frame 9/27/2016 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 9/27/2016 Not Ready for Inspection GREGORY POMISH
Footing/Foundation/Slab 9/29/2016 Partial Inspection GREGORY POMISH
METHANE-Barrier 9/29/2016 Partial Inspection GREGORY POMISH
METHANE-Subgrade 9/29/2016 Partial Inspection GREGORY POMISH
METHANE-Rough 10/7/2016 Partial Inspection GREGORY POMISH
Reinforced Concrete Frame 10/7/2016 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 10/7/2016 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 10/11/2016 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 10/12/2016 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 10/13/2016 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 10/14/2016 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 10/17/2016 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/18/2016 Conditional Approval GREGORY POMISH
METHANE-Rough 10/18/2016 Partial Inspection GREGORY POMISH
Reinforced Concrete Frame 10/18/2016 Partial Inspection GREGORY POMISH
Verify Sprinkler Sign Off 10/18/2016 Not Ready for Inspection GREGORY POMISH
Deputy Shotcrete 10/19/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/20/2016 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/20/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/21/2016 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/21/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/24/2016 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/24/2016 Conditional Approval GREGORY POMISH
METHANE-Rough 10/24/2016 Partial Inspection GREGORY POMISH
Reinforced Concrete Frame 10/24/2016 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 10/24/2016 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 10/25/2016 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/25/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/26/2016 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/26/2016 Conditional Approval GREGORY POMISH
METHANE-Rough 10/26/2016 Partial Inspection GREGORY POMISH
Reinforced Concrete Frame 10/26/2016 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 10/26/2016 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 10/27/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/28/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/31/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/1/2016 Conditional Approval GREGORY POMISH
METHANE-Rough 11/1/2016 Partial Inspection GREGORY POMISH
Reinforced Concrete Frame 11/1/2016 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 11/1/2016 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 11/2/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/3/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/4/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/7/2016 Conditional Approval GREGORY POMISH
METHANE-Rough 11/7/2016 Partial Inspection GREGORY POMISH
Reinforced Concrete Frame 11/7/2016 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 11/7/2016 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 11/8/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/9/2016 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/9/2016 Conditional Approval GREGORY POMISH
METHANE-Rough 11/9/2016 Partial Inspection GREGORY POMISH
Reinforced Concrete Frame 11/9/2016 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 11/9/2016 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 11/10/2016 Partial Approval JAMES POWERS
Deputy Shotcrete 11/10/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/14/2016 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/14/2016 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 11/14/2016 Partial Approval GREGORY POMISH
METHANE-Barrier 11/14/2016 Partial Approval GREGORY POMISH
METHANE-Subgrade 11/14/2016 Partial Inspection GREGORY POMISH
Reinforced Masonry Frame 11/14/2016 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 11/15/2016 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/15/2016 Conditional Approval GREGORY POMISH
T-Bar Ceiling 11/15/2016 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 11/16/2016 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/16/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/17/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/18/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/21/2016 Conditional Approval GREGORY POMISH
METHANE-Rough 11/21/2016 Partial Inspection GREGORY POMISH
Reinforced Concrete Frame 11/21/2016 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 11/21/2016 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 11/22/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/30/2016 Conditional Approval GREGORY POMISH
METHANE-Rough 11/30/2016 Partial Approval GREGORY POMISH
Reinforced Concrete Frame 11/30/2016 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 11/30/2016 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 12/1/2016 Conditional Approval GREGORY POMISH
Interior/Exterior Lathing 12/1/2016 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 12/2/2016 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 12/2/2016 Partial Approval GREGORY POMISH
METHANE-Barrier 12/2/2016 Approved GREGORY POMISH
METHANE-Subgrade 12/2/2016 Approved GREGORY POMISH
Deputy Reinf. Concrete 12/5/2016 Conditional Approval GREGORY POMISH
METHANE-Rough 12/5/2016 Approved GREGORY POMISH
Reinforced Concrete Frame 12/5/2016 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 12/5/2016 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 12/6/2016 Conditional Approval GREGORY POMISH
Piling/Pier/Caisson 12/6/2016 Partial Approval GREGORY POMISH
Reinforced Concrete Frame 12/7/2016 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 12/7/2016 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 12/8/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/9/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/12/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/15/2016 Conditional Approval BARRY SILLS
Deputy Reinf. Concrete 12/16/2016 Conditional Approval BARRY SILLS
Deputy Reinf. Concrete 12/19/2016 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/20/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/21/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/22/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/23/2016 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 12/27/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/27/2016 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 12/27/2016 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 12/27/2016 Not Ready for Inspection GREGORY POMISH
Deputy Pre-Stress Concrete 12/28/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/28/2016 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 12/29/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/29/2016 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 12/30/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/30/2016 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 1/3/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/3/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 1/3/2017 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 1/3/2017 Not Ready for Inspection GREGORY POMISH
Deputy Pre-Stress Concrete 1/4/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/4/2017 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 1/4/2017 Partial Inspection GREGORY POMISH
Deputy Pre-Stress Concrete 1/5/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/5/2017 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 1/5/2017 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 1/6/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/6/2017 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 1/6/2017 Partial Inspection GREGORY POMISH
Deputy Pre-Stress Concrete 1/9/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/9/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 1/9/2017 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 1/9/2017 Not Ready for Inspection GREGORY POMISH
Deputy Pre-Stress Concrete 1/10/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/10/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 1/11/2017 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 1/11/2017 Conditional Approval KATY RAMIREZ
Deputy Pre-Stress Concrete 1/12/2017 Conditional Approval BARRY SILLS
Deputy Reinf. Concrete 1/12/2017 Conditional Approval BARRY SILLS
Deputy Pre-Stress Concrete 1/13/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/13/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 1/17/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/17/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 1/18/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/18/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 1/19/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/19/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 1/20/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/20/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 1/23/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/23/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 1/23/2017 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 1/23/2017 Not Ready for Inspection GREGORY POMISH
Deputy Pre-Stress Concrete 1/24/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/24/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 1/26/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/26/2017 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 1/26/2017 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 1/27/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/27/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 1/30/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/30/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 1/31/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/31/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 1/31/2017 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 1/31/2017 Partial Inspection GREGORY POMISH
Deputy Pre-Stress Concrete 2/1/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/1/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/2/2017 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 2/2/2017 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 2/3/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/3/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 2/3/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 2/7/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/7/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 2/7/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 2/8/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/8/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 2/8/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 2/9/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/9/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 2/9/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 2/9/2017 Partial Inspection GREGORY POMISH
Verify Sprinkler Sign Off 2/9/2017 Partial Inspection GREGORY POMISH
Footing/Foundation/Slab 2/13/2017 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 2/14/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/14/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 2/14/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 2/15/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/15/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 2/15/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 2/15/2017 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 2/15/2017 Partial Inspection GREGORY POMISH
Deputy Pre-Stress Concrete 2/16/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/16/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 2/16/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 2/17/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/17/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 2/17/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/21/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/21/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 2/21/2017 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 2/21/2017 Partial Approval GREGORY POMISH
Reinforced Concrete Frame 2/22/2017 Partial Inspection GREGORY POMISH
Verify Sprinkler Sign Off 2/22/2017 Not Ready for Inspection GREGORY POMISH
Deputy Pre-Stress Concrete 2/24/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/24/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 2/24/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 2/27/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/27/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 2/27/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 2/28/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/28/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 2/28/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 3/1/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/1/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/1/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/2/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/2/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 3/2/2017 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 3/2/2017 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 3/3/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/3/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 3/3/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 3/6/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 3/6/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/6/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 3/6/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 3/7/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 3/7/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/7/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 3/7/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 3/7/2017 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 3/7/2017 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 3/8/2017 Conditional Approval GREGORY POMISH
Deputy Methane Barrier 3/8/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 3/8/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/8/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 3/8/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 3/9/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 3/9/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/9/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 3/9/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 3/9/2017 Partial Approval GREGORY POMISH
Reinforced Masonry Frame 3/9/2017 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 3/9/2017 Not Ready for Inspection GREGORY POMISH
Deputy Drilled-In Anchors 3/10/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/10/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 3/13/2017 Conditional Approval BARRY SILLS
Deputy Pre-Stress Concrete 3/13/2017 Conditional Approval BARRY SILLS
Deputy Reinf. Concrete 3/13/2017 Conditional Approval BARRY SILLS
Deputy Reinf. Masonry 3/13/2017 Conditional Approval BARRY SILLS
Reinforced Masonry Frame 3/13/2017 Partial Approval BARRY SILLS
Deputy Drilled-In Anchors 3/14/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 3/14/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/14/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 3/14/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 3/14/2017 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 3/14/2017 Not Ready for Inspection GREGORY POMISH
Deputy Drilled-In Anchors 3/15/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 3/15/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/15/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 3/15/2017 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 3/15/2017 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 3/16/2017 Conditional Approval GREGORY POMISH
Deputy Methane Barrier 3/16/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 3/16/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/16/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 3/16/2017 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 3/16/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 3/17/2017 Conditional Approval GREGORY POMISH
Deputy Methane Barrier 3/17/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 3/17/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/17/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 3/17/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 3/20/2017 Conditional Approval GREGORY POMISH
Deputy Methane Barrier 3/20/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/20/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 3/21/2017 Conditional Approval GREGORY POMISH
Deputy Methane Barrier 3/21/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 3/21/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/21/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 3/21/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 3/22/2017 Conditional Approval GREGORY POMISH
Deputy Methane Barrier 3/22/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 3/22/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/22/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 3/22/2017 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 3/22/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 3/23/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 3/23/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/23/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 3/23/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 3/24/2017 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 3/24/2017 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 3/24/2017 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 3/24/2017 Conditional Approval DAVID BURKHEAD
Reinforced Concrete Frame 3/24/2017 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 3/24/2017 Not Ready for Inspection DAVID BURKHEAD
Deputy Drilled-In Anchors 3/28/2017 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 3/28/2017 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 3/28/2017 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 3/28/2017 Conditional Approval DAVID BURKHEAD
Reinforced Concrete Frame 3/28/2017 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 3/29/2017 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 3/29/2017 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 3/29/2017 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 3/29/2017 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 3/30/2017 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 3/30/2017 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 3/30/2017 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 3/30/2017 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 3/30/2017 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 3/31/2017 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 3/31/2017 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 3/31/2017 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 3/31/2017 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 4/3/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 4/3/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/3/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 4/3/2017 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 4/3/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 4/4/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/4/2017 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 4/4/2017 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 4/5/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/5/2017 Conditional Approval GREGORY POMISH
Drywall Nailing 4/5/2017 Partial Approval GREGORY POMISH
Insulation 4/5/2017 Partial Approval GREGORY POMISH
Reinforced Concrete Frame 4/5/2017 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 4/5/2017 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 4/6/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 4/6/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/6/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 4/6/2017 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 4/6/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 4/7/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 4/7/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/7/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 4/7/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 4/10/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 4/10/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/10/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 4/10/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 4/10/2017 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 4/10/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 4/11/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 4/11/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/11/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 4/11/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 4/12/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 4/12/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/12/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 4/12/2017 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 4/12/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 4/13/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 4/13/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/13/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 4/13/2017 Conditional Approval GREGORY POMISH
Drywall Nailing 4/13/2017 Partial Approval GREGORY POMISH
Light Gage Steel Frame 4/13/2017 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 4/14/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/14/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 4/14/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 4/14/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 4/17/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 4/17/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/17/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 4/17/2017 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 4/17/2017 Partial Approval GREGORY POMISH
Insulation 4/17/2017 Partial Approval GREGORY POMISH
Light Gage Steel Frame 4/17/2017 Partial Approval GREGORY POMISH
Pre-Inspection 4/17/2017 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 4/18/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 4/18/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/18/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 4/18/2017 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 4/18/2017 Partial Approval GREGORY POMISH
Reinforced Masonry Frame 4/18/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 4/19/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/19/2017 Conditional Approval GREGORY POMISH
Drywall Nailing 4/19/2017 Partial Approval GREGORY POMISH
Light Gage Steel Frame 4/19/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 4/20/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 4/20/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/20/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 4/20/2017 Conditional Approval GREGORY POMISH
Insulation 4/20/2017 Partial Approval GREGORY POMISH
Light Gage Steel Frame 4/20/2017 Partial Approval GREGORY POMISH
Reinforced Masonry Frame 4/20/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 4/21/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 4/21/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/21/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 4/21/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 4/24/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 4/24/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/24/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 4/24/2017 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 4/24/2017 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 4/25/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 4/25/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/25/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 4/25/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 4/26/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 4/26/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/26/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 4/26/2017 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 4/26/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 4/27/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 4/27/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/27/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 4/27/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 4/27/2017 Not Ready for Inspection GREGORY POMISH
Verify Sprinkler Sign Off 4/27/2017 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 4/28/2017 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 4/28/2017 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/28/2017 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 4/28/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 4/28/2017 Partial Approval DAVID BURKHEAD
Insulation 4/28/2017 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 4/28/2017 Partial Approval DAVID BURKHEAD
Piling/Pier/Caisson 4/28/2017 Partial Approval DAVID BURKHEAD
Reinforced Masonry Frame 4/28/2017 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 5/1/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 5/1/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/1/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 5/1/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 5/2/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 5/2/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/2/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 5/2/2017 Conditional Approval GREGORY POMISH
Drywall Nailing 5/2/2017 Partial Approval GREGORY POMISH
Insulation 5/2/2017 Partial Approval GREGORY POMISH
Light Gage Steel Frame 5/2/2017 Partial Approval GREGORY POMISH
Reinforced Masonry Frame 5/2/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 5/3/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 5/3/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/3/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 5/3/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 5/4/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/4/2017 Conditional Approval GREGORY POMISH
Insulation 5/4/2017 Partial Approval GREGORY POMISH
Pre-Inspection 5/4/2017 Partial Approval GREGORY POMISH
Reinforced Masonry Frame 5/4/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 5/5/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 5/5/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/5/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 5/5/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 5/8/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/8/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 5/8/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 5/9/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/9/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 5/9/2017 Conditional Approval GREGORY POMISH
Drywall Nailing 5/9/2017 Partial Approval GREGORY POMISH
Green Building Rough 5/9/2017 Not Ready for Inspection WILLIAM ROSE
Reinforced Concrete Frame 5/9/2017 Partial Approval GREGORY POMISH
Reinforced Masonry Frame 5/9/2017 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 5/9/2017 Partial Inspection GREGORY POMISH
Deputy Pre-Stress Concrete 5/10/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/10/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 5/10/2017 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 5/10/2017 Partial Inspection GREGORY POMISH
Deputy Pre-Stress Concrete 5/11/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/11/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 5/11/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 5/11/2017 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 5/11/2017 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 5/12/2017 Partial Approval GREGORY POMISH
Reinforced Masonry Frame 5/15/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 5/16/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/16/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 5/17/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/17/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 5/18/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 5/18/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/18/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 5/19/2017 Approved SAKO AGHAZARIAN
Deputy Pre-Stress Concrete 5/19/2017 Approved SAKO AGHAZARIAN
Deputy Reinf. Concrete 5/19/2017 Approved SAKO AGHAZARIAN
Reinforced Concrete Frame 5/19/2017 Partial Approval SAKO AGHAZARIAN
Verify Sprinkler Sign Off 5/19/2017 Approved SAKO AGHAZARIAN
Deputy Drilled-In Anchors 5/22/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 5/22/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/22/2017 Conditional Approval GREGORY POMISH
Drywall Nailing 5/22/2017 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 5/22/2017 Partial Inspection GREGORY POMISH
Deputy Pre-Stress Concrete 5/23/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/23/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 5/24/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/24/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/25/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 5/26/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/26/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 5/30/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/30/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 5/31/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/31/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 6/1/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/1/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 6/1/2017 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 6/2/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/2/2017 Conditional Approval GREGORY POMISH
Drywall Nailing 6/2/2017 Partial Inspection GREGORY POMISH
Green Building Rough 6/2/2017 Not Ready for Inspection WILLIAM ROSE
Light Gage Steel Frame 6/2/2017 Partial Inspection GREGORY POMISH
Deputy Pre-Stress Concrete 6/5/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/5/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 6/6/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/6/2017 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 6/6/2017 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 6/7/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/7/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 6/8/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/8/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 6/12/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/12/2017 Conditional Approval GREGORY POMISH
Drywall Nailing 6/12/2017 Partial Inspection GREGORY POMISH
Green Building Rough 6/12/2017 No Access for Inspection WILLIAM ROSE
Deputy Drilled-In Anchors 6/13/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 6/13/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/13/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 6/13/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 6/14/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 6/14/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/14/2017 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 6/14/2017 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 6/15/2017 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 6/15/2017 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/15/2017 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 6/16/2017 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 6/16/2017 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 6/16/2017 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 6/19/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/19/2017 Conditional Approval GREGORY POMISH
Drywall Nailing 6/19/2017 Partial Inspection GREGORY POMISH
Footing/Foundation/Slab 6/19/2017 Partial Approval GREGORY POMISH
Insulation 6/19/2017 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 6/19/2017 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 6/20/2017 Conditional Approval GREGORY POMISH
Insulation 6/20/2017 Partial Approval GREGORY POMISH
Light Gage Steel Frame 6/20/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 6/21/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 6/22/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/22/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 6/23/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/23/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 6/23/2017 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 6/26/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/26/2017 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 6/26/2017 Partial Approval GREGORY POMISH
Reinforced Masonry Frame 6/26/2017 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 6/27/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/27/2017 Conditional Approval GREGORY POMISH
Drywall Nailing 6/27/2017 Partial Approval GREGORY POMISH
Insulation 6/27/2017 Partial Approval GREGORY POMISH
Light Gage Steel Frame 6/27/2017 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 6/28/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/28/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/29/2017 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 6/29/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 6/30/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/3/2017 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 7/5/2017 Conditional Approval GREGORY POMISH
Drywall Nailing 7/5/2017 Partial Approval GREGORY POMISH
Light Gage Steel Frame 7/5/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 7/6/2017 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 7/6/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 7/7/2017 Conditional Approval GREGORY POMISH
Drywall Nailing 7/7/2017 Partial Approval GREGORY POMISH
Insulation 7/7/2017 Partial Approval GREGORY POMISH
Light Gage Steel Frame 7/7/2017 Partial Approval GREGORY POMISH
Reinforced Concrete Frame 7/7/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 7/10/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/11/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/12/2017 Conditional Approval GREGORY POMISH
Drywall Nailing 7/12/2017 Partial Approval GREGORY POMISH
Green Building Rough 7/12/2017 Not Ready for Inspection WILLIAM ROSE
Light Gage Steel Frame 7/12/2017 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 7/13/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/13/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 7/14/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/14/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 7/17/2017 Partial Approval JONATHAN QUACH
Deputy Reinf. Concrete 7/17/2017 Partial Approval JONATHAN QUACH
Drywall Nailing 7/17/2017 No Access for Inspection ERNESTO CORRAL
Insulation 7/17/2017 No Access for Inspection ERNESTO CORRAL
Light Gage Steel Frame 7/17/2017 No Access for Inspection ERNESTO CORRAL
Deputy Pre-Stress Concrete 7/18/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/18/2017 Conditional Approval GREGORY POMISH
Green Building Rough 7/18/2017 Not Ready for Inspection DONALD CRICHLOW
Insulation 7/18/2017 Partial Approval GREGORY POMISH
Light Gage Steel Frame 7/18/2017 Not Ready for Inspection GREGORY POMISH
Reinforced Concrete Frame 7/18/2017 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 7/19/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/19/2017 Conditional Approval GREGORY POMISH
Insulation 7/19/2017 Partial Approval GREGORY POMISH
Light Gage Steel Frame 7/19/2017 Partial Approval GREGORY POMISH
Pre-Inspection 7/19/2017 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 7/20/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/20/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 7/20/2017 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 7/20/2017 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 7/21/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/21/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 7/21/2017 Conditional Approval GREGORY POMISH
Drywall Nailing 7/21/2017 Partial Approval GREGORY POMISH
Insulation 7/21/2017 Partial Approval GREGORY POMISH
Light Gage Steel Frame 7/21/2017 Partial Approval GREGORY POMISH
Reinforced Masonry Frame 7/21/2017 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 7/24/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/24/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 7/24/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 7/25/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/25/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 7/25/2017 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 7/25/2017 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 7/26/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/26/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 7/26/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/27/2017 Conditional Approval GREGORY POMISH
Drywall Nailing 7/27/2017 Partial Approval GREGORY POMISH
Green Building Rough 7/27/2017 No Access for Inspection WILLIAM ROSE
Insulation 7/27/2017 Partial Approval GREGORY POMISH
Light Gage Steel Frame 7/27/2017 Partial Approval GREGORY POMISH
Reinforced Concrete Frame 7/27/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 7/28/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/31/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 8/1/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/1/2017 Conditional Approval GREGORY POMISH
Drywall Nailing 8/1/2017 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 8/2/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/2/2017 Conditional Approval GREGORY POMISH
Insulation 8/2/2017 Partial Approval GREGORY POMISH
Light Gage Steel Frame 8/2/2017 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 8/3/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/3/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 8/4/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/4/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/7/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/7/2017 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 8/7/2017 Partial Approval GREGORY POMISH
Drywall Nailing 8/10/2017 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 8/11/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/11/2017 Conditional Approval GREGORY POMISH
Insulation 8/11/2017 Partial Approval GREGORY POMISH
Light Gage Steel Frame 8/11/2017 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 8/14/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/14/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 8/15/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/15/2017 Conditional Approval GREGORY POMISH
Green Building Rough 8/15/2017 Partial Approval WILLIAM ROSE
Reinforced Concrete Frame 8/15/2017 Not Ready for Inspection GREGORY POMISH
Deputy Pre-Stress Concrete 8/16/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/16/2017 Conditional Approval GREGORY POMISH
Drywall Nailing 8/16/2017 Partial Approval GREGORY POMISH
Footing/Foundation/Slab 8/16/2017 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 8/17/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/17/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 8/17/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 8/18/2017 Conditional Approval GREGORY POMISH
Insulation 8/18/2017 Partial Approval GREGORY POMISH
Light Gage Steel Frame 8/18/2017 Partial Approval GREGORY POMISH
Light Gage Steel Frame 8/23/2017 Partial Approval GREGORY POMISH
Drywall Nailing 8/25/2017 Partial Approval GREGORY POMISH
Reinforced Concrete Frame 8/25/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 8/28/2017 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 8/30/2017 Partial Approval GREGORY POMISH
Light Gage Steel Frame 9/5/2017 Partial Approval GREGORY POMISH
Drywall Nailing 9/8/2017 Partial Approval GREGORY POMISH
Insulation 9/8/2017 Partial Approval GREGORY POMISH
Reinforced Concrete Frame 9/11/2017 Partial Approval GREGORY POMISH
Drywall Nailing 9/13/2017 Not Ready for Inspection DAVID BURKHEAD
Green Building Rough 9/13/2017 Not Ready for Inspection WILLIAM ROSE
Insulation 9/13/2017 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 9/13/2017 Partial Inspection DAVID BURKHEAD
Drywall Nailing 9/15/2017 Partial Approval GREGORY POMISH
Insulation 9/15/2017 Partial Approval GREGORY POMISH
Light Gage Steel Frame 9/15/2017 Partial Approval GREGORY POMISH
Reinforced Concrete Frame 9/18/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 9/19/2017 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 9/19/2017 Partial Inspection GREGORY POMISH
Drywall Nailing 9/20/2017 Partial Approval GREGORY POMISH
Light Gage Steel Frame 9/20/2017 Partial Approval GREGORY POMISH
Light Gage Steel Frame 9/25/2017 Partial Approval GREGORY POMISH
Light Gage Steel Frame 9/27/2017 Partial Approval GREGORY POMISH
Reinforced Concrete Frame 9/28/2017 Partial Approval GREGORY POMISH
Drywall Nailing 10/2/2017 Partial Approval GREGORY POMISH
Drywall Nailing 10/5/2017 Not Ready for Inspection GREGORY POMISH
Light Gage Steel Frame 10/5/2017 Partial Approval GREGORY POMISH
Drywall Nailing 10/10/2017 Partial Approval GREGORY POMISH
Green Building Rough 10/10/2017 Not Ready for Inspection WILLIAM ROSE
Light Gage Steel Frame 10/10/2017 Partial Approval GREGORY POMISH
Reinforced Concrete Frame 10/11/2017 Partial Approval GREGORY POMISH
Structural Steel Frame 10/20/2017 Not Ready for Inspection GREGORY POMISH
Structural Steel Frame 10/23/2017 Partial Approval GREGORY POMISH
Drywall Nailing 10/24/2017 Partial Inspection GREGORY POMISH
Green Building Rough 10/24/2017 Not Ready for Inspection WILLIAM ROSE
Drywall Nailing 10/26/2017 Partial Inspection GREGORY POMISH
Green Building Rough 10/26/2017 Partial Approval WILLIAM ROSE
Insulation 10/26/2017 Partial Approval GREGORY POMISH
Structural Steel Frame 10/26/2017 Partial Approval GREGORY POMISH
Reinforced Concrete Frame 10/31/2017 Partial Approval GREGORY POMISH
Drywall Nailing 11/1/2017 Partial Approval GREGORY POMISH
Green Building Rough 11/1/2017 Partial Inspection GREGORY POMISH
Insulation 11/1/2017 Partial Approval GREGORY POMISH
Light Gage Steel Frame 11/1/2017 Partial Approval GREGORY POMISH
Structural Steel Frame 11/1/2017 Partial Approval GREGORY POMISH
Drywall Nailing 11/7/2017 Partial Approval GREGORY POMISH
Green Building Rough 11/7/2017 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 11/7/2017 Partial Approval GREGORY POMISH
Drywall Nailing 11/14/2017 Partial Approval GREGORY POMISH
Green Building Rough 11/14/2017 Partial Inspection GREGORY POMISH
Interior/Exterior Lathing 11/14/2017 Partial Approval GREGORY POMISH
Light Gage Steel Frame 11/14/2017 Partial Approval GREGORY POMISH
Light Gage Steel Frame 11/28/2017 Partial Approval GREGORY POMISH
Pre-Inspection 11/28/2017 Partial Inspection GREGORY POMISH
Interior/Exterior Lathing 12/6/2017 Partial Approval GREGORY POMISH
Interior/Exterior Lathing 12/8/2017 Partial Approval GREGORY POMISH
Drywall Nailing 12/15/2017 Partial Approval GREGORY POMISH
Green Building Rough 12/15/2017 Approved GREGORY POMISH
Light Gage Steel Frame 12/15/2017 Partial Approval GREGORY POMISH
Drywall Nailing 12/20/2017 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 12/20/2017 Partial Approval GREGORY POMISH
Light Gage Steel Frame 12/21/2017 Partial Approval GREGORY POMISH
Light Gage Steel Frame 12/22/2017 Partial Approval GREGORY POMISH
Drywall Nailing 1/4/2018 Partial Approval GREGORY POMISH
Light Gage Steel Frame 1/4/2018 Partial Approval GREGORY POMISH
Reinforced Masonry Frame 1/4/2018 Partial Approval GREGORY POMISH
Light Gage Steel Frame 1/9/2018 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 1/10/2018 Partial Approval GREGORY POMISH
Light Gage Steel Frame 1/12/2018 Partial Approval GREGORY POMISH
Drywall Nailing 1/17/2018 Partial Approval GREGORY POMISH
Insulation 1/17/2018 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 1/17/2018 Partial Approval GREGORY POMISH
Light Gage Steel Frame 1/18/2018 Partial Approval GREGORY POMISH
Light Gage Steel Frame 1/24/2018 Partial Approval GREGORY POMISH
Drywall Nailing 1/25/2018 Partial Approval GREGORY POMISH
Reinforced Concrete Frame 1/26/2018 Partial Approval GREGORY POMISH
Drywall Nailing 1/30/2018 Partial Approval GREGORY POMISH
Light Gage Steel Frame 1/30/2018 Partial Approval GREGORY POMISH
Light Gage Steel Frame 2/1/2018 Partial Approval GREGORY POMISH
Light Gage Steel Frame 2/2/2018 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 2/6/2018 Partial Approval GREGORY POMISH
Light Gage Steel Frame 2/7/2018 Partial Approval GREGORY POMISH
Light Gage Steel Frame 2/9/2018 Partial Approval GREGORY POMISH
Drywall Nailing 2/14/2018 Partial Approval GREGORY POMISH
Light Gage Steel Frame 2/14/2018 Partial Approval GREGORY POMISH
Light Gage Steel Frame 2/16/2018 Partial Approval GREGORY POMISH
Drywall Nailing 2/21/2018 Partial Approval GREGORY POMISH
Insulation 2/21/2018 Partial Approval GREGORY POMISH
Light Gage Steel Frame 2/21/2018 Partial Approval GREGORY POMISH
Light Gage Steel Frame 2/27/2018 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 3/2/2018 Approved GREGORY POMISH
Drywall Nailing 3/6/2018 Partial Approval GREGORY POMISH
Light Gage Steel Frame 3/6/2018 Partial Approval GREGORY POMISH
Footing/Foundation/Slab 3/7/2018 Partial Approval GREGORY POMISH
Drywall Nailing 3/13/2018 Partial Approval GREGORY POMISH
Interior/Exterior Lathing 3/13/2018 Partial Approval GREGORY POMISH
Light Gage Steel Frame 3/13/2018 Partial Approval GREGORY POMISH
Interior/Exterior Lathing 3/19/2018 Partial Approval GREGORY POMISH
Drywall Nailing 3/27/2018 Approved GREGORY POMISH
Final 3/27/2018 Not Ready for Inspection GREGORY POMISH
Footing/Foundation/Slab 3/27/2018 Approved GREGORY POMISH
Green Building Final 3/27/2018 Not Ready for Inspection GREGORY POMISH
Reinforced Concrete Frame 3/27/2018 Approved GREGORY POMISH
SGSOV-Seismic Gas S/O Valve 3/27/2018 SGSOV Approved GREGORY POMISH
Smoke Detectors 3/27/2018 Approved GREGORY POMISH
Light Gage Steel Frame 4/2/2018 Partial Approval GREGORY POMISH
Final 4/10/2018 Partial Approval GREGORY POMISH
Green Building Final 4/10/2018 Partial Approval GREGORY POMISH
Special/Order Compliance 4/19/2018 Partial Approval GREGORY POMISH
Final 5/3/2018 Partial Inspection GREGORY POMISH
Green Building Final 5/3/2018 Not Ready for Inspection GREGORY POMISH
Special/Order Compliance 9/25/2018 Not Ready for Inspection GREGORY POMISH