6401 W WILSHIRE BLVD 90048

Certificate Information: 6401 W WILSHIRE BLVD 90048

Application / Permit
15010-10006-00777
Plan Check / Job No.
B18LA14794
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
REVISIONS TO UNIT LAYOUTS. UNIT COUNTS & PARKING COUNTS WILL REMAIN THE SAME. STRUCTURAL CHANGES TO ADD (N) ELEVATOR AND MINOR RELOCATION OF COLUMNS TO ACCOMODATE UNIT LAYOUTS. SUPPLEMENTAL TO PERMIT #: 15010-10000-00777 (Permit valuation captured in permit 15010-10000-00777, no change in permit valuation)
Permit Issued
Issued on 2/19/2019
Issuing Office
Metro
Current Status
Issued on 2/19/2019
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 8/20/2018 APPLICANT
Assigned to Plan Check Engineer 8/29/2018 SUEN LIEU
Corrections Issued 9/6/2018 SUEN LIEU
Quality Review Completed 9/11/2018 CHARLES CHANG
Building Plans Picked Up 9/11/2018 APPLICANT
Disabled Access Plans Picked Up 9/11/2018 APPLICANT
Green Plans Picked Up 9/11/2018 APPLICANT
Applicant returned to address corrections 10/16/2018 SUEN LIEU
Applicant returned to address corrections 1/24/2019 SUEN LIEU
Applicant returned to address corrections 1/31/2019 SUEN LIEU
Plan Check Approved 2/14/2019 SUEN LIEU
Issued 2/19/2019 LADBS

Permit Application Clearance Information

"D" conditions Cleared 11/6/2018 IVORY CHAMBESHI
"Q" conditions Cleared 11/6/2018 IVORY CHAMBESHI
Eng Process Fee Ord 176,300 Cleared 11/6/2018 ROBYN STEELE
Sewer availability Cleared 11/6/2018 ADRIAN SANCHEZ
Tract Map conditions Cleared 11/6/2018 IVORY CHAMBESHI
ZI Cleared 11/6/2018 IVORY CHAMBESHI
Fire Marshall Fire Life Safety Cleared 2/5/2019 DOMINIQUE MEDINA
Green Code Cleared 2/5/2019 DONALD CRICHLOW
DAS Clearance Cleared 2/6/2019 SUEN LIEU
Site Plan review Cleared 2/6/2019 DANALYNN DOMINGUEZ
ZA Case Cleared 2/6/2019 DANALYNN DOMINGUEZ

Contact Information

Architect Hart, David Curtis; Lic. No.: C26391 16127 ALCIMA AVENUE      PACIFIC PALISADES, CA 90272
Contractor Gilbane Building Company; Lic. No.: 777701-B 1798 TECHNOLOGY DRIVE STE 120      SAN JOSE, CA 95110
Engineer Conaway, Johnny Ray; Lic. No.: C19689 PO BOX 155      OAK VIEW, CA 93022
Engineer Halseth, John Wayne; Lic. No.: C82559 2121 TOWNE CENTRE PL   STE 300    ANAHEIM, CA 92806
Engineer Powers, Brian Frederick; Lic. No.: C75902 2090 WEST 31ST STREET      LOS ANGELES, CA 90018
Engineer Wilkerson, Ryan Lee; Lic. No.: S4728 20734 SARDINIA WAY      PORTER RANCH, CA 91326
Engineer Zadoorian, Christopher John; Lic. No.: GE2493 2121 S TOWNE CENTRE PLACE SUITE 130      ANAHEIM, CA 92806
Landscape Architect Scott, Baker; Lic. No.: LA6063 8022 NARDIAN WAY      LOS ANGELES, CA 90045

Inspector Information

EDWIN GREGORYONA, (213) 482-7357 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 10/24/2019 Partial Inspection DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/12/2020 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 2/12/2020 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 4/20/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/20/2020 Conditional Approval LARRY ARNICK
Deputy Shotcrete 4/20/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 4/21/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/21/2020 Conditional Approval LARRY ARNICK
Deputy Shotcrete 4/21/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 4/22/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/22/2020 Conditional Approval LARRY ARNICK
Deputy Shotcrete 4/22/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 4/23/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/23/2020 Conditional Approval LARRY ARNICK
Deputy Shotcrete 4/23/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 4/24/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/24/2020 Conditional Approval LARRY ARNICK
Deputy Shotcrete 4/24/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 4/28/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 4/28/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/28/2020 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 4/28/2020 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 4/29/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 4/29/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/29/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 4/30/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 4/30/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/30/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 5/1/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 5/1/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/1/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 5/4/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 5/4/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/4/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 5/5/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/5/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 5/6/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/6/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 5/7/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/7/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 5/8/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/8/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 5/14/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 5/14/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/14/2020 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 5/14/2020 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 5/15/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 5/15/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/15/2020 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 5/15/2020 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 5/18/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 5/18/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/18/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 5/19/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 5/19/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/19/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 5/20/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 5/20/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/20/2020 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 5/21/2020 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 5/22/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 5/22/2020 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/26/2020 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 5/26/2020 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 5/27/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/28/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/29/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 6/1/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/2/2020 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 6/2/2020 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 6/3/2020 Conditional Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 6/3/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 6/4/2020 Conditional Approval JONATHAN QUACH
Deputy Reinf. Concrete 6/5/2020 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 6/5/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Drilled-In Anchors 6/8/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 6/8/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 6/8/2020 Conditional Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 6/8/2020 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 6/9/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 6/9/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 6/9/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 6/10/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 6/10/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 6/10/2020 Conditional Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 6/10/2020 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 6/11/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 6/11/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 6/11/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 6/12/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 6/12/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 6/12/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 6/15/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/16/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 6/17/2020 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 6/17/2020 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 6/18/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 6/18/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 6/19/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 6/19/2020 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 6/19/2020 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 6/22/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 6/22/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 6/23/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 6/23/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 6/23/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 6/24/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 6/24/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 6/24/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 6/25/2020 Conditional Approval JONATHAN QUACH
Deputy Pre-Stress Concrete 6/25/2020 Conditional Approval JONATHAN QUACH
Deputy Reinf. Concrete 6/25/2020 Conditional Approval JONATHAN QUACH
Deputy Drilled-In Anchors 6/26/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 6/26/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 6/26/2020 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 6/26/2020 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 6/29/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 6/29/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 6/29/2020 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 7/1/2020 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 7/2/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 7/2/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/2/2020 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 7/2/2020 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 7/6/2020 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 7/6/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/6/2020 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 7/7/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 7/7/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/7/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 7/8/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 7/8/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/8/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 7/9/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 7/9/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/9/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 7/10/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 7/10/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/10/2020 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 7/10/2020 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 7/13/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 7/13/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/13/2020 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 7/13/2020 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 7/14/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 7/14/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/14/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 7/15/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 7/15/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/15/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 7/16/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 7/16/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/16/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/17/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 7/22/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 7/22/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/22/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 7/23/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 7/23/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/23/2020 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 7/23/2020 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 7/24/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 7/24/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/24/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 7/27/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 7/27/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/27/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 7/28/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 7/28/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/28/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/29/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 7/30/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 7/30/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/30/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 7/31/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 7/31/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/31/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 8/3/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 8/3/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/3/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 8/5/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 8/5/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/5/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 8/7/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/7/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 8/10/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/10/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 8/11/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/11/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 8/12/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/12/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 8/13/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/13/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 8/14/2020 Conditional Approval JONATHAN QUACH
Deputy Reinf. Concrete 8/14/2020 Conditional Approval JONATHAN QUACH
Deputy Pre-Stress Concrete 8/17/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/17/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 8/18/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/18/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 8/19/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/19/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 8/20/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/20/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 8/21/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/21/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 8/24/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/24/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 8/25/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/25/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 8/26/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 8/26/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/26/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 8/27/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 8/27/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/27/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 8/28/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 8/28/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/28/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 8/31/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 8/31/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/31/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 9/1/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 9/1/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/1/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/2/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/4/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 9/11/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/11/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 9/14/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/14/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 9/15/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/15/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 9/16/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/16/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 9/17/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/17/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 9/23/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 9/23/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/23/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 9/23/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 9/24/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 9/24/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/24/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 9/24/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 9/25/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 9/25/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/25/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 9/25/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 9/28/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 9/28/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/28/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 9/28/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 9/29/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 9/29/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/29/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 9/29/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 9/30/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/30/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 9/30/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 10/1/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/1/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 10/1/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 10/2/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/2/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 10/2/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 10/5/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/5/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 10/5/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 10/6/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/6/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 10/6/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 10/7/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/7/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 10/7/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 10/8/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/8/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 10/8/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 10/9/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/9/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 10/9/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 10/13/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 10/13/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/13/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 10/13/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 10/14/2020 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 10/14/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 10/14/2020 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 10/14/2020 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 10/15/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 10/15/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/15/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 10/15/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 10/16/2020 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 10/16/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/16/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 10/16/2020 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 10/19/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 10/19/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/19/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 10/19/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 10/20/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/20/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 10/20/2020 Conditional Approval LARRY ARNICK
Masonry Wall/Backfill 10/21/2020 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 10/22/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 10/22/2020 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 10/22/2020 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 10/23/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 10/23/2020 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 10/23/2020 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 10/26/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 10/26/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 10/27/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 10/27/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 10/28/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 10/28/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 10/28/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 10/29/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/29/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 10/29/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 10/29/2020 Conditional Approval LARRY ARNICK
Reinforced Masonry Frame 10/29/2020 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 10/30/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/30/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 10/30/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 10/30/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 11/2/2020 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 11/2/2020 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 11/2/2020 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 11/4/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 11/4/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 11/4/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 11/4/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 11/5/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 11/5/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 11/5/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 11/5/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 11/6/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 11/6/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 11/6/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 11/6/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 11/9/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 11/9/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 11/9/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 11/9/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 11/10/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 11/10/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 11/10/2020 Conditional Approval LARRY ARNICK
Reinforced Concrete Frame 11/10/2020 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 11/13/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/13/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 11/13/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 11/13/2020 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 11/16/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/16/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 11/16/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 11/16/2020 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 11/17/2020 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 11/17/2020 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 11/17/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 11/17/2020 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 11/18/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/18/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 11/18/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 11/18/2020 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 11/19/2020 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 11/19/2020 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 11/19/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 11/19/2020 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 11/19/2020 Not Ready for Inspection EDWIN GREGORYONA
Deputy Drilled-In Anchors 11/20/2020 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 11/20/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 11/20/2020 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 11/20/2020 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 11/23/2020 Partial Approval EDWIN GREGORYONA
Deputy Pre-Stress Concrete 11/23/2020 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 11/23/2020 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 11/23/2020 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 11/24/2020 Partial Approval EDWIN GREGORYONA
Deputy Pre-Stress Concrete 11/24/2020 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 11/24/2020 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 11/24/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 11/24/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 11/25/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 11/30/2020 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 12/1/2020 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 12/1/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 12/1/2020 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 12/1/2020 Conditional Approval NICK DANERI
Deputy Steel/Welding 12/1/2020 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 12/2/2020 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 12/2/2020 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 12/2/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 12/2/2020 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 12/3/2020 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 12/3/2020 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 12/3/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 12/3/2020 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 12/4/2020 Partial Approval EDWIN GREGORYONA
Deputy Pre-Stress Concrete 12/4/2020 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 12/4/2020 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 12/4/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 12/4/2020 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 12/7/2020 Partial Approval EDWIN GREGORYONA
Deputy Pre-Stress Concrete 12/7/2020 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 12/7/2020 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 12/7/2020 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 12/8/2020 Partial Approval EDWIN GREGORYONA
Deputy Pre-Stress Concrete 12/8/2020 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 12/8/2020 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 12/9/2020 Partial Approval EDWIN GREGORYONA
Deputy Pre-Stress Concrete 12/9/2020 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 12/9/2020 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 12/10/2020 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 12/10/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 12/10/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/11/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/14/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/15/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/16/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/17/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/18/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/21/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/22/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/23/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/24/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/28/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/29/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 1/14/2021 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 1/15/2021 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 1/20/2021 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 1/21/2021 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 1/22/2021 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 1/22/2021 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 1/22/2021 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 1/22/2021 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 1/25/2021 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 1/25/2021 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 1/25/2021 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 1/25/2021 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 1/26/2021 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 1/26/2021 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 1/26/2021 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 1/27/2021 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 1/27/2021 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 1/27/2021 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 1/27/2021 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 1/28/2021 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 1/28/2021 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 1/28/2021 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 1/28/2021 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 1/29/2021 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 1/29/2021 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 2/1/2021 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 2/2/2021 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 2/3/2021 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 2/4/2021 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 2/4/2021 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 2/5/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/5/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/10/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/11/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/11/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/16/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/17/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/17/2021 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 2/17/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/18/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/18/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/24/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/24/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/24/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/25/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/25/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/1/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/2/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/2/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/3/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/3/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/4/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/4/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/5/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/5/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/10/2021 Partial Approval EDWIN GREGORYONA
Deputy Pre-Stress Concrete 3/10/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/10/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/10/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/11/2021 Partial Approval EDWIN GREGORYONA
Deputy Pre-Stress Concrete 3/11/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/11/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/11/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Pre-Stress Concrete 3/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Pre-Stress Concrete 3/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/16/2021 Partial Approval EDWIN GREGORYONA
Deputy Pre-Stress Concrete 3/16/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/16/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/17/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/17/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/18/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/18/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/24/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/25/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/25/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/30/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/31/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/31/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/1/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/1/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/5/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/5/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/6/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/6/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/7/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/7/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/13/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/13/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/14/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/14/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/16/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/20/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/20/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/21/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/21/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/27/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/28/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/29/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/30/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/3/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/4/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/5/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/6/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/7/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/11/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/11/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/13/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/13/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/14/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/14/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/17/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 5/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/20/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 5/20/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/21/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 5/21/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/21/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/24/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 5/24/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/25/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 5/25/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/25/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 5/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/27/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 5/27/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/27/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/28/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 5/28/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/28/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 6/1/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Masonry 6/1/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Steel/Welding 6/2/2021 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 6/3/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 6/3/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 6/3/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 6/4/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 6/4/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 6/4/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 6/7/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 6/7/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 6/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 6/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 6/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 6/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 6/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 6/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 6/10/2021 Conditional Approval NICK DANERI
Deputy Steel/Welding 6/11/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 6/16/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 6/17/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 6/17/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Masonry 6/17/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Steel/Welding 6/17/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 6/18/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/18/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 6/18/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 6/18/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 6/21/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/21/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 6/21/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 6/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 6/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 6/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 6/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 6/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 6/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 6/24/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/24/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 6/24/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 6/24/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 6/25/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/25/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 6/25/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 6/25/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 6/28/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/28/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 6/28/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 6/29/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 6/30/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 7/1/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/2/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 7/2/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/2/2021 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 7/6/2021 Conditional Approval JONATHAN QUACH
Deputy Reinf. Masonry 7/6/2021 Conditional Approval JONATHAN QUACH
Deputy Drilled-In Anchors 7/7/2021 Conditional Approval JONATHAN QUACH
Deputy Reinf. Masonry 7/7/2021 Conditional Approval JONATHAN QUACH
Deputy Drilled-In Anchors 7/8/2021 Conditional Approval JONATHAN QUACH
Deputy Reinf. Masonry 7/8/2021 Conditional Approval JONATHAN QUACH
Deputy Steel/Welding 7/8/2021 Conditional Approval JONATHAN QUACH
Deputy Drilled-In Anchors 7/9/2021 Conditional Approval JONATHAN QUACH
Deputy Reinf. Masonry 7/9/2021 Conditional Approval JONATHAN QUACH
Deputy Steel/Welding 7/9/2021 Conditional Approval JONATHAN QUACH
Deputy Steel/Welding 7/13/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 7/14/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 7/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 7/16/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 7/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 7/20/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 7/21/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 7/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 7/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 7/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 7/28/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 7/29/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 8/3/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 8/3/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 8/4/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 8/5/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 8/6/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 8/10/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 8/11/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 8/16/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 8/18/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 8/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 8/20/2021 Partial Approval EDWIN GREGORYONA
Drywall Nailing 8/30/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 8/31/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 9/1/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 9/2/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 9/3/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 9/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 9/24/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 9/27/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 9/28/2021 Partial Approval EDWIN GREGORYONA
Drywall Nailing 9/28/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 9/29/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 9/30/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 10/1/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 10/4/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 10/5/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/5/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 10/6/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/6/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 10/7/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/7/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 10/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 10/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 10/13/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 10/14/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 10/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 10/18/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 10/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 10/21/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 10/22/2021 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 10/27/2021 Partial Approval EDWIN GREGORYONA
Drywall Nailing 11/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Other (see comments) 1/14/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 1/14/2022 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 1/27/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 2/18/2022 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 2/18/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 3/14/2022 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 4/4/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 4/14/2022 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 5/19/2022 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 5/20/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 5/26/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 6/22/2022 Not Ready for Inspection EDWIN GREGORYONA
Light Gage Steel Frame 6/22/2022 Not Ready for Inspection EDWIN GREGORYONA
Drywall Nailing 6/23/2022 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 6/23/2022 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 7/14/2022 Approved EDWIN GREGORYONA
Deputy Steel/Welding 8/9/2022 Conditional Approval WINSTON DUNNING
Drywall Nailing 8/17/2022 Not Ready for Inspection GREGORY POMISH
Drywall Nailing 8/18/2022 Not Ready for Inspection EDWIN GREGORYONA
Drywall Nailing 8/22/2022 Partial Inspection EDWIN GREGORYONA
Deputy Steel/Welding 8/24/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 11/16/2022 Conditional Approval MICHAEL ROSENBERG