Deputy Steel/Welding
|
10/21/2016
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Steel/Welding
|
10/24/2016
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Drilled-In Anchors
|
10/26/2016
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Steel/Welding
|
2/15/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
4/19/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Methane Barrier
|
5/4/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Methane Barrier
|
5/5/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Methane Barrier
|
5/9/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Methane Barrier
|
5/10/2017
|
Conditional Approval
|
GREGORY POMISH
|
Footing/Foundation/Slab
|
5/10/2017
|
Partial Inspection
|
GREGORY POMISH
|
METHANE-Barrier
|
5/10/2017
|
Partial Approval
|
GREGORY POMISH
|
METHANE-Subgrade
|
5/10/2017
|
Partial Inspection
|
GREGORY POMISH
|
Deputy Methane Barrier
|
5/11/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
5/11/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Methane Barrier
|
5/12/2017
|
Conditional Approval
|
GREGORY POMISH
|
Footing/Foundation/Slab
|
5/15/2017
|
Partial Approval
|
GREGORY POMISH
|
METHANE-Barrier
|
5/15/2017
|
Partial Inspection
|
GREGORY POMISH
|
METHANE-Subgrade
|
5/15/2017
|
Partial Inspection
|
GREGORY POMISH
|
Deputy Shotcrete
|
5/16/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
5/17/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
5/19/2017
|
No Access for Inspection
|
JEFFREY FULTON
|
Deputy Reinf. Concrete
|
5/22/2017
|
Conditional Approval
|
GREGORY POMISH
|
METHANE-Barrier
|
5/22/2017
|
Partial Inspection
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
5/23/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
5/24/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
5/25/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
5/26/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
5/30/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
5/31/2017
|
Conditional Approval
|
GREGORY POMISH
|
Footing/Foundation/Slab
|
5/31/2017
|
Partial Approval
|
GREGORY POMISH
|
METHANE-Barrier
|
5/31/2017
|
Partial Inspection
|
GREGORY POMISH
|
METHANE-Subgrade
|
5/31/2017
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
6/1/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
6/2/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
6/5/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
6/6/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
6/7/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
6/8/2017
|
Conditional Approval
|
GREGORY POMISH
|
Footing/Foundation/Slab
|
6/8/2017
|
Partial Approval
|
GREGORY POMISH
|
METHANE-Barrier
|
6/8/2017
|
Partial Inspection
|
GREGORY POMISH
|
METHANE-Subgrade
|
6/8/2017
|
Partial Inspection
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
6/9/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
6/19/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
6/20/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
6/21/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
6/22/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
6/23/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
6/26/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
6/27/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Methane Barrier
|
6/28/2017
|
Conditional Approval
|
GREGORY POMISH
|
Green Building Rough
|
6/28/2017
|
Not Ready for Inspection
|
WILLIAM ROSE
|
METHANE-Rough
|
6/28/2017
|
Partial Inspection
|
GREGORY POMISH
|
Reinforced Concrete Frame
|
6/28/2017
|
Partial Inspection
|
GREGORY POMISH
|
Verify Sprinkler Sign Off
|
6/28/2017
|
Not Ready for Inspection
|
GREGORY POMISH
|
Deputy Methane Barrier
|
6/29/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
6/29/2017
|
Conditional Approval
|
GREGORY POMISH
|
Footing/Foundation/Slab
|
6/29/2017
|
Corrections Issued
|
GREGORY POMISH
|
METHANE-Barrier
|
6/29/2017
|
Partial Inspection
|
GREGORY POMISH
|
METHANE-Subgrade
|
6/29/2017
|
Partial Inspection
|
GREGORY POMISH
|
Deputy Methane Barrier
|
6/30/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Methane Barrier
|
7/3/2017
|
No Access for Inspection
|
ERNESTO CORRAL
|
Deputy Methane Barrier
|
7/5/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
7/5/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
7/5/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Methane Barrier
|
7/6/2017
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
7/6/2017
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Shotcrete
|
7/6/2017
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Methane Barrier
|
7/7/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
7/7/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
7/7/2017
|
Conditional Approval
|
GREGORY POMISH
|
METHANE-Rough
|
7/7/2017
|
Partial Inspection
|
GREGORY POMISH
|
Reinforced Concrete Frame
|
7/7/2017
|
Not Ready for Inspection
|
GREGORY POMISH
|
Verify Sprinkler Sign Off
|
7/7/2017
|
Partial Inspection
|
GREGORY POMISH
|
Deputy Shotcrete
|
7/10/2017
|
Conditional Approval
|
GREGORY POMISH
|
Footing/Foundation/Slab
|
7/10/2017
|
Not Ready for Inspection
|
GREGORY POMISH
|
METHANE-Barrier
|
7/10/2017
|
Partial Inspection
|
GREGORY POMISH
|
METHANE-Subgrade
|
7/10/2017
|
Not Ready for Inspection
|
GREGORY POMISH
|
Deputy Shotcrete
|
7/11/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Methane Barrier
|
7/12/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
7/12/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Methane Barrier
|
7/13/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Methane Barrier
|
7/14/2017
|
Conditional Approval
|
GREGORY POMISH
|
METHANE-Rough
|
7/14/2017
|
Partial Inspection
|
GREGORY POMISH
|
Reinforced Concrete Frame
|
7/14/2017
|
Partial Approval
|
GREGORY POMISH
|
Verify Sprinkler Sign Off
|
7/14/2017
|
Not Ready for Inspection
|
GREGORY POMISH
|
Deputy Methane Barrier
|
7/17/2017
|
Approved
|
SAKO AGHAZARIAN
|
Deputy Reinf. Concrete
|
7/17/2017
|
Approved
|
SAKO AGHAZARIAN
|
Deputy Shotcrete
|
7/17/2017
|
Approved
|
SAKO AGHAZARIAN
|
Deputy Methane Barrier
|
7/18/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
7/18/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
7/19/2017
|
Conditional Approval
|
GREGORY POMISH
|
Footing/Foundation/Slab
|
7/19/2017
|
Partial Approval
|
GREGORY POMISH
|
METHANE-Barrier
|
7/19/2017
|
Approved
|
GREGORY POMISH
|
METHANE-Subgrade
|
7/19/2017
|
Approved
|
GREGORY POMISH
|
Deputy Methane Barrier
|
7/20/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Methane Barrier
|
7/21/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
7/21/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
7/24/2017
|
Conditional Approval
|
GREGORY POMISH
|
METHANE-Rough
|
7/24/2017
|
Not Ready for Inspection
|
GREGORY POMISH
|
Reinforced Concrete Frame
|
7/24/2017
|
Partial Approval
|
GREGORY POMISH
|
Verify Sprinkler Sign Off
|
7/24/2017
|
Not Ready for Inspection
|
GREGORY POMISH
|
Deputy Shotcrete
|
7/25/2017
|
Conditional Approval
|
GREGORY POMISH
|
Footing/Foundation/Slab
|
7/25/2017
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
7/31/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
8/1/2017
|
Conditional Approval
|
GREGORY POMISH
|
Footing/Foundation/Slab
|
8/1/2017
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
8/2/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
8/3/2017
|
Conditional Approval
|
GREGORY POMISH
|
METHANE-Rough
|
8/3/2017
|
Partial Inspection
|
GREGORY POMISH
|
Reinforced Concrete Frame
|
8/3/2017
|
Not Ready for Inspection
|
GREGORY POMISH
|
Verify Sprinkler Sign Off
|
8/3/2017
|
Partial Inspection
|
GREGORY POMISH
|
Deputy Shotcrete
|
8/4/2017
|
Approved
|
SAKO AGHAZARIAN
|
Footing/Foundation/Slab
|
8/4/2017
|
Partial Approval
|
SAKO AGHAZARIAN
|
Deputy Reinf. Concrete
|
8/8/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
8/8/2017
|
Conditional Approval
|
GREGORY POMISH
|
Green Building Rough
|
8/8/2017
|
Not Ready for Inspection
|
WILLIAM ROSE
|
METHANE-Rough
|
8/8/2017
|
Not Ready for Inspection
|
GREGORY POMISH
|
Reinforced Concrete Frame
|
8/8/2017
|
Not Ready for Inspection
|
GREGORY POMISH
|
Verify Sprinkler Sign Off
|
8/8/2017
|
Not Ready for Inspection
|
GREGORY POMISH
|
Deputy Shotcrete
|
8/9/2017
|
Conditional Approval
|
GREGORY POMISH
|
Footing/Foundation/Slab
|
8/9/2017
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
8/10/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
8/11/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
8/11/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
8/14/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
8/15/2017
|
Conditional Approval
|
GREGORY POMISH
|
METHANE-Rough
|
8/15/2017
|
Not Ready for Inspection
|
GREGORY POMISH
|
Reinforced Concrete Frame
|
8/15/2017
|
Partial Approval
|
GREGORY POMISH
|
Verify Sprinkler Sign Off
|
8/15/2017
|
Not Ready for Inspection
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
8/16/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
8/17/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
8/17/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
8/18/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
8/18/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
8/22/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
8/24/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
8/25/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
8/28/2017
|
Conditional Approval
|
GREGORY POMISH
|
Footing/Foundation/Slab
|
8/29/2017
|
Not Ready for Inspection
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
8/30/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
9/5/2017
|
Conditional Approval
|
GREGORY POMISH
|
Footing/Foundation/Slab
|
9/5/2017
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
9/6/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
9/7/2017
|
Conditional Approval
|
GREGORY POMISH
|
METHANE-Rough
|
9/7/2017
|
Approved
|
GREGORY POMISH
|
Reinforced Concrete Frame
|
9/7/2017
|
Partial Approval
|
GREGORY POMISH
|
Verify Sprinkler Sign Off
|
9/7/2017
|
Not Ready for Inspection
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
9/8/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
9/11/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
9/12/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
9/13/2017
|
Approved
|
SAKO AGHAZARIAN
|
Reinforced Concrete Frame
|
9/13/2017
|
Partial Approval
|
SAKO AGHAZARIAN
|
Verify Sprinkler Sign Off
|
9/13/2017
|
Approved
|
SAKO AGHAZARIAN
|
Footing/Foundation/Slab
|
9/14/2017
|
Partial Inspection
|
SAKO AGHAZARIAN
|
Deputy Reinf. Concrete
|
9/15/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
9/15/2017
|
Conditional Approval
|
GREGORY POMISH
|
Footing/Foundation/Slab
|
9/18/2017
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
9/19/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
9/19/2017
|
Conditional Approval
|
GREGORY POMISH
|
Green Building Rough
|
9/19/2017
|
Not Ready for Inspection
|
WILLIAM ROSE
|
Reinforced Concrete Frame
|
9/19/2017
|
Not Ready for Inspection
|
GREGORY POMISH
|
Deputy Shotcrete
|
9/20/2017
|
Conditional Approval
|
GREGORY POMISH
|
Footing/Foundation/Slab
|
9/20/2017
|
Not Ready for Inspection
|
GREGORY POMISH
|
Deputy Shotcrete
|
9/21/2017
|
Conditional Approval
|
GREGORY POMISH
|
Reinforced Concrete Frame
|
9/21/2017
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
9/22/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
9/26/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
9/27/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
9/28/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
9/29/2017
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Pre-Stress Concrete
|
10/2/2017
|
Conditional Approval
|
GREGORY POMISH
|
Footing/Foundation/Slab
|
10/2/2017
|
Partial Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
10/3/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
10/3/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
10/4/2017
|
Conditional Approval
|
GREGORY POMISH
|
Green Building Rough
|
10/5/2017
|
Not Ready for Inspection
|
WILLIAM ROSE
|
Reinforced Concrete Frame
|
10/5/2017
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
10/6/2017
|
Conditional Approval
|
GREGORY POMISH
|
Footing/Foundation/Slab
|
10/9/2017
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
10/10/2017
|
Conditional Approval
|
GREGORY POMISH
|
Green Building Rough
|
10/10/2017
|
Not Ready for Inspection
|
WILLIAM ROSE
|
Reinforced Concrete Frame
|
10/10/2017
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
10/11/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
10/11/2017
|
Conditional Approval
|
GREGORY POMISH
|
Footing/Foundation/Slab
|
10/11/2017
|
Partial Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
10/12/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
10/13/2017
|
Conditional Approval
|
GREGORY POMISH
|
Reinforced Concrete Frame
|
10/16/2017
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
10/18/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
10/23/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
10/23/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
10/24/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
10/25/2017
|
Conditional Approval
|
GREGORY POMISH
|
Footing/Foundation/Slab
|
10/25/2017
|
Partial Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
10/26/2017
|
Conditional Approval
|
GREGORY POMISH
|
Footing/Foundation/Slab
|
10/27/2017
|
Partial Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
10/30/2017
|
Conditional Approval
|
GREGORY POMISH
|
Reinforced Concrete Frame
|
10/30/2017
|
Partial Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
10/31/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
11/1/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
11/1/2017
|
Conditional Approval
|
GREGORY POMISH
|
Green Building Rough
|
11/1/2017
|
Not Ready for Inspection
|
GREGORY POMISH
|
Reinforced Concrete Frame
|
11/1/2017
|
Partial Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
11/2/2017
|
Conditional Approval
|
GREGORY POMISH
|
Footing/Foundation/Slab
|
11/2/2017
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
11/3/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
11/3/2017
|
Conditional Approval
|
GREGORY POMISH
|
Green Building Rough
|
11/3/2017
|
Not Ready for Inspection
|
GREGORY POMISH
|
Reinforced Concrete Frame
|
11/3/2017
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
11/6/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
11/6/2017
|
Conditional Approval
|
GREGORY POMISH
|
Footing/Foundation/Slab
|
11/6/2017
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
11/7/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
11/7/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
11/8/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
11/17/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
11/20/2017
|
Conditional Approval
|
JEFFREY FULTON
|
Footing/Foundation/Slab
|
11/20/2017
|
Partial Inspection
|
JEFFREY FULTON
|
Deputy Reinf. Concrete
|
11/21/2017
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Pre-Stress Concrete
|
11/28/2017
|
Conditional Approval
|
GREGORY POMISH
|
Green Building Rough
|
11/28/2017
|
Partial Inspection
|
GREGORY POMISH
|
Reinforced Concrete Frame
|
11/28/2017
|
Partial Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
11/29/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
11/29/2017
|
Conditional Approval
|
GREGORY POMISH
|
Footing/Foundation/Slab
|
11/29/2017
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
11/30/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
11/30/2017
|
Conditional Approval
|
GREGORY POMISH
|
Green Building Rough
|
11/30/2017
|
Not Ready for Inspection
|
GREGORY POMISH
|
Reinforced Concrete Frame
|
11/30/2017
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
12/1/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
12/1/2017
|
Conditional Approval
|
GREGORY POMISH
|
Footing/Foundation/Slab
|
12/1/2017
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
12/5/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
12/5/2017
|
Conditional Approval
|
GREGORY POMISH
|
Green Building Rough
|
12/5/2017
|
Not Ready for Inspection
|
GREGORY POMISH
|
Reinforced Concrete Frame
|
12/5/2017
|
Partial Approval
|
GREGORY POMISH
|
Deputy Steel/Welding
|
12/6/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Steel/Welding
|
12/11/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Steel/Welding
|
12/12/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
12/14/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
12/15/2017
|
Conditional Approval
|
GREGORY POMISH
|
Footing/Foundation/Slab
|
12/15/2017
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
12/18/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
12/19/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
12/20/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
12/21/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
12/22/2017
|
Conditional Approval
|
GREGORY POMISH
|
Footing/Foundation/Slab
|
12/22/2017
|
Not Ready for Inspection
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
12/26/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Steel/Welding
|
12/26/2017
|
Conditional Approval
|
GREGORY POMISH
|
Green Building Rough
|
12/26/2017
|
Not Ready for Inspection
|
GREGORY POMISH
|
Reinforced Concrete Frame
|
12/26/2017
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
12/27/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
12/27/2017
|
Conditional Approval
|
GREGORY POMISH
|
Footing/Foundation/Slab
|
12/27/2017
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
12/28/2017
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
12/29/2017
|
Conditional Approval
|
DAVID BURKHEAD
|
Deputy Shotcrete
|
1/2/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
Green Building Rough
|
1/2/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
Reinforced Concrete Frame
|
1/2/2018
|
Partial Approval
|
DAVID BURKHEAD
|
Deputy Shotcrete
|
1/3/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
1/4/2018
|
Conditional Approval
|
GREGORY POMISH
|
Green Building Rough
|
1/4/2018
|
Partial Inspection
|
GREGORY POMISH
|
Reinforced Concrete Frame
|
1/4/2018
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
1/8/2018
|
Conditional Approval
|
GREGORY POMISH
|
Reinforced Masonry Frame
|
1/10/2018
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
1/11/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
1/12/2018
|
Conditional Approval
|
GREGORY POMISH
|
Footing/Foundation/Slab
|
1/16/2018
|
Partial Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
1/19/2018
|
Conditional Approval
|
GREGORY POMISH
|
Green Building Rough
|
1/19/2018
|
Not Ready for Inspection
|
GREGORY POMISH
|
Reinforced Concrete Frame
|
1/19/2018
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
1/22/2018
|
Conditional Approval
|
GREGORY POMISH
|
Footing/Foundation/Slab
|
1/22/2018
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
1/23/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
1/24/2018
|
Conditional Approval
|
GREGORY POMISH
|
Green Building Rough
|
1/24/2018
|
Not Ready for Inspection
|
GREGORY POMISH
|
Reinforced Concrete Frame
|
1/24/2018
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
1/25/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
1/26/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
1/26/2018
|
Conditional Approval
|
GREGORY POMISH
|
Green Building Rough
|
1/30/2018
|
Not Ready for Inspection
|
GREGORY POMISH
|
Reinforced Concrete Frame
|
1/30/2018
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
1/31/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
1/31/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
2/1/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
2/8/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
2/9/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
2/12/2018
|
Conditional Approval
|
GREGORY POMISH
|
Footing/Foundation/Slab
|
2/12/2018
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
2/13/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
2/14/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
2/14/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
2/15/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
2/16/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
2/16/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Masonry
|
2/16/2018
|
Conditional Approval
|
GREGORY POMISH
|
Reinforced Masonry Frame
|
2/16/2018
|
Partial Approval
|
GREGORY POMISH
|
Footing/Foundation/Slab
|
2/17/2018
|
Partial Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
2/20/2018
|
Conditional Approval
|
GREGORY POMISH
|
Green Building Rough
|
2/20/2018
|
Not Ready for Inspection
|
GREGORY POMISH
|
Reinforced Concrete Frame
|
2/20/2018
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
2/21/2018
|
Conditional Approval
|
GREGORY POMISH
|
Footing/Foundation/Slab
|
2/21/2018
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
2/22/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
2/22/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
2/23/2018
|
Conditional Approval
|
GREGORY POMISH
|
Green Building Rough
|
2/26/2018
|
Not Ready for Inspection
|
ERNESTO CORRAL
|
Reinforced Concrete Frame
|
2/26/2018
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Shotcrete
|
2/27/2018
|
Partial Approval
|
JAMES POWERS
|
Footing/Foundation/Slab
|
2/27/2018
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
2/28/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Other (see comments)
|
3/9/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Masonry
|
3/9/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
3/12/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Drilled-In Anchors
|
3/13/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
3/13/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Masonry
|
3/13/2018
|
Conditional Approval
|
GREGORY POMISH
|
Footing/Foundation/Slab
|
3/13/2018
|
Partial Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
3/14/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
3/14/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
3/15/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
3/19/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Masonry
|
3/19/2018
|
Conditional Approval
|
GREGORY POMISH
|
Footing/Foundation/Slab
|
3/19/2018
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
3/20/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
3/21/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
3/21/2018
|
Conditional Approval
|
GREGORY POMISH
|
Green Building Rough
|
3/21/2018
|
Approved
|
GREGORY POMISH
|
Reinforced Concrete Frame
|
3/21/2018
|
Partial Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
3/23/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
3/27/2018
|
Conditional Approval
|
GREGORY POMISH
|
Reinforced Concrete Frame
|
3/28/2018
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
4/2/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Drilled-In Anchors
|
4/4/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Steel/Welding
|
4/4/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Drilled-In Anchors
|
4/5/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
4/5/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
4/10/2018
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
4/11/2018
|
Conditional Approval
|
GREGORY POMISH
|
Footing/Foundation/Slab
|
4/11/2018
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
4/12/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
4/16/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
4/17/2018
|
Conditional Approval
|
GREGORY POMISH
|
Footing/Foundation/Slab
|
4/17/2018
|
Partial Approval
|
GREGORY POMISH
|
Deputy Pre-Stress Concrete
|
4/18/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
4/18/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
4/20/2018
|
Approved
|
JEFF BYTHEWAY
|
Reinforced Concrete Frame
|
4/20/2018
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
4/25/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Shotcrete
|
4/25/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Steel/Welding
|
4/26/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Steel/Welding
|
4/27/2018
|
Conditional Approval
|
GREGORY POMISH
|
Footing/Foundation/Slab
|
5/2/2018
|
Not Ready for Inspection
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
5/3/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Masonry
|
5/3/2018
|
Conditional Approval
|
GREGORY POMISH
|
Reinforced Concrete Frame
|
5/3/2018
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
5/4/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Steel/Welding
|
5/7/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
5/8/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Other (see comments)
|
5/10/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Masonry
|
5/10/2018
|
Conditional Approval
|
GREGORY POMISH
|
Reinforced Masonry Frame
|
5/10/2018
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Masonry
|
5/15/2018
|
Conditional Approval
|
GREGORY POMISH
|
Reinforced Masonry Frame
|
5/18/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
Deputy Reinf. Masonry
|
5/21/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Steel/Welding
|
5/23/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Steel/Welding
|
5/25/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Masonry
|
5/30/2018
|
Conditional Approval
|
GREGORY POMISH
|
Light Gage Steel Frame
|
6/25/2018
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Masonry
|
6/29/2018
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Reinf. Masonry
|
7/2/2018
|
Conditional Approval
|
GREGORY POMISH
|
Drywall Nailing
|
7/11/2018
|
Partial Approval
|
GREGORY POMISH
|
Light Gage Steel Frame
|
7/11/2018
|
Partial Approval
|
GREGORY POMISH
|
Drywall Nailing
|
7/16/2018
|
Partial Approval
|
GREGORY POMISH
|
Light Gage Steel Frame
|
7/16/2018
|
Partial Inspection
|
GREGORY POMISH
|
Light Gage Steel Frame
|
7/23/2018
|
Not Ready for Inspection
|
GREGORY POMISH
|
Light Gage Steel Frame
|
10/23/2018
|
Partial Approval
|
GREGORY POMISH
|
Deputy Drilled-In Anchors
|
1/8/2019
|
Approved
|
GREGORY POMISH
|
Deputy Drilled-In Anchors
|
1/9/2019
|
Approved
|
GREGORY POMISH
|
Deputy Reinf. Masonry
|
1/11/2019
|
Approved
|
GREGORY POMISH
|
Deputy Reinf. Masonry
|
1/14/2019
|
Approved
|
GREGORY POMISH
|
Final
|
1/29/2019
|
Not Ready for Inspection
|
GREGORY POMISH
|
Footing/Foundation/Slab
|
1/29/2019
|
Approved
|
GREGORY POMISH
|
Green Building Final
|
1/29/2019
|
Not Ready for Inspection
|
GREGORY POMISH
|
Reinforced Concrete Frame
|
1/29/2019
|
Approved
|
GREGORY POMISH
|
SGSOV-Seismic Gas S/O Valve
|
1/29/2019
|
SGSOV Approved
|
GREGORY POMISH
|
Smoke Detectors
|
1/29/2019
|
Not Ready for Inspection
|
GREGORY POMISH
|
Final
|
2/26/2019
|
Partial Inspection
|
GREGORY POMISH
|
Green Building Final
|
2/26/2019
|
Not Ready for Inspection
|
GREGORY POMISH
|
Smoke Detectors
|
2/26/2019
|
Not Ready for Inspection
|
GREGORY POMISH
|
Final
|
3/8/2019
|
Not Ready for Inspection
|
GREGORY POMISH
|
Green Building Final
|
3/8/2019
|
Not Ready for Inspection
|
GREGORY POMISH
|
Smoke Detectors
|
3/8/2019
|
Not Ready for Inspection
|
GREGORY POMISH
|
Floor/Roof Diaphrgm/Shear Wall
|
3/21/2019
|
Partial Inspection
|
GREGORY POMISH
|
Final
|
5/1/2019
|
Not Ready for Inspection
|
HAMID PISHEHVAR
|
Green Building Final
|
5/1/2019
|
Not Ready for Inspection
|
HAMID PISHEHVAR
|
Smoke Detectors
|
5/1/2019
|
Not Ready for Inspection
|
HAMID PISHEHVAR
|
Final
|
5/10/2019
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
Green Building Final
|
5/10/2019
|
Approved
|
JEFF BYTHEWAY
|
Smoke Detectors
|
5/10/2019
|
Approved
|
JEFF BYTHEWAY
|
Final
|
5/21/2019
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
Final
|
5/22/2019
|
OK to Issue CofO
|
JEFF BYTHEWAY
|