400 S BROADWAY 90013

Certificate Information: 400 S BROADWAY 90013

Application / Permit
16010-10000-00347
Plan Check / Job No.
B16LA01291
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(35) Condo-Multi Family
Work Description
New 35 story mixed use building: 450 units residential condominium ,core and shell only retail, 6 levels garage above grade, and 1 level garage below grade.
Permit Issued
Issued on 5/23/2018
Issuing Office
Metro
Current Status
CofO Issued on 10/29/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 2/19/2016 APPLICANT
Assigned to Plan Check Engineer 2/25/2016 SAI KHUM
Corrections Issued 3/10/2016 SAI KHUM
Quality Review Completed 3/15/2016 CHARLES CHANG
Building Plans Picked Up 3/17/2016 APPLICANT
Applicant returned to address corrections 4/14/2016 ALLEN MANALANSAN
Applicant returned to address corrections 4/28/2016 ALLEN MANALANSAN
Applicant returned to address corrections 5/19/2016 ALLEN MANALANSAN
Applicant returned to address corrections 10/3/2016 ALLEN MANALANSAN
Applicant returned to address corrections 10/12/2016 SAI KHUM
Applicant returned to address corrections 10/20/2016 ALLEN MANALANSAN
Applicant returned to address corrections 4/12/2017 ALLEN MANALANSAN
Applicant returned to address corrections 6/22/2017 SAI KHUM
Applicant returned to address corrections 6/27/2017 SAI KHUM
Applicant returned to address corrections 7/3/2017 SAI KHUM
Applicant returned to address corrections 12/19/2017 ALLEN MANALANSAN
Plan Check Approved 5/8/2018 ALLEN MANALANSAN
Plan Check Approved 5/18/2018 ALLEN MANALANSAN
Issued 5/23/2018 LADBS
Permit Closed-Status Void 12/13/2019 LESLIE TRUJILLO
Re-Activate Permit 12/17/2019 LESLIE TRUJILLO
Permit Closed-Status Void 12/27/2019 LESLIE TRUJILLO
Re-Activate Permit 12/30/2019 LESLIE TRUJILLO
TCO Issued (Expire Date: 05-22-2021) 11/23/2020 ERNESTO CORRAL
TCO Issued (Expire Date: 11-13-2021) 5/17/2021 ERNESTO CORRAL
CofO in Progress 10/28/2021 RAFAEL ESPINOZA
Permit Finaled 10/29/2021 TED RIES
CofO Issued 10/29/2021 TED RIES
Permit Finaled 10/29/2021 TED RIES

Permit Application Clearance Information

Tract Map conditions Cleared 5/22/2017 MARITZA PRZEKOP
ZA Case Cleared 5/22/2017 MARITZA PRZEKOP
ZA Case Cleared 5/22/2017 MARITZA PRZEKOP
ZA Case Cleared 5/22/2017 MARITZA PRZEKOP
ZA Case Cleared 5/22/2017 MARITZA PRZEKOP
Address approval Cleared 5/26/2017 SEVAK ISAKHAYAN
City Hist. Cultural Monument Cleared 5/26/2017 LAMBERT GIESSINGER
Eng Process Fee Ord 176,300 Cleared 5/26/2017 SEVAK ISAKHAYAN
Highway dedication Cleared 5/26/2017 SEVAK ISAKHAYAN
Historic monument Cleared 5/26/2017 LAMBERT GIESSINGER
Sewer availability Cleared 5/26/2017 SEVAK ISAKHAYAN
Permit Cleared 5/30/2017 TERRY PHAN
Bicycle Parking Cleared 5/31/2017 JACOB BIGLER
Bicycle Parking Cleared 5/31/2017 JACOB BIGLER
Encroachment in public way Cleared 5/31/2017 JACOB BIGLER
Work Adjacent to Public Way Cleared 5/31/2017 MARYAM AZARBAYJANI
Project located in CRA area Cleared 6/12/2017 CRAIG BULLOCK
Green Code Cleared 8/29/2017 MICKEY YAMASHITA
Low Impact Development Cleared 3/30/2018 MARTIN FRAGOSO
Roof/Waste drainage to street Cleared 3/30/2018 CARLA VALLADARES
Historical monument Cleared 4/3/2018 JIM URQUHART
Driveway location Cleared 4/4/2018 JOHNATHAN YU
DAS Clearance Cleared 4/13/2018 SAI KWAN KHUM
Fire Marshall Fire Life Safety Cleared 4/13/2018 ANDREW KO
"D" conditions Cleared 4/16/2018 BRIAN CARR
"Q" conditions Cleared 4/16/2018 BRIAN CARR
CPC Cleared 4/16/2018 BRIAN CARR
CPC Cleared 4/16/2018 BRIAN CARR
Miscellaneous Cleared 4/16/2018 BRIAN CARR
Miscellaneous Cleared 4/16/2018 BRIAN CARR
Opn space landscape/Water mgmt Cleared 4/16/2018 BRIAN CARR
Site Plan review Cleared 4/16/2018 BRIAN CARR
Supp. Use District POD/CDO/TDO Cleared 4/16/2018 BRIAN CARR
ZI Cleared 4/16/2018 BRIAN CARR
ZI Cleared 4/16/2018 BRIAN CARR
Hydrant and Access approval Cleared 4/17/2018 JOHN CONNEALLY
Building over 3-story or 36-ft Cleared 4/18/2018 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 4/18/2018 CALOSHA APPROVED

Contact Information

Architect St, Amand Daun Paul; Lic. No.: C13000 333 S HOPE STREET   RTKL ASSOCIATES INC    LOS ANGELES, CA 90071
Contractor Swinerton Builders; Lic. No.: 92-B 260 TOWNSEND STREET   5TH FLOOR LEGAL    SAN FRANCISCO, CA 94107
Engineer Joseph, Leonard Martin; Lic. No.: S4320 438 MOUNTAIN RD      LAGUNA BEACH, CA 92651
Engineer Tang, Stanley Siu Kei; Lic. No.: C56178 1105 N AVON STREET      BURBANK, CA 91505
Landscape Architect Hutchins, Jeffrey P; Lic. No.: LA3815 625 N HALLOCK AVE      SAN DIMAS, CA 91773

Inspector Information

NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 5/25/2018 Not Ready for Inspection NICK DANERI
Green Building Rough 5/26/2018 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 5/26/2018 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 5/26/2018 Not Ready for Inspection NICK DANERI
Excavation/Setback/Form/Re-Bar 6/2/2018 Partial Approval JAMES POWERS
Footing/Foundation/Slab 6/2/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/5/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 6/6/2018 Conditional Approval NICK DANERI
Footing/Foundation/Slab 6/6/2018 Partial Approval NICK DANERI
Deputy Reinf. Concrete 6/7/2018 Conditional Approval NICK DANERI
Green Building Rough 6/7/2018 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 6/7/2018 Not Ready for Inspection NICK DANERI
Verify Sprinkler Sign Off 6/7/2018 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 6/8/2018 Conditional Approval NICK DANERI
Footing/Foundation/Slab 6/8/2018 Partial Approval NICK DANERI
Deputy Reinf. Concrete 6/11/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 6/12/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 6/13/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 6/14/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 6/14/2018 Partial Approval NICK DANERI
Deputy Reinf. Concrete 6/15/2018 Conditional Approval NICK DANERI
Green Building Rough 6/15/2018 Partial Inspection NICK DANERI
Reinforced Concrete Frame 6/15/2018 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 6/15/2018 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 6/18/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 6/19/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 6/19/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/20/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 6/21/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 6/21/2018 Partial Approval NICK DANERI
Deputy Reinf. Concrete 6/27/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 6/28/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 6/28/2018 Partial Approval NICK DANERI
Deputy Reinf. Concrete 6/29/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 7/2/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 7/3/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 7/6/2018 Not Ready for Inspection NICK DANERI
Green Building Rough 7/10/2018 Partial Inspection NICK DANERI
Reinforced Concrete Frame 7/10/2018 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 7/10/2018 Partial Inspection NICK DANERI
Deputy Pre-Stress Concrete 7/13/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 7/13/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 7/16/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 7/16/2018 Conditional Approval NICK DANERI
Green Building Rough 7/16/2018 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 7/16/2018 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 7/16/2018 Not Ready for Inspection NICK DANERI
Deputy Pre-Stress Concrete 7/17/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 7/17/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 7/18/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 7/18/2018 Conditional Approval NICK DANERI
Footing/Foundation/Slab 7/18/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 7/19/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 7/19/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 7/20/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/20/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/23/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 7/23/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 7/24/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 7/24/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 7/24/2018 Not Ready for Inspection NICK DANERI
Deputy Pre-Stress Concrete 7/25/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 7/25/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 7/25/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 7/26/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 7/26/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 7/27/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 7/27/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 7/27/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 7/30/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 7/30/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 7/30/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 7/31/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 7/31/2018 Conditional Approval NICK DANERI
Deputy Steel/Welding 8/1/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 8/2/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 8/3/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/3/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 8/6/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/6/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 8/6/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 8/7/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/7/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 8/8/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/8/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 8/8/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 8/9/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/9/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 8/10/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/10/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 8/13/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/13/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 8/14/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/14/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 8/14/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 8/15/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/15/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 8/17/2018 Partial Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 8/20/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/20/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 8/21/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/21/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 8/21/2018 Partial Approval NICK DANERI
Green Building Rough 8/21/2018 Partial Inspection NICK DANERI
Reinforced Concrete Frame 8/21/2018 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 8/21/2018 Partial Inspection NICK DANERI
Deputy Pre-Stress Concrete 8/22/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/22/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 8/23/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/23/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 8/23/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 8/24/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/24/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 8/28/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 8/29/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/29/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 8/30/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/30/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 8/31/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/31/2018 Conditional Approval NICK DANERI
Deputy Steel/Welding 8/31/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 8/31/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 9/4/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 9/4/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 9/4/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 9/5/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 9/5/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 9/5/2018 Not Ready for Inspection NICK DANERI
Deputy Pre-Stress Concrete 9/6/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 9/6/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 9/6/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 9/7/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 9/7/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 9/7/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 9/10/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 9/10/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 9/11/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 9/11/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 9/12/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 9/12/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 9/12/2018 Not Ready for Inspection NICK DANERI
Excavation/Setback/Form/Re-Bar 9/13/2018 Partial Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 9/17/2018 Partial Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 9/19/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 9/26/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 9/26/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 9/27/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 9/27/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 9/28/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 9/28/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 10/1/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 10/1/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 10/1/2018 Partial Approval NICK DANERI
Reinforced Masonry Frame 10/1/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 10/2/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 10/2/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 10/3/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 10/3/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 10/4/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 10/4/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 10/5/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/5/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 10/5/2018 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 10/8/2018 Not Ready for Inspection NICK DANERI
Deputy Pre-Stress Concrete 10/9/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 10/9/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 10/9/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 10/10/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 10/10/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 10/10/2018 Off-Hour Fees Due
Reinforced Masonry Frame 10/10/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 10/11/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 10/11/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 10/11/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 10/12/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 10/12/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 10/12/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 10/15/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 10/15/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 10/16/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 10/16/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 10/17/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 10/19/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 10/19/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 10/19/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 10/22/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 10/22/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 10/22/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 10/23/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 10/23/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 10/23/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 10/24/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 10/24/2018 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 10/24/2018 Conditional Approval NICK DANERI
Deputy Steel/Welding 10/24/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 10/25/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 10/25/2018 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 10/25/2018 Conditional Approval NICK DANERI
Deputy Steel/Welding 10/25/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 10/25/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 10/26/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 10/26/2018 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 10/26/2018 Conditional Approval NICK DANERI
Deputy Steel/Welding 10/26/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 10/29/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 10/29/2018 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 10/29/2018 Conditional Approval NICK DANERI
Deputy Steel/Welding 10/29/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 10/30/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 10/30/2018 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 10/30/2018 Conditional Approval NICK DANERI
Deputy Steel/Welding 10/30/2018 Conditional Approval NICK DANERI
Reinforced Masonry Frame 10/30/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 10/31/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 10/31/2018 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 10/31/2018 Conditional Approval NICK DANERI
Deputy Steel/Welding 10/31/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 10/31/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 11/1/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 11/1/2018 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 11/1/2018 Conditional Approval NICK DANERI
Deputy Steel/Welding 11/1/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 11/2/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 11/2/2018 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 11/2/2018 Conditional Approval NICK DANERI
Deputy Steel/Welding 11/2/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 11/5/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 11/5/2018 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 11/5/2018 Conditional Approval NICK DANERI
Deputy Steel/Welding 11/5/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 11/6/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 11/6/2018 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 11/6/2018 Conditional Approval NICK DANERI
Deputy Steel/Welding 11/6/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 11/6/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 11/7/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 11/7/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 11/7/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 11/8/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 11/8/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 11/9/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 11/9/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 11/9/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 11/13/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 11/13/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 11/14/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 11/14/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 11/15/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 11/15/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 11/15/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 11/16/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 11/16/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 11/19/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 11/19/2018 Conditional Approval NICK DANERI
Deputy Steel/Welding 11/19/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 11/19/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 11/20/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 11/20/2018 Conditional Approval NICK DANERI
Deputy Steel/Welding 11/20/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 11/21/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 11/21/2018 Conditional Approval NICK DANERI
Deputy Steel/Welding 11/21/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 11/21/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 11/26/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 11/26/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 11/26/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 11/27/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 11/27/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 11/28/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 11/28/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 11/28/2018 Partial Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 11/29/2018 Partial Approval NICK DANERI
Deputy Reinf. Concrete 12/3/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/10/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 12/10/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 12/11/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 12/11/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 12/12/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 12/12/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 12/12/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 12/13/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 12/13/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 12/14/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 12/14/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 12/18/2018 Partial Approval NICK DANERI
Deputy Reinf. Concrete 12/19/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 12/19/2018 Partial Approval NICK DANERI
Deputy Reinf. Concrete 12/20/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 12/21/2018 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/24/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 12/26/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 12/28/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 12/28/2018 Conditional Approval NICK DANERI
Drywall Nailing 12/28/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 12/31/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/31/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/2/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/2/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 1/2/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/3/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/3/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 1/3/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/4/2019 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 1/8/2019 Partial Inspection NICK DANERI
Excavation/Setback/Form/Re-Bar 1/9/2019 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 1/10/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 1/10/2019 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 1/10/2019 Not Ready for Inspection NICK DANERI
Deputy Pre-Stress Concrete 1/11/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 1/11/2019 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 1/11/2019 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 1/14/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 1/14/2019 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 1/15/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 1/15/2019 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 1/16/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 1/16/2019 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 1/16/2019 Partial Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 1/17/2019 Not Ready for Inspection NICK DANERI
Deputy Pre-Stress Concrete 1/18/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 1/18/2019 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 1/21/2019 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 1/22/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 1/22/2019 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 1/23/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 1/23/2019 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 1/24/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 1/24/2019 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 1/24/2019 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 1/25/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 1/25/2019 Conditional Approval NICK DANERI
Footing/Foundation/Slab 1/28/2019 Partial Approval JONATHAN QUACH
Excavation/Setback/Form/Re-Bar 1/29/2019 Off-Hour Fees Due
Deputy Reinf. Concrete 1/30/2019 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 2/5/2019 Partial Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 2/6/2019 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 2/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/7/2019 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 2/12/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 2/12/2019 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 2/13/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 2/13/2019 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 2/13/2019 Partial Approval NICK DANERI
Light Gage Steel Frame 2/13/2019 Not Ready for Inspection NICK DANERI
Deputy Pre-Stress Concrete 2/14/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 2/14/2019 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 2/15/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 2/15/2019 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 2/15/2019 Not Ready for Inspection NICK DANERI
Deputy Pre-Stress Concrete 2/19/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 2/19/2019 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 2/20/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 2/20/2019 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 2/20/2019 Not Ready for Inspection NICK DANERI
Light Gage Steel Frame 2/20/2019 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 2/21/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 2/21/2019 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 2/22/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 2/22/2019 Conditional Approval NICK DANERI
Drywall Nailing 2/22/2019 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 2/25/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/25/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 2/25/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/26/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 2/26/2019 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 2/26/2019 Partial Approval NICK DANERI
Deputy Drilled-In Anchors 2/27/2019 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 2/27/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 2/27/2019 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 2/28/2019 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 2/28/2019 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 3/1/2019 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 3/1/2019 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 3/4/2019 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 3/4/2019 Conditional Approval NICK DANERI
Green Building Rough 3/4/2019 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 3/4/2019 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 3/4/2019 Not Ready for Inspection NICK DANERI
Deputy Drilled-In Anchors 3/5/2019 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 3/5/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 3/5/2019 Partial Inspection ERNESTO CORRAL
Deputy Pre-Stress Concrete 3/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/6/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 3/6/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/8/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/8/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/11/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/11/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 3/12/2019 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 3/12/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 3/12/2019 Conditional Approval NICK DANERI
Drywall Nailing 3/12/2019 Partial Approval NICK DANERI
Deputy Drilled-In Anchors 3/13/2019 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 3/13/2019 Partial Approval NICK DANERI
Deputy Drilled-In Anchors 3/14/2019 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 3/14/2019 Partial Approval NICK DANERI
Deputy Drilled-In Anchors 3/15/2019 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 3/18/2019 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 3/18/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 3/18/2019 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 3/19/2019 Partial Approval JOEY BUCHANAN
Deputy Reinf. Concrete 3/19/2019 Partial Approval JOEY BUCHANAN
Deputy Pre-Stress Concrete 3/20/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 3/20/2019 Conditional Approval NICK DANERI
Drywall Nailing 3/20/2019 Partial Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 3/20/2019 Partial Approval NICK DANERI
Light Gage Steel Frame 3/20/2019 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 3/21/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 3/21/2019 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 3/21/2019 Partial Approval NICK DANERI
Light Gage Steel Frame 3/21/2019 Not Ready for Inspection NICK DANERI
Deputy Pre-Stress Concrete 3/22/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 3/22/2019 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 3/26/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 3/26/2019 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 3/27/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 3/27/2019 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 3/27/2019 Partial Approval NICK DANERI
Deputy Reinf. Masonry 3/28/2019 Conditional Approval NICK DANERI
Deputy Steel/Welding 3/28/2019 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 3/28/2019 Partial Approval NICK DANERI
Deputy Reinf. Masonry 3/29/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 3/29/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/1/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/1/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/2/2019 Conditional Approval NICK DANERI
Deputy Steel/Welding 4/2/2019 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 4/3/2019 Conditional Approval NICK DANERI
Deputy Steel/Welding 4/3/2019 Conditional Approval NICK DANERI
Drywall Nailing 4/3/2019 Partial Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 4/3/2019 Partial Approval NICK DANERI
Light Gage Steel Frame 4/3/2019 Partial Approval NICK DANERI
Deputy Drilled-In Anchors 4/4/2019 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 4/4/2019 Partial Approval NICK DANERI
Light Gage Steel Frame 4/4/2019 Partial Approval NICK DANERI
Deputy Drilled-In Anchors 4/5/2019 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 4/8/2019 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 4/9/2019 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 4/10/2019 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 4/10/2019 Partial Approval NICK DANERI
Green Building Rough 4/10/2019 Not Ready for Inspection NICK DANERI
Light Gage Steel Frame 4/10/2019 Partial Approval NICK DANERI
Reinforced Concrete Frame 4/10/2019 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 4/10/2019 Not Ready for Inspection NICK DANERI
Deputy Fireproofing 4/11/2019 Conditional Approval NICK DANERI
Deputy Steel/Welding 4/11/2019 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 4/11/2019 Partial Approval NICK DANERI
Light Gage Steel Frame 4/11/2019 Not Ready for Inspection NICK DANERI
Deputy Fireproofing 4/12/2019 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 4/12/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 4/12/2019 Conditional Approval NICK DANERI
Deputy Steel/Welding 4/12/2019 Conditional Approval NICK DANERI
Deputy Fireproofing 4/15/2019 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 4/15/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 4/15/2019 Conditional Approval NICK DANERI
Deputy Steel/Welding 4/15/2019 Conditional Approval NICK DANERI
Deputy Fireproofing 4/16/2019 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 4/16/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 4/16/2019 Conditional Approval NICK DANERI
Deputy Steel/Welding 4/16/2019 Conditional Approval NICK DANERI
Deputy Fireproofing 4/17/2019 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 4/17/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 4/17/2019 Conditional Approval NICK DANERI
Deputy Steel/Welding 4/17/2019 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 4/17/2019 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 4/18/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 4/18/2019 Conditional Approval NICK DANERI
Drywall Nailing 4/18/2019 Partial Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 4/18/2019 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 4/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/24/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 4/24/2019 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 4/24/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 4/24/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/25/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/25/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 4/25/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/26/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/26/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/29/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 4/29/2019 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 4/30/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 4/30/2019 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 5/1/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 5/1/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 5/1/2019 Partial Inspection ERNESTO CORRAL
Light Gage Steel Frame 5/1/2019 Partial Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 5/2/2019 Partial Approval JAMES POWERS
Reinforced Concrete Frame 5/2/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/3/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/7/2019 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 5/7/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/8/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/8/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/8/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 5/8/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/9/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/9/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 5/9/2019 Partial Approval LESLIE TRUJILLO
Structural Steel Frame 5/9/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/10/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/10/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/13/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/13/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 5/15/2019 Partial Inspection ERNESTO CORRAL
Insulation 5/15/2019 Partial Inspection ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 5/16/2019 Partial Inspection ERNESTO CORRAL
Light Gage Steel Frame 5/16/2019 Partial Inspection ERNESTO CORRAL
Wall Anchors 5/16/2019 Partial Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 5/17/2019 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 5/17/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 5/17/2019 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 5/20/2019 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 5/20/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 5/20/2019 Conditional Approval ERNESTO CORRAL
Drywall Nailing 5/20/2019 Partial Inspection ERNESTO CORRAL
Light Gage Steel Frame 5/20/2019 Partial Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 5/21/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/21/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/21/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/22/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/22/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/22/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 5/22/2019 Not Ready for Inspection LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 5/22/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/23/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 5/23/2019 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 5/23/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/28/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/28/2019 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 5/28/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/29/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/29/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/30/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/30/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 5/30/2019 Partial Approval LESLIE TRUJILLO
Green Building Rough 5/30/2019 Not Ready for Inspection JONATHAN QUACH
Green Building Rough 5/30/2019 Off-Hour Fees Due
Insulation 5/30/2019 Partial Approval LESLIE TRUJILLO
Reinforced Concrete Frame 5/30/2019 Off-Hour Fees Due
Reinforced Concrete Frame 5/30/2019 Partial Approval JONATHAN QUACH
Reinforced Masonry Frame 5/30/2019 Partial Inspection LESLIE TRUJILLO
Verify Sprinkler Sign Off 5/30/2019 Not Ready for Inspection JONATHAN QUACH
Verify Sprinkler Sign Off 5/30/2019 Off-Hour Fees Due
Deputy Pre-Stress Concrete 5/31/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/31/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 5/31/2019 Off-Hour Fees Due
Drywall Nailing 6/3/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 6/3/2019 Approved LESLIE TRUJILLO
Deputy Drilled-In Anchors 6/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 6/4/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 6/4/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 6/4/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 6/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 6/5/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 6/5/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 6/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 6/6/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 6/6/2019 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 6/6/2019 Partial Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 6/6/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 6/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 6/7/2019 Conditional Approval LESLIE TRUJILLO
Pre-Inspection 6/7/2019 No Access for Inspection LESLIE TRUJILLO
Deputy Drilled-In Anchors 6/10/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/10/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/10/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 6/10/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 6/10/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 6/10/2019 Partial Inspection LESLIE TRUJILLO
Drywall Nailing 6/11/2019 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 6/12/2019 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 6/13/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/14/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 6/17/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 6/17/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/19/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 6/19/2019 Partial Approval LESLIE TRUJILLO
Insulation 6/19/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 6/19/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/20/2019 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 6/20/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/21/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/21/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 6/21/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/24/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 6/24/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 6/24/2019 Partial Inspection LESLIE TRUJILLO
Deputy Drilled-In Anchors 6/25/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 6/25/2019 Conditional Approval LESLIE TRUJILLO
Insulation 6/25/2019 Not Ready for Inspection LESLIE TRUJILLO
Light Gage Steel Frame 6/25/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 6/26/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 6/26/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 6/26/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 6/26/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 6/27/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 6/27/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 6/27/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 6/28/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/28/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/28/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 6/28/2019 Conditional Approval LESLIE TRUJILLO
Insulation 6/28/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 6/28/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/1/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/1/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/1/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 7/1/2019 Partial Approval LESLIE TRUJILLO
Insulation 7/1/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/2/2019 Conditional Approval LESLIE TRUJILLO
Deputy Fireproofing 7/2/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/2/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/2/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/2/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/3/2019 Conditional Approval LESLIE TRUJILLO
Deputy Fireproofing 7/3/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/3/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/3/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/3/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 7/3/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 7/3/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/5/2019 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 7/5/2019 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 7/5/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/5/2019 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 7/5/2019 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 7/8/2019 Conditional Approval LESLIE TRUJILLO
Deputy Fireproofing 7/8/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/8/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 7/8/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/9/2019 Conditional Approval LESLIE TRUJILLO
Deputy Fireproofing 7/9/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/9/2019 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 7/9/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/10/2019 Conditional Approval LESLIE TRUJILLO
Deputy Fireproofing 7/10/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/10/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/11/2019 Conditional Approval LESLIE TRUJILLO
Deputy Fireproofing 7/11/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/11/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/12/2019 Partial Approval LESLIE TRUJILLO
Deputy Fireproofing 7/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/12/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 7/12/2019 Partial Approval LESLIE TRUJILLO
Insulation 7/12/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 7/12/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/15/2019 Conditional Approval LESLIE TRUJILLO
Deputy Fireproofing 7/15/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/15/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 7/17/2019 Partial Approval LESLIE TRUJILLO
Insulation 7/17/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 7/17/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 7/18/2019 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 7/18/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 7/18/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/19/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 7/19/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 7/19/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 7/22/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 7/22/2019 Partial Inspection LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Fireproofing 7/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/23/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 7/23/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 7/23/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Fireproofing 7/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/25/2019 Conditional Approval LESLIE TRUJILLO
Deputy Fireproofing 7/25/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/25/2019 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 7/25/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/26/2019 Conditional Approval LESLIE TRUJILLO
Deputy Fireproofing 7/26/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/26/2019 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 7/26/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/29/2019 Conditional Approval LESLIE TRUJILLO
Deputy Fireproofing 7/29/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/29/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 7/29/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 7/29/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 7/31/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/1/2019 Conditional Approval LESLIE TRUJILLO
Insulation 8/1/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 8/1/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/2/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 8/2/2019 Partial Approval LESLIE TRUJILLO
Insulation 8/2/2019 Partial Inspection LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/6/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 8/6/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Fireproofing 8/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/7/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 8/7/2019 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 8/7/2019 Off-Hour Fees Due
Light Gage Steel Frame 8/7/2019 Partial Approval LESLIE TRUJILLO
Deputy Fireproofing 8/8/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/8/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 8/8/2019 Off-Hour Fees Due
Excavation/Setback/Form/Re-Bar 8/8/2019 Partial Approval DANIEL MC AULIFFE
Insulation 8/8/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 8/8/2019 Partial Inspection LESLIE TRUJILLO
Deputy Fireproofing 8/9/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/9/2019 Conditional Approval LESLIE TRUJILLO
Deputy Fireproofing 8/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/12/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 8/12/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 8/12/2019 Partial Approval LESLIE TRUJILLO
Deputy Fireproofing 8/13/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/13/2019 Conditional Approval LESLIE TRUJILLO
Insulation 8/14/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 8/14/2019 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/15/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 8/15/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 8/15/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/16/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/16/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/16/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 8/16/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 8/16/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/19/2019 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 8/19/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/20/2019 Conditional Approval LESLIE TRUJILLO
Insulation 8/20/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 8/20/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/21/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/21/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/21/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/22/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/22/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 8/22/2019 Partial Approval LESLIE TRUJILLO
Insulation 8/22/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 8/22/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 8/26/2019 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/27/2019 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 8/27/2019 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/28/2019 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 8/28/2019 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/29/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/30/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/3/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 9/3/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 9/3/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 9/4/2019 Partial Approval LESLIE TRUJILLO
Insulation 9/4/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 9/4/2019 Partial Approval LESLIE TRUJILLO
Insulation 9/6/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 9/6/2019 Partial Inspection LESLIE TRUJILLO
Light Gage Steel Frame 9/9/2019 Partial Approval LESLIE TRUJILLO
Insulation 9/10/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 9/10/2019 Partial Approval LESLIE TRUJILLO
Insulation 9/13/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 9/13/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 9/16/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/17/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/17/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/17/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 9/17/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/18/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 9/18/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 9/18/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/23/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 9/23/2019 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 9/23/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/25/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 9/25/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 9/25/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/26/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/27/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 9/27/2019 Partial Approval LESLIE TRUJILLO
Insulation 9/27/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 9/27/2019 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 9/28/2019 Off-Hour Fees Due
Excavation/Setback/Form/Re-Bar 9/28/2019 Partial Approval JAMES POWERS
Insulation 9/30/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 9/30/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 10/3/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 10/3/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 10/4/2019 Partial Approval LESLIE TRUJILLO
Insulation 10/4/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 10/4/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 10/9/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 10/9/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 10/10/2019 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 10/10/2019 Partial Approval LESLIE TRUJILLO
Insulation 10/10/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 10/11/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 10/11/2019 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 10/15/2019 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 10/15/2019 Partial Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 10/18/2019 Partial Approval DANIEL MC AULIFFE
Insulation 10/18/2019 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 10/18/2019 Partial Approval DANIEL MC AULIFFE
Deputy Steel/Welding 10/22/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 10/22/2019 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 10/22/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 10/22/2019 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 10/23/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 10/23/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 10/23/2019 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 10/24/2019 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 10/24/2019 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 10/25/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 10/25/2019 Off-Hour Fees Due
Green Building Rough 10/25/2019 Not Ready for Inspection JAMES POWERS
Light Gage Steel Frame 10/25/2019 Partial Approval LESLIE TRUJILLO
Reinforced Concrete Frame 10/25/2019 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 10/25/2019 Approved JOEY BUCHANAN
Deputy Steel/Welding 10/28/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 10/28/2019 Corrections Issued LESLIE TRUJILLO
Structural Steel Frame 10/28/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 10/29/2019 Not Ready for Inspection LESLIE TRUJILLO
Wall Anchors 10/29/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 10/31/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 10/31/2019 Partial Approval LESLIE TRUJILLO
Insulation 11/1/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 11/1/2019 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 11/4/2019 Off-Hour Fees Due
Excavation/Setback/Form/Re-Bar 11/4/2019 Partial Approval DANIEL MC AULIFFE
Structural Steel Frame 11/4/2019 Off-Hour Fees Due
Structural Steel Frame 11/4/2019 Partial Approval DANIEL MC AULIFFE
Insulation 11/5/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 11/5/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 11/6/2019 Partial Approval LESLIE TRUJILLO
Insulation 11/6/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 11/6/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 11/8/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 11/8/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 11/12/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 11/12/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/14/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/14/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/15/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/15/2019 Conditional Approval LESLIE TRUJILLO
Insulation 11/15/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 11/15/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/18/2019 Conditional Approval LESLIE TRUJILLO
Insulation 11/18/2019 Corrections Issued LESLIE TRUJILLO
Light Gage Steel Frame 11/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/19/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 11/19/2019 Partial Approval LESLIE TRUJILLO
Insulation 11/19/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 11/19/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/20/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 11/20/2019 Partial Approval LESLIE TRUJILLO
Insulation 11/20/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 11/20/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 11/21/2019 Partial Approval LESLIE TRUJILLO
Insulation 11/21/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 11/21/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 11/22/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 12/2/2019 Partial Approval DANIEL MC AULIFFE
Insulation 12/2/2019 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 12/3/2019 Corrections Issued LESLIE TRUJILLO
Drywall Nailing 12/4/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 12/4/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 12/5/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 12/5/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 12/9/2019 Partial Inspection LESLIE TRUJILLO
Drywall Nailing 12/10/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 12/10/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 12/11/2019 Approved LESLIE TRUJILLO
Drywall Nailing 12/12/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 12/12/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 12/13/2019 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 12/13/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 12/17/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 12/17/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 12/18/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 12/18/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 12/19/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 12/20/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 12/20/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 12/23/2019 Partial Approval LESLIE TRUJILLO
Insulation 12/23/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 12/23/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 12/24/2019 No Access for Inspection LESLIE TRUJILLO
Drywall Nailing 12/26/2019 Partial Approval LESLIE TRUJILLO
Insulation 12/26/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 12/26/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 12/27/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 12/27/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 12/30/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 12/31/2019 Partial Approval LESLIE TRUJILLO
Insulation 12/31/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 1/2/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 1/2/2020 Partial Approval LESLIE TRUJILLO
Drywall Nailing 1/6/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 1/6/2020 Partial Approval LESLIE TRUJILLO
Drywall Nailing 1/7/2020 Partial Approval LESLIE TRUJILLO
Insulation 1/7/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 1/7/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 1/8/2020 Partial Approval LESLIE TRUJILLO
Drywall Nailing 1/9/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 1/9/2020 Partial Approval LESLIE TRUJILLO
Drywall Nailing 1/10/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 1/10/2020 Partial Approval LESLIE TRUJILLO
Drywall Nailing 1/13/2020 Partial Approval LESLIE TRUJILLO
Insulation 1/13/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 1/13/2020 Partial Approval LESLIE TRUJILLO
Drywall Nailing 1/14/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 1/14/2020 Partial Approval LESLIE TRUJILLO
Insulation 1/15/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 1/15/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 1/16/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 1/17/2020 Partial Approval LESLIE TRUJILLO
Drywall Nailing 1/21/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 1/21/2020 Partial Approval LESLIE TRUJILLO
Drywall Nailing 1/22/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 1/22/2020 Partial Inspection LESLIE TRUJILLO
Drywall Nailing 1/23/2020 Partial Inspection LESLIE TRUJILLO
Insulation 1/23/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 1/23/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 1/24/2020 Partial Approval LESLIE TRUJILLO
Drywall Nailing 1/28/2020 Partial Approval LESLIE TRUJILLO
Insulation 1/28/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 1/28/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 1/29/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 1/30/2020 Partial Approval LESLIE TRUJILLO
Drywall Nailing 1/31/2020 Partial Approval LESLIE TRUJILLO
Insulation 1/31/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 1/31/2020 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 2/3/2020 Partial Approval LESLIE TRUJILLO
Insulation 2/6/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 2/6/2020 Order to Comply Issued LESLIE TRUJILLO
Drywall Nailing 2/7/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 2/7/2020 Partial Approval LESLIE TRUJILLO
Drywall Nailing 2/10/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 2/12/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 2/13/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 2/18/2020 Partial Approval LESLIE TRUJILLO
Drywall Nailing 2/19/2020 Partial Approval LESLIE TRUJILLO
Insulation 2/19/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 2/19/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 2/20/2020 Partial Approval LESLIE TRUJILLO
Drywall Nailing 2/21/2020 Partial Approval LESLIE TRUJILLO
Insulation 2/21/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 2/21/2020 Partial Approval LESLIE TRUJILLO
Drywall Nailing 2/24/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 2/24/2020 Partial Approval LESLIE TRUJILLO
Drywall Nailing 2/26/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 2/26/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 2/28/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 2/28/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 3/2/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 3/2/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 3/4/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 3/4/2020 Partial Approval RAFAEL ESPINOZA
Insulation 3/5/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 3/5/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 3/9/2020 Not Ready for Inspection LESLIE TRUJILLO
Light Gage Steel Frame 3/10/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 3/11/2020 Partial Approval LESLIE TRUJILLO
Drywall Nailing 3/13/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 3/13/2020 Partial Approval LESLIE TRUJILLO
Drywall Nailing 3/16/2020 Partial Approval LESLIE TRUJILLO
Insulation 3/16/2020 Partial Approval LESLIE TRUJILLO
Drywall Nailing 3/17/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 3/17/2020 Partial Approval LESLIE TRUJILLO
Drywall Nailing 3/20/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 3/20/2020 Partial Approval LESLIE TRUJILLO
Drywall Nailing 3/24/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 3/24/2020 Partial Approval LESLIE TRUJILLO
Interior/Exterior Lathing 3/25/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 3/25/2020 Partial Approval LESLIE TRUJILLO
Drywall Nailing 4/1/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 4/14/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 4/15/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 4/22/2020 Partial Approval LESLIE TRUJILLO
Drywall Nailing 4/27/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 4/27/2020 Partial Approval LESLIE TRUJILLO
Drywall Nailing 4/29/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 5/1/2020 Partial Approval LESLIE TRUJILLO
Green Building Rough 5/6/2020 Partial Approval NICK DANERI
Light Gage Steel Frame 5/6/2020 Partial Approval NICK DANERI
Reinforced Concrete Frame 5/6/2020 Partial Approval NICK DANERI
Deputy Reinf. Concrete 5/8/2020 Conditional Approval NICK DANERI
Drywall Nailing 5/12/2020 Partial Approval NICK DANERI
Light Gage Steel Frame 5/12/2020 Conditional Approval NICK DANERI
Light Gage Steel Frame 5/13/2020 Partial Approval NICK DANERI
Drywall Nailing 5/18/2020 Partial Approval NICK DANERI
Light Gage Steel Frame 5/18/2020 Partial Approval NICK DANERI
Drywall Nailing 5/20/2020 Partial Approval NICK DANERI
Light Gage Steel Frame 5/20/2020 Partial Approval NICK DANERI
Drywall Nailing 5/21/2020 Partial Approval NICK DANERI
Drywall Nailing 5/22/2020 Partial Approval NICK DANERI
Light Gage Steel Frame 5/22/2020 Partial Approval NICK DANERI
Drywall Nailing 5/26/2020 Partial Approval NICK DANERI
Drywall Nailing 5/28/2020 Partial Approval NICK DANERI
Light Gage Steel Frame 5/28/2020 Partial Approval NICK DANERI
Drywall Nailing 6/3/2020 Partial Approval NICK DANERI
Light Gage Steel Frame 6/3/2020 Partial Approval NICK DANERI
Light Gage Steel Frame 6/8/2020 Partial Approval NICK DANERI
Light Gage Steel Frame 6/10/2020 Partial Approval NICK DANERI
Drywall Nailing 6/12/2020 Partial Approval NICK DANERI
Drywall Nailing 6/17/2020 Partial Approval NICK DANERI
Light Gage Steel Frame 6/17/2020 Partial Inspection NICK DANERI
Drywall Nailing 6/18/2020 Partial Approval NICK DANERI
Light Gage Steel Frame 6/18/2020 Partial Approval NICK DANERI
Wood Frame 6/24/2020 Partial Approval NICK DANERI
Pre-Inspection 7/1/2020 Partial Approval NICK DANERI
Pre-Inspection 7/16/2020 Partial Inspection NICK DANERI
Special/Order Compliance 7/17/2020 Partial Inspection NICK DANERI
Pre-Inspection 7/24/2020 Partial Approval NICK DANERI
Final 7/29/2020 Not Ready for Inspection NICK DANERI
Footing/Foundation/Slab 7/29/2020 Approved NICK DANERI
Green Building Final 7/29/2020 Not Ready for Inspection NICK DANERI
Green Building Rough 7/29/2020 Approved NICK DANERI
Reinforced Concrete Frame 7/29/2020 Approved NICK DANERI
SGSOV-Seismic Gas S/O Valve 7/29/2020 SGSOV Not Ready NICK DANERI
Smoke Detectors 7/29/2020 Partial Inspection NICK DANERI
Special/Order Compliance 7/30/2020 Conditional Approval NICK DANERI
Pre-Inspection 7/31/2020 Partial Approval NICK DANERI
Final 8/4/2020 Not Ready for Inspection NICK DANERI
Green Building Final 8/4/2020 Conditional Approval NICK DANERI
SGSOV-Seismic Gas S/O Valve 8/4/2020 SGSOV Not Ready NICK DANERI
Smoke Detectors 8/4/2020 Conditional Approval NICK DANERI
Final 8/7/2020 Partial Inspection NICK DANERI
Green Building Final 8/7/2020 Conditional Approval NICK DANERI
SGSOV-Seismic Gas S/O Valve 8/7/2020 SGSOV Not Ready NICK DANERI
Smoke Detectors 8/7/2020 Not Ready for Inspection NICK DANERI
Pre-Inspection 8/10/2020 Partial Approval NICK DANERI
Pre-Inspection 8/11/2020 Partial Approval NICK DANERI
Pre-Inspection 8/12/2020 Partial Approval NICK DANERI
Pre-Inspection 8/17/2020 Partial Approval NICK DANERI
Pre-Inspection 8/25/2020 Partial Inspection NICK DANERI
Light Gage Steel Frame 9/8/2020 Partial Approval RAFAEL ESPINOZA
T-Bar Ceiling 9/8/2020 Partial Approval RAFAEL ESPINOZA
Pre-Inspection 9/23/2020 Partial Inspection NICK DANERI
Light Gage Steel Frame 10/8/2020 Partial Approval NICK DANERI
Pre-Inspection 10/14/2020 Partial Approval NICK DANERI
Pre-Inspection 10/21/2020 Partial Approval NICK DANERI
Light Gage Steel Frame 11/4/2020 Partial Approval NICK DANERI
Final 11/5/2020 Conditional Approval NICK DANERI
Green Building Final 11/5/2020 Approved NICK DANERI
SGSOV-Seismic Gas S/O Valve 11/5/2020 SGSOV Approved NICK DANERI
Smoke Detectors 11/5/2020 Approved NICK DANERI
Light Gage Steel Frame 12/7/2020 Not Ready for Inspection NICK DANERI
Light Gage Steel Frame 12/10/2020 Partial Approval NICK DANERI
Special/Order Compliance 4/28/2021 Partial Approval NICK DANERI
Special/Order Compliance 6/9/2021 Partial Approval NICK DANERI
Special/Order Compliance 10/20/2021 Conditional Approval RAFAEL ESPINOZA