Deputy Reinf. Concrete
|
3/24/2017
|
No Access for Inspection
|
TONY HARTONO
|
Excavation/Setback/Form/Re-Bar
|
3/29/2017
|
Partial Approval
|
TONY HARTONO
|
Grading Pre-Inspection
|
3/29/2017
|
Conditional Approval
|
TONY HARTONO
|
Pre-Inspection
|
3/29/2017
|
Partial Inspection
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
3/30/2017
|
Approved
|
TONY HARTONO
|
Grading Pre-Inspection
|
3/30/2017
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
4/4/2017
|
Approved
|
TONY HARTONO
|
Piling/Pier/Caisson
|
4/17/2017
|
No Access for Inspection
|
TONY HARTONO
|
Special/Order Compliance
|
5/25/2017
|
Partial Inspection
|
TONY HARTONO
|
Deputy Grading
|
8/16/2017
|
Approved
|
TONY HARTONO
|
Deputy Grading
|
8/17/2017
|
Approved
|
TONY HARTONO
|
Deputy Grading
|
8/18/2017
|
Approved
|
TONY HARTONO
|
Deputy Grading
|
8/21/2017
|
Approved
|
TONY HARTONO
|
Deputy Grading
|
8/22/2017
|
Approved
|
TONY HARTONO
|
Deputy Grading
|
8/23/2017
|
Approved
|
TONY HARTONO
|
Deputy Grading
|
8/24/2017
|
Approved
|
TONY HARTONO
|
Deputy Grading
|
8/28/2017
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
8/28/2017
|
Approved
|
TONY HARTONO
|
Deputy Grading
|
8/29/2017
|
Approved
|
TONY HARTONO
|
Excavation/Setback/Form/Re-Bar
|
8/29/2017
|
Partial Inspection
|
TONY HARTONO
|
Green Building Rough
|
8/29/2017
|
Not Ready for Inspection
|
BRYAN MEYER
|
Pre-Inspection
|
8/29/2017
|
Partial Inspection
|
TONY HARTONO
|
SWPPP-Const. Storm Water
|
8/29/2017
|
Completed
|
TONY HARTONO
|
Structural Steel Frame
|
8/29/2017
|
Not Ready for Inspection
|
TONY HARTONO
|
Verify Sprinkler Sign Off
|
8/29/2017
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Grading
|
8/30/2017
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
8/30/2017
|
Approved
|
TONY HARTONO
|
Deputy Grading
|
8/31/2017
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
8/31/2017
|
Approved
|
TONY HARTONO
|
Deputy Grading
|
9/1/2017
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
9/1/2017
|
Approved
|
TONY HARTONO
|
Deputy Grading
|
9/5/2017
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
9/5/2017
|
Approved
|
TONY HARTONO
|
Deputy Grading
|
9/6/2017
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
9/6/2017
|
Approved
|
TONY HARTONO
|
Deputy Grading
|
9/7/2017
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
9/7/2017
|
Approved
|
TONY HARTONO
|
Deputy Grading
|
9/8/2017
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
9/8/2017
|
Approved
|
TONY HARTONO
|
Special/Order Compliance
|
9/19/2017
|
Partial Inspection
|
TONY HARTONO
|
Excavation/Setback/Form/Re-Bar
|
9/28/2017
|
Not Ready for Inspection
|
TONY HARTONO
|
Footing/Foundation/Slab
|
9/28/2017
|
Not Ready for Inspection
|
TONY HARTONO
|
SWPPP-Const. Storm Water
|
9/28/2017
|
Completed
|
TONY HARTONO
|
Deputy Grading
|
10/2/2017
|
Conditional Approval
|
JONATHAN ALLEN
|
Deputy Grading
|
10/3/2017
|
Approved
|
TONY HARTONO
|
Deputy Grading
|
10/4/2017
|
Approved
|
TONY HARTONO
|
Deputy Grading
|
10/5/2017
|
Approved
|
TONY HARTONO
|
Deputy Grading
|
10/6/2017
|
Approved
|
TONY HARTONO
|
Green Building Rough
|
10/13/2017
|
Not Ready for Inspection
|
BRYAN MEYER
|
Reinforced Concrete Frame
|
10/13/2017
|
Partial Inspection
|
TONY HARTONO
|
SWPPP-Const. Storm Water
|
10/13/2017
|
Completed
|
TONY HARTONO
|
Verify Sprinkler Sign Off
|
10/13/2017
|
Not Ready for Inspection
|
TONY HARTONO
|
Excavation/Setback/Form/Re-Bar
|
10/16/2017
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Grading
|
10/20/2017
|
Approved
|
TONY HARTONO
|
Deputy Grading
|
10/23/2017
|
Approved
|
TONY HARTONO
|
Deputy Grading
|
10/24/2017
|
Approved
|
JONATHAN ALLEN
|
Deputy Grading
|
10/25/2017
|
Approved
|
JONATHAN ALLEN
|
Deputy Grading
|
10/26/2017
|
Approved
|
JONATHAN ALLEN
|
Deputy Grading
|
10/27/2017
|
Approved
|
JONATHAN ALLEN
|
Deputy Grading
|
10/30/2017
|
Approved
|
JONATHAN ALLEN
|
Deputy Reinf. Concrete
|
10/30/2017
|
Approved
|
JONATHAN ALLEN
|
Deputy Reinf. Concrete
|
10/31/2017
|
Approved
|
JONATHAN ALLEN
|
Deputy Reinf. Concrete
|
11/1/2017
|
Approved
|
JONATHAN ALLEN
|
Deputy Reinf. Concrete
|
11/2/2017
|
Approved
|
JONATHAN ALLEN
|
Deputy Reinf. Concrete
|
11/3/2017
|
Approved
|
JONATHAN ALLEN
|
Deputy Grading
|
12/4/2017
|
Approved
|
TONY HARTONO
|
Deputy Grading
|
12/5/2017
|
Approved
|
TONY HARTONO
|
Deputy Grading
|
12/6/2017
|
Approved
|
TONY HARTONO
|
Deputy Grading
|
12/7/2017
|
Approved
|
TONY HARTONO
|
Deputy Grading
|
12/8/2017
|
Approved
|
TONY HARTONO
|
Deputy Grading
|
12/19/2017
|
Approved
|
TONY HARTONO
|
Footing/Foundation/Slab
|
1/25/2018
|
Partial Approval
|
TONY HARTONO
|
Green Building Rough
|
1/25/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Reinforced Masonry Frame
|
1/25/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Verify Sprinkler Sign Off
|
1/25/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Grading
|
2/2/2018
|
Approved
|
TONY HARTONO
|
Deputy Grading
|
2/9/2018
|
Approved
|
TONY HARTONO
|
Deputy Grading
|
2/12/2018
|
Conditional Approval
|
SORIN CIRSTOIU
|
Deputy Grading
|
2/26/2018
|
Approved
|
TONY HARTONO
|
Deputy Grading
|
2/27/2018
|
Approved
|
TONY HARTONO
|
Deputy Grading
|
2/28/2018
|
Approved
|
TONY HARTONO
|
Deputy Grading
|
3/1/2018
|
Approved
|
TONY HARTONO
|
Deputy Grading
|
3/2/2018
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Masonry
|
5/4/2018
|
Approved
|
TONY HARTONO
|
Special/Order Compliance
|
5/4/2018
|
Partial Inspection
|
TONY HARTONO
|
Deputy Reinf. Masonry
|
5/7/2018
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Masonry
|
5/8/2018
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Masonry
|
5/9/2018
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Masonry
|
5/10/2018
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Masonry
|
5/11/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
7/10/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
7/10/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
7/11/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
7/11/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
7/12/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
7/12/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
7/13/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
7/13/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
7/16/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
7/16/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
7/17/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
7/17/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
7/18/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
7/18/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
7/19/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
7/19/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
7/20/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
7/20/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
7/23/2018
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
7/23/2018
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
7/25/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
7/25/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
7/26/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
7/26/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
7/27/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
7/27/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
7/30/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
7/30/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
7/31/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
7/31/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
8/1/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
8/1/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
8/2/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
8/2/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
8/3/2018
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
8/3/2018
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
8/6/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
8/6/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
8/7/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
8/7/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
8/8/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
8/8/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
8/9/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
8/9/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
8/10/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
8/10/2018
|
Approved
|
TONY HARTONO
|
Green Building Rough
|
8/17/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Footing/Foundation/Slab
|
8/22/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Green Building Rough
|
8/22/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
8/22/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Reinforced Concrete Frame
|
8/22/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Reinforced Masonry Frame
|
8/22/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Structural Steel Frame
|
8/22/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Verify Sprinkler Sign Off
|
8/22/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Wall Anchors
|
8/22/2018
|
Partial Inspection
|
TONY HARTONO
|
Reinforced Concrete Frame
|
8/23/2018
|
Partial Approval
|
TONY HARTONO
|
Wall Anchors
|
8/23/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Steel/Welding
|
9/24/2018
|
Approved
|
DERRICK SPENCER
|
Drywall Nailing
|
9/24/2018
|
Partial Approval
|
DERRICK SPENCER
|
Green Building Rough
|
9/24/2018
|
Not Ready for Inspection
|
DERRICK SPENCER
|
Light Gage Steel Frame
|
9/24/2018
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
9/25/2018
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
9/26/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
9/27/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
9/28/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
10/2/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
10/2/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
10/3/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
10/3/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
10/4/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
10/4/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
10/5/2018
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
10/5/2018
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
10/9/2018
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
10/9/2018
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
10/10/2018
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
10/10/2018
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
10/11/2018
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
10/11/2018
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
10/12/2018
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
10/12/2018
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
10/15/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
10/15/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
10/16/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
10/16/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
10/17/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
10/17/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
10/18/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
10/18/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
10/18/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
10/19/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
10/19/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
10/19/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
10/22/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
10/22/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
10/22/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
10/23/2018
|
Approved
|
DERRICK SPENCER
|
Deputy Fireproofing
|
10/24/2018
|
Approved
|
DERRICK SPENCER
|
Insulation
|
1/3/2019
|
Partial Approval
|
DERRICK SPENCER
|
Footing/Foundation/Slab
|
1/15/2019
|
Partial Approval
|
TONY HARTONO
|
Green Building Rough
|
1/15/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Reinforced Concrete Frame
|
1/15/2019
|
Partial Approval
|
TONY HARTONO
|
SWPPP-Const. Storm Water
|
1/15/2019
|
Completed
|
TONY HARTONO
|
Verify Sprinkler Sign Off
|
1/15/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Pre-Inspection
|
1/16/2019
|
Approved
|
JASON BORUTA
|
Drywall Nailing
|
1/18/2019
|
Partial Approval
|
TONY HARTONO
|
Insulation
|
1/22/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
1/24/2019
|
Partial Approval
|
TONY HARTONO
|
Drywall Nailing
|
1/25/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Green Building Rough
|
1/25/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Drywall Nailing
|
1/28/2019
|
Partial Approval
|
TONY HARTONO
|
Verify Sprinkler Sign Off
|
1/28/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Green Building Rough
|
1/30/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Reinforced Concrete Frame
|
1/30/2019
|
Partial Approval
|
TONY HARTONO
|
Verify Sprinkler Sign Off
|
1/30/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
1/31/2019
|
Partial Approval
|
TONY HARTONO
|
Insulation
|
1/31/2019
|
Partial Inspection
|
TONY HARTONO
|
Insulation
|
2/4/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
2/4/2019
|
Partial Approval
|
TONY HARTONO
|
Drywall Nailing
|
2/5/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
2/5/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
2/7/2019
|
Partial Approval
|
TONY HARTONO
|
Drywall Nailing
|
2/8/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
2/8/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
2/11/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
2/11/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
2/11/2019
|
Approved
|
TONY HARTONO
|
Light Gage Steel Frame
|
2/11/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
2/12/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
2/12/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
2/12/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
2/12/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
2/12/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
2/12/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Green Building Rough
|
2/12/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
2/12/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
2/13/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
2/13/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
2/13/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
2/13/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
2/13/2019
|
Approved
|
TONY HARTONO
|
Light Gage Steel Frame
|
2/13/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Reinforced Concrete Frame
|
2/13/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
2/14/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
2/14/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
2/14/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
2/14/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
2/14/2019
|
Approved
|
TONY HARTONO
|
Reinforced Concrete Frame
|
2/14/2019
|
Partial Approval
|
TONY HARTONO
|
Structural Steel Frame
|
2/14/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
2/15/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Fireproofing
|
2/15/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
2/15/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
2/15/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Wood Construction
|
2/15/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
2/19/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
2/19/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
2/19/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
2/19/2019
|
Approved
|
TONY HARTONO
|
Insulation
|
2/19/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
2/19/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
2/20/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
2/20/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
2/20/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
2/20/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
2/20/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Green Building Rough
|
2/20/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
2/20/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
2/20/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
2/21/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
2/21/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
2/21/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
2/21/2019
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
2/22/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
2/22/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
2/22/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
2/22/2019
|
Approved
|
TONY HARTONO
|
Insulation
|
2/22/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
2/22/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
2/25/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
2/25/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
2/25/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
2/25/2019
|
Approved
|
TONY HARTONO
|
Green Building Rough
|
2/25/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
2/25/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
2/26/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
2/26/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
2/26/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
2/26/2019
|
Approved
|
TONY HARTONO
|
Light Gage Steel Frame
|
2/26/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
2/27/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Fireproofing
|
2/27/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
2/27/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Wood Construction
|
2/27/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
2/28/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Fireproofing
|
2/28/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
2/28/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Wood Construction
|
2/28/2019
|
Approved
|
DERRICK SPENCER
|
Insulation
|
2/28/2019
|
Not Ready for Inspection
|
DERRICK SPENCER
|
Light Gage Steel Frame
|
2/28/2019
|
Not Ready for Inspection
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
3/1/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
3/1/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
3/1/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
3/1/2019
|
Approved
|
TONY HARTONO
|
Insulation
|
3/1/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
3/1/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
3/4/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
3/4/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
3/4/2019
|
Approved
|
TONY HARTONO
|
Light Gage Steel Frame
|
3/4/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
3/5/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
3/5/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
3/5/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
3/5/2019
|
Approved
|
TONY HARTONO
|
Light Gage Steel Frame
|
3/5/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
3/6/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
3/6/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
3/6/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
3/6/2019
|
Approved
|
TONY HARTONO
|
Insulation
|
3/6/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
3/6/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
3/7/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
3/7/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
3/7/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
3/7/2019
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
3/8/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
3/8/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
3/8/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
3/8/2019
|
Approved
|
TONY HARTONO
|
Insulation
|
3/8/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
3/11/2019
|
Approved
|
NICK LAROCCA
|
Deputy Fireproofing
|
3/11/2019
|
Approved
|
NICK LAROCCA
|
Deputy Reinf. Concrete
|
3/11/2019
|
Approved
|
NICK LAROCCA
|
Deputy Steel/Welding
|
3/11/2019
|
Approved
|
NICK LAROCCA
|
Deputy Wood Construction
|
3/11/2019
|
Approved
|
NICK LAROCCA
|
Drywall Nailing
|
3/11/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
Green Building Rough
|
3/11/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
Deputy Drilled-In Anchors
|
3/12/2019
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Fireproofing
|
3/12/2019
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
3/12/2019
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Steel/Welding
|
3/12/2019
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Wood Construction
|
3/12/2019
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Insulation
|
3/12/2019
|
Partial Inspection
|
DANIEL MC AULIFFE
|
Interior/Exterior Lathing
|
3/12/2019
|
Partial Inspection
|
DANIEL MC AULIFFE
|
Deputy Drilled-In Anchors
|
3/13/2019
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Drilled-In Anchors
|
3/13/2019
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Fireproofing
|
3/13/2019
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
3/13/2019
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Steel/Welding
|
3/13/2019
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Wood Construction
|
3/13/2019
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Drilled-In Anchors
|
3/14/2019
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Fireproofing
|
3/14/2019
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
3/14/2019
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Steel/Welding
|
3/14/2019
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Wood Construction
|
3/14/2019
|
Approved
|
DANIEL MC AULIFFE
|
Drywall Nailing
|
3/14/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
Green Building Rough
|
3/14/2019
|
Partial Inspection
|
DANIEL MC AULIFFE
|
Insulation
|
3/14/2019
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
Light Gage Steel Frame
|
3/14/2019
|
Partial Inspection
|
DANIEL MC AULIFFE
|
Reinforced Concrete Frame
|
3/14/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
Deputy Drilled-In Anchors
|
3/15/2019
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Fireproofing
|
3/15/2019
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
3/15/2019
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Steel/Welding
|
3/15/2019
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Wood Construction
|
3/15/2019
|
Approved
|
DANIEL MC AULIFFE
|
Light Gage Steel Frame
|
3/15/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
Deputy Drilled-In Anchors
|
3/18/2019
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Fireproofing
|
3/18/2019
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Masonry
|
3/18/2019
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Steel/Welding
|
3/18/2019
|
Approved
|
DANIEL MC AULIFFE
|
Light Gage Steel Frame
|
3/18/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
Reinforced Concrete Frame
|
3/18/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
Deputy Drilled-In Anchors
|
3/19/2019
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Fireproofing
|
3/19/2019
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
3/19/2019
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Masonry
|
3/19/2019
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Steel/Welding
|
3/19/2019
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Wood Construction
|
3/19/2019
|
Approved
|
DANIEL MC AULIFFE
|
Insulation
|
3/19/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
Light Gage Steel Frame
|
3/19/2019
|
Partial Inspection
|
DANIEL MC AULIFFE
|
Deputy Drilled-In Anchors
|
3/20/2019
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Fireproofing
|
3/20/2019
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Concrete
|
3/20/2019
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Reinf. Masonry
|
3/20/2019
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Steel/Welding
|
3/20/2019
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Wood Construction
|
3/20/2019
|
Approved
|
DANIEL MC AULIFFE
|
Drywall Nailing
|
3/20/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
Green Building Rough
|
3/20/2019
|
Partial Inspection
|
DANIEL MC AULIFFE
|
Insulation
|
3/20/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
Deputy Drilled-In Anchors
|
3/21/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Fireproofing
|
3/21/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
3/21/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
3/21/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Wood Construction
|
3/21/2019
|
Approved
|
DERRICK SPENCER
|
Insulation
|
3/21/2019
|
Not Ready for Inspection
|
DERRICK SPENCER
|
Light Gage Steel Frame
|
3/21/2019
|
Not Ready for Inspection
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
3/22/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Fireproofing
|
3/22/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
3/22/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Masonry
|
3/22/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
3/22/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Wood Construction
|
3/22/2019
|
Approved
|
DERRICK SPENCER
|
Green Building Rough
|
3/22/2019
|
Not Ready for Inspection
|
DERRICK SPENCER
|
Insulation
|
3/22/2019
|
Not Ready for Inspection
|
DERRICK SPENCER
|
Reinforced Masonry Frame
|
3/22/2019
|
Not Ready for Inspection
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
3/26/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
3/26/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
3/26/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
3/26/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
3/26/2019
|
Approved
|
TONY HARTONO
|
Insulation
|
3/26/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
3/26/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
3/27/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
3/27/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
3/27/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
3/27/2019
|
Approved
|
TONY HARTONO
|
Insulation
|
3/27/2019
|
Partial Approval
|
TONY HARTONO
|
Interior/Exterior Lathing
|
3/27/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
3/28/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
3/28/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
3/28/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
3/28/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
3/28/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Floor/Roof Diaphrgm/Shear Wall
|
3/28/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Green Building Rough
|
3/28/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
3/28/2019
|
Partial Approval
|
TONY HARTONO
|
Interior/Exterior Lathing
|
3/28/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
3/28/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Wall Anchors
|
3/28/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
3/29/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
3/29/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
3/29/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
3/29/2019
|
Approved
|
TONY HARTONO
|
Floor/Roof Diaphrgm/Shear Wall
|
3/29/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
3/29/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Interior/Exterior Lathing
|
3/29/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
3/29/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Wall Anchors
|
3/29/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
4/1/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
4/1/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
4/1/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
4/1/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
4/1/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Green Building Rough
|
4/1/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
4/1/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
4/1/2019
|
Partial Approval
|
TONY HARTONO
|
Reinforced Concrete Frame
|
4/1/2019
|
Partial Approval
|
TONY HARTONO
|
Wall Anchors
|
4/1/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
4/2/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
4/2/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
4/2/2019
|
Partial Approval
|
TONY HARTONO
|
Insulation
|
4/2/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
4/3/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
4/3/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
4/3/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
4/3/2019
|
Approved
|
TONY HARTONO
|
Insulation
|
4/3/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
4/4/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
4/4/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
4/4/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
4/4/2019
|
Approved
|
TONY HARTONO
|
Floor/Roof Diaphrgm/Shear Wall
|
4/4/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
4/4/2019
|
Partial Approval
|
TONY HARTONO
|
Interior/Exterior Lathing
|
4/4/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
4/4/2019
|
Partial Approval
|
TONY HARTONO
|
Wall Anchors
|
4/4/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
4/5/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
4/5/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
4/5/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
4/5/2019
|
Approved
|
TONY HARTONO
|
Floor/Roof Diaphrgm/Shear Wall
|
4/5/2019
|
Partial Approval
|
TONY HARTONO
|
Insulation
|
4/5/2019
|
Partial Approval
|
TONY HARTONO
|
Interior/Exterior Lathing
|
4/5/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
4/5/2019
|
Partial Approval
|
TONY HARTONO
|
Wall Anchors
|
4/5/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
4/8/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
4/8/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
4/8/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
4/8/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
4/8/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Floor/Roof Diaphrgm/Shear Wall
|
4/8/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Green Building Rough
|
4/8/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
4/8/2019
|
Partial Approval
|
TONY HARTONO
|
Interior/Exterior Lathing
|
4/8/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
4/8/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Wall Anchors
|
4/8/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
4/9/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
4/9/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
4/9/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
4/9/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
4/9/2019
|
Partial Approval
|
TONY HARTONO
|
Floor/Roof Diaphrgm/Shear Wall
|
4/9/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
4/9/2019
|
Partial Approval
|
TONY HARTONO
|
Interior/Exterior Lathing
|
4/9/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
4/9/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Structural Steel Frame
|
4/9/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
4/10/2019
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
4/10/2019
|
Conditional Approval
|
JASON BORUTA
|
Deputy Fireproofing
|
4/10/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
4/10/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
4/10/2019
|
Conditional Approval
|
TONY HARTONO
|
Deputy Wood Construction
|
4/10/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
4/10/2019
|
Partial Approval
|
TONY HARTONO
|
Insulation
|
4/10/2019
|
Partial Approval
|
TONY HARTONO
|
Interior/Exterior Lathing
|
4/10/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
4/10/2019
|
Partial Inspection
|
TONY HARTONO
|
Wall Anchors
|
4/10/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
4/11/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
4/11/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
4/11/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
4/11/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
4/11/2019
|
Partial Approval
|
TONY HARTONO
|
Insulation
|
4/11/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
4/11/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Wall Anchors
|
4/11/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
4/12/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
4/12/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
4/12/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
4/12/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
4/12/2019
|
Partial Approval
|
TONY HARTONO
|
Insulation
|
4/12/2019
|
Partial Approval
|
TONY HARTONO
|
Interior/Exterior Lathing
|
4/12/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
4/12/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
4/15/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
4/15/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
4/15/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
4/15/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
4/15/2019
|
Partial Approval
|
TONY HARTONO
|
Floor/Roof Diaphrgm/Shear Wall
|
4/15/2019
|
Approved
|
TONY HARTONO
|
Green Building Rough
|
4/15/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
4/15/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Interior/Exterior Lathing
|
4/15/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
4/15/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Wall Anchors
|
4/15/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
4/16/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
4/16/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
4/16/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
4/16/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
4/16/2019
|
Partial Approval
|
TONY HARTONO
|
Floor/Roof Diaphrgm/Shear Wall
|
4/16/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
4/16/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Interior/Exterior Lathing
|
4/16/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
4/16/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
4/17/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
4/17/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
4/17/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
4/17/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
4/17/2019
|
Partial Inspection
|
TONY HARTONO
|
Floor/Roof Diaphrgm/Shear Wall
|
4/17/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
4/17/2019
|
Partial Approval
|
TONY HARTONO
|
Interior/Exterior Lathing
|
4/17/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
4/17/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
4/18/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
4/18/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
4/18/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
4/18/2019
|
Approved
|
TONY HARTONO
|
Floor/Roof Diaphrgm/Shear Wall
|
4/18/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
4/18/2019
|
Partial Approval
|
TONY HARTONO
|
Interior/Exterior Lathing
|
4/18/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
4/18/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
4/19/2019
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Fireproofing
|
4/19/2019
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Steel/Welding
|
4/19/2019
|
Approved
|
DANIEL MC AULIFFE
|
Deputy Wood Construction
|
4/19/2019
|
Approved
|
DANIEL MC AULIFFE
|
Drywall Nailing
|
4/19/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
Floor/Roof Diaphrgm/Shear Wall
|
4/19/2019
|
Partial Inspection
|
DANIEL MC AULIFFE
|
Green Building Rough
|
4/19/2019
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
Insulation
|
4/19/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
Interior/Exterior Lathing
|
4/19/2019
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
Light Gage Steel Frame
|
4/19/2019
|
Partial Inspection
|
DANIEL MC AULIFFE
|
Deputy Drilled-In Anchors
|
4/22/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
4/22/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
4/22/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
4/22/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
4/22/2019
|
Partial Approval
|
TONY HARTONO
|
Insulation
|
4/22/2019
|
Partial Approval
|
TONY HARTONO
|
Interior/Exterior Lathing
|
4/22/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
4/22/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
4/23/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
4/23/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
4/23/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
4/23/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
4/23/2019
|
Partial Approval
|
TONY HARTONO
|
Floor/Roof Diaphrgm/Shear Wall
|
4/23/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
4/23/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Interior/Exterior Lathing
|
4/23/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
4/24/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
4/24/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
4/24/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
4/24/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
4/24/2019
|
Partial Approval
|
TONY HARTONO
|
Floor/Roof Diaphrgm/Shear Wall
|
4/24/2019
|
Partial Approval
|
TONY HARTONO
|
Green Building Rough
|
4/24/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
4/24/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Interior/Exterior Lathing
|
4/24/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
4/24/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
4/25/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
4/25/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
4/25/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
4/25/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
4/25/2019
|
Partial Approval
|
TONY HARTONO
|
Insulation
|
4/25/2019
|
Partial Approval
|
TONY HARTONO
|
Interior/Exterior Lathing
|
4/25/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
4/25/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
4/26/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
4/26/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
4/26/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
4/26/2019
|
Approved
|
TONY HARTONO
|
Floor/Roof Diaphrgm/Shear Wall
|
4/26/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
4/26/2019
|
Partial Approval
|
TONY HARTONO
|
Interior/Exterior Lathing
|
4/26/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
4/26/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
4/29/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
4/29/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
4/29/2019
|
Approved
|
TONY HARTONO
|
Floor/Roof Diaphrgm/Shear Wall
|
4/29/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
4/29/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Interior/Exterior Lathing
|
4/29/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
4/29/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
4/30/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
4/30/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
4/30/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
4/30/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
4/30/2019
|
Partial Approval
|
TONY HARTONO
|
Floor/Roof Diaphrgm/Shear Wall
|
4/30/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Green Building Rough
|
4/30/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
4/30/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
4/30/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Wall Anchors
|
4/30/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
5/1/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
5/1/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
5/1/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
5/1/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
5/1/2019
|
Partial Approval
|
TONY HARTONO
|
Insulation
|
5/1/2019
|
Partial Approval
|
TONY HARTONO
|
Interior/Exterior Lathing
|
5/1/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
5/1/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
5/2/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
5/2/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
5/2/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
5/2/2019
|
Approved
|
TONY HARTONO
|
Floor/Roof Diaphrgm/Shear Wall
|
5/2/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
5/2/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Interior/Exterior Lathing
|
5/2/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
5/2/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Wall Anchors
|
5/2/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
5/3/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
5/3/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
5/3/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
5/3/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
5/3/2019
|
Partial Approval
|
TONY HARTONO
|
Insulation
|
5/3/2019
|
Partial Approval
|
TONY HARTONO
|
Interior/Exterior Lathing
|
5/3/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
5/3/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
5/6/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
5/6/2019
|
Approved
|
TONY HARTONO
|
Floor/Roof Diaphrgm/Shear Wall
|
5/6/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
5/6/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Interior/Exterior Lathing
|
5/6/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
5/6/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
5/7/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Fireproofing
|
5/7/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
5/7/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Wood Construction
|
5/7/2019
|
Approved
|
DERRICK SPENCER
|
Drywall Nailing
|
5/7/2019
|
Not Ready for Inspection
|
DERRICK SPENCER
|
Floor/Roof Diaphrgm/Shear Wall
|
5/7/2019
|
Not Ready for Inspection
|
DERRICK SPENCER
|
Green Building Rough
|
5/7/2019
|
Approved
|
DERRICK SPENCER
|
Insulation
|
5/7/2019
|
Partial Approval
|
DERRICK SPENCER
|
Interior/Exterior Lathing
|
5/7/2019
|
Not Ready for Inspection
|
DERRICK SPENCER
|
Light Gage Steel Frame
|
5/7/2019
|
Not Ready for Inspection
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
5/8/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Fireproofing
|
5/8/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
5/8/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Wood Construction
|
5/8/2019
|
Approved
|
DERRICK SPENCER
|
Floor/Roof Diaphrgm/Shear Wall
|
5/8/2019
|
Not Ready for Inspection
|
DERRICK SPENCER
|
Insulation
|
5/8/2019
|
Partial Approval
|
DERRICK SPENCER
|
Interior/Exterior Lathing
|
5/8/2019
|
Partial Approval
|
DERRICK SPENCER
|
Light Gage Steel Frame
|
5/8/2019
|
Not Ready for Inspection
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
5/9/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
5/9/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
5/9/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
5/9/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
5/9/2019
|
Partial Approval
|
TONY HARTONO
|
Floor/Roof Diaphrgm/Shear Wall
|
5/9/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
5/9/2019
|
Partial Approval
|
TONY HARTONO
|
Interior/Exterior Lathing
|
5/9/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
5/10/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
5/10/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
5/10/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
5/10/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
5/10/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Floor/Roof Diaphrgm/Shear Wall
|
5/10/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
5/10/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Interior/Exterior Lathing
|
5/10/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
5/10/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
5/13/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
5/13/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
5/13/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
5/13/2019
|
Approved
|
TONY HARTONO
|
Floor/Roof Diaphrgm/Shear Wall
|
5/13/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
5/13/2019
|
Partial Approval
|
TONY HARTONO
|
Interior/Exterior Lathing
|
5/13/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
5/13/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
5/14/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
5/14/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
5/14/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
5/14/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
5/14/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
5/14/2019
|
Partial Approval
|
TONY HARTONO
|
Floor/Roof Diaphrgm/Shear Wall
|
5/14/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
5/14/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
5/14/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
5/15/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
5/15/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
5/15/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
5/15/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
5/15/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
5/15/2019
|
Partial Inspection
|
TONY HARTONO
|
Insulation
|
5/15/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
5/16/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
5/16/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
5/16/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
5/16/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
5/16/2019
|
Approved
|
TONY HARTONO
|
Floor/Roof Diaphrgm/Shear Wall
|
5/16/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
5/16/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Interior/Exterior Lathing
|
5/16/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
5/16/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
5/17/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
5/17/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
5/17/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
5/17/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
5/17/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
5/17/2019
|
Partial Approval
|
TONY HARTONO
|
Floor/Roof Diaphrgm/Shear Wall
|
5/17/2019
|
Partial Approval
|
TONY HARTONO
|
Insulation
|
5/17/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
5/17/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
5/20/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
5/20/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
5/20/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
5/20/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
5/20/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
5/20/2019
|
Partial Approval
|
TONY HARTONO
|
Insulation
|
5/20/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Interior/Exterior Lathing
|
5/20/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
5/20/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
5/21/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
5/21/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
5/21/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
5/21/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
5/21/2019
|
Partial Approval
|
TONY HARTONO
|
Insulation
|
5/21/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
5/21/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
5/22/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
5/22/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
5/22/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
5/22/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
5/22/2019
|
Partial Approval
|
TONY HARTONO
|
Floor/Roof Diaphrgm/Shear Wall
|
5/22/2019
|
No Access for Inspection
|
TONY HARTONO
|
Insulation
|
5/22/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Interior/Exterior Lathing
|
5/22/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
5/23/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
5/23/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
5/23/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
5/23/2019
|
Approved
|
JASON BORUTA
|
Floor/Roof Diaphrgm/Shear Wall
|
5/23/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
5/23/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Interior/Exterior Lathing
|
5/23/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
5/23/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
5/24/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
5/24/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
5/24/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
5/24/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
5/24/2019
|
Partial Approval
|
TONY HARTONO
|
Floor/Roof Diaphrgm/Shear Wall
|
5/24/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
5/24/2019
|
Partial Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
5/24/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Reinforced Concrete Frame
|
5/24/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Pre-Stress Concrete
|
5/28/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
5/28/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
5/28/2019
|
Approved
|
TONY HARTONO
|
Floor/Roof Diaphrgm/Shear Wall
|
5/28/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
5/28/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Interior/Exterior Lathing
|
5/28/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
5/28/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
5/29/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
5/29/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
5/29/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
5/29/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
5/29/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
5/29/2019
|
Partial Approval
|
TONY HARTONO
|
Floor/Roof Diaphrgm/Shear Wall
|
5/29/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
5/29/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Interior/Exterior Lathing
|
5/29/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
5/29/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
5/30/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
5/30/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
5/30/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
5/30/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
5/30/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
5/30/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Floor/Roof Diaphrgm/Shear Wall
|
5/30/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
5/30/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Interior/Exterior Lathing
|
5/30/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
5/30/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
5/31/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
5/31/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
5/31/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
5/31/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
5/31/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
5/31/2019
|
Partial Approval
|
TONY HARTONO
|
Insulation
|
5/31/2019
|
Partial Approval
|
TONY HARTONO
|
Interior/Exterior Lathing
|
5/31/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
5/31/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
6/3/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Fireproofing
|
6/3/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
6/3/2019
|
Approved
|
DERRICK SPENCER
|
Floor/Roof Diaphrgm/Shear Wall
|
6/3/2019
|
Approved
|
DERRICK SPENCER
|
Insulation
|
6/3/2019
|
Partial Approval
|
DERRICK SPENCER
|
Interior/Exterior Lathing
|
6/3/2019
|
Not Ready for Inspection
|
DERRICK SPENCER
|
Light Gage Steel Frame
|
6/3/2019
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
6/4/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
6/4/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
6/4/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
6/4/2019
|
Approved
|
TONY HARTONO
|
Floor/Roof Diaphrgm/Shear Wall
|
6/4/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
6/4/2019
|
Partial Inspection
|
TONY HARTONO
|
Interior/Exterior Lathing
|
6/4/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
6/4/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
6/5/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
6/5/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
6/5/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
6/5/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
6/5/2019
|
Partial Approval
|
TONY HARTONO
|
Floor/Roof Diaphrgm/Shear Wall
|
6/5/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
6/5/2019
|
Partial Approval
|
TONY HARTONO
|
Interior/Exterior Lathing
|
6/5/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
6/5/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
6/6/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
6/6/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
6/6/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
6/6/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
6/6/2019
|
Partial Approval
|
TONY HARTONO
|
Insulation
|
6/6/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Interior/Exterior Lathing
|
6/6/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
6/6/2019
|
Partial Approval
|
TONY HARTONO
|
Reinforced Masonry Frame
|
6/6/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Structural Steel Frame
|
6/6/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
6/7/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
6/7/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
6/7/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
6/7/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
6/7/2019
|
Partial Approval
|
TONY HARTONO
|
Floor/Roof Diaphrgm/Shear Wall
|
6/7/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
6/7/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
6/10/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
6/10/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
6/10/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
6/10/2019
|
Approved
|
TONY HARTONO
|
Floor/Roof Diaphrgm/Shear Wall
|
6/10/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
6/10/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Interior/Exterior Lathing
|
6/10/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
6/10/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
6/11/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
6/11/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
6/11/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
6/11/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
6/11/2019
|
Partial Approval
|
TONY HARTONO
|
Floor/Roof Diaphrgm/Shear Wall
|
6/11/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
6/11/2019
|
Partial Approval
|
TONY HARTONO
|
Interior/Exterior Lathing
|
6/11/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
6/11/2019
|
Partial Approval
|
TONY HARTONO
|
Reinforced Masonry Frame
|
6/11/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
6/12/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
6/12/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
6/12/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
6/12/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
6/12/2019
|
Partial Approval
|
TONY HARTONO
|
Insulation
|
6/12/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Interior/Exterior Lathing
|
6/12/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
6/12/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
6/13/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
6/13/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
6/13/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
6/13/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
6/13/2019
|
Partial Approval
|
TONY HARTONO
|
Insulation
|
6/13/2019
|
Partial Approval
|
TONY HARTONO
|
Interior/Exterior Lathing
|
6/13/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
6/13/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
6/14/2019
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Fireproofing
|
6/14/2019
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Steel/Welding
|
6/14/2019
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Deputy Wood Construction
|
6/14/2019
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Floor/Roof Diaphrgm/Shear Wall
|
6/14/2019
|
Partial Inspection
|
DANIEL MC AULIFFE
|
Insulation
|
6/14/2019
|
Partial Inspection
|
DANIEL MC AULIFFE
|
Interior/Exterior Lathing
|
6/14/2019
|
Partial Inspection
|
DANIEL MC AULIFFE
|
Light Gage Steel Frame
|
6/14/2019
|
Partial Inspection
|
DANIEL MC AULIFFE
|
Deputy Drilled-In Anchors
|
6/17/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
6/17/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
6/17/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
6/17/2019
|
Approved
|
TONY HARTONO
|
Insulation
|
6/17/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
6/18/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
6/18/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
6/18/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
6/18/2019
|
Partial Approval
|
TONY HARTONO
|
Floor/Roof Diaphrgm/Shear Wall
|
6/18/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
6/18/2019
|
Partial Approval
|
TONY HARTONO
|
Interior/Exterior Lathing
|
6/18/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
6/18/2019
|
Approved
|
TONY HARTONO
|
Light Gage Steel Frame
|
6/18/2019
|
Partial Approval
|
TONY HARTONO
|
Reinforced Concrete Frame
|
6/18/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Reinforced Masonry Frame
|
6/18/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
6/19/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
6/19/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
6/19/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
6/19/2019
|
Approved
|
TONY HARTONO
|
Floor/Roof Diaphrgm/Shear Wall
|
6/19/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
6/19/2019
|
Approved
|
TONY HARTONO
|
Interior/Exterior Lathing
|
6/19/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
6/19/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
6/20/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
6/20/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
6/20/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
6/20/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
6/20/2019
|
Partial Approval
|
TONY HARTONO
|
Floor/Roof Diaphrgm/Shear Wall
|
6/20/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
6/20/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
6/20/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
6/21/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
6/21/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
6/21/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
6/21/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
6/21/2019
|
Partial Approval
|
TONY HARTONO
|
Floor/Roof Diaphrgm/Shear Wall
|
6/21/2019
|
Approved
|
TONY HARTONO
|
Insulation
|
6/21/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
6/21/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
6/24/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
6/24/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
6/24/2019
|
Partial Approval
|
TONY HARTONO
|
Insulation
|
6/24/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Interior/Exterior Lathing
|
6/24/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
6/24/2019
|
Partial Approval
|
TONY HARTONO
|
Drywall Nailing
|
6/25/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
6/25/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Interior/Exterior Lathing
|
6/25/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
6/25/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Reinforced Masonry Frame
|
6/25/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Floor/Roof Diaphrgm/Shear Wall
|
6/26/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
6/26/2019
|
Partial Inspection
|
TONY HARTONO
|
Interior/Exterior Lathing
|
6/26/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
6/26/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
6/27/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
6/27/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
6/27/2019
|
Partial Approval
|
TONY HARTONO
|
Insulation
|
6/27/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Interior/Exterior Lathing
|
6/27/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
6/27/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
6/28/2019
|
Approved
|
TED RIES
|
Deputy Steel/Welding
|
6/28/2019
|
Approved
|
TED RIES
|
Floor/Roof Diaphrgm/Shear Wall
|
6/28/2019
|
Not Ready for Inspection
|
TED RIES
|
Insulation
|
6/28/2019
|
Not Ready for Inspection
|
TED RIES
|
Light Gage Steel Frame
|
6/28/2019
|
Partial Approval
|
TED RIES
|
Deputy Drilled-In Anchors
|
7/1/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
7/1/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
7/1/2019
|
Partial Approval
|
TONY HARTONO
|
Insulation
|
7/1/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Interior/Exterior Lathing
|
7/1/2019
|
Partial Approval
|
TONY HARTONO
|
Reinforced Masonry Frame
|
7/1/2019
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
7/2/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
7/2/2019
|
Approved
|
TONY HARTONO
|
Interior/Exterior Lathing
|
7/2/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
7/2/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
7/3/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
7/3/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
7/3/2019
|
Approved
|
TONY HARTONO
|
Insulation
|
7/3/2019
|
Partial Approval
|
TONY HARTONO
|
Interior/Exterior Lathing
|
7/3/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
7/3/2019
|
Partial Approval
|
TONY HARTONO
|
Reinforced Concrete Frame
|
7/3/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
7/8/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
7/8/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
7/8/2019
|
Approved
|
TONY HARTONO
|
Insulation
|
7/8/2019
|
Partial Approval
|
TONY HARTONO
|
Interior/Exterior Lathing
|
7/8/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
7/8/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
7/9/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
7/9/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
7/9/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
7/9/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
7/9/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
7/9/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
7/10/2019
|
Conditional Approval
|
JASON BORUTA
|
Deputy Fireproofing
|
7/10/2019
|
Conditional Approval
|
JASON BORUTA
|
Deputy Steel/Welding
|
7/10/2019
|
Conditional Approval
|
JASON BORUTA
|
Drywall Nailing
|
7/10/2019
|
Not Ready for Inspection
|
JASON BORUTA
|
Insulation
|
7/10/2019
|
Not Ready for Inspection
|
JASON BORUTA
|
Interior/Exterior Lathing
|
7/10/2019
|
Not Ready for Inspection
|
JASON BORUTA
|
Light Gage Steel Frame
|
7/10/2019
|
Not Ready for Inspection
|
JASON BORUTA
|
Deputy Drilled-In Anchors
|
7/11/2019
|
Approved
|
NICK LAROCCA
|
Deputy Fireproofing
|
7/11/2019
|
Approved
|
NICK LAROCCA
|
Deputy Steel/Welding
|
7/11/2019
|
Approved
|
NICK LAROCCA
|
Drywall Nailing
|
7/11/2019
|
Partial Approval
|
NICK LAROCCA
|
Insulation
|
7/11/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
Light Gage Steel Frame
|
7/11/2019
|
Partial Approval
|
NICK LAROCCA
|
Reinforced Concrete Frame
|
7/11/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
Deputy Drilled-In Anchors
|
7/12/2019
|
Approved
|
JONATHAN ALLEN
|
Deputy Fireproofing
|
7/12/2019
|
Approved
|
JONATHAN ALLEN
|
Deputy Steel/Welding
|
7/12/2019
|
Approved
|
JONATHAN ALLEN
|
Insulation
|
7/12/2019
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
Interior/Exterior Lathing
|
7/12/2019
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
Light Gage Steel Frame
|
7/12/2019
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
Deputy Drilled-In Anchors
|
7/15/2019
|
Approved
|
SORIN CIRSTOIU
|
Deputy Fireproofing
|
7/15/2019
|
Approved
|
SORIN CIRSTOIU
|
Deputy Steel/Welding
|
7/15/2019
|
Approved
|
SORIN CIRSTOIU
|
Floor/Roof Diaphrgm/Shear Wall
|
7/15/2019
|
Not Ready for Inspection
|
SORIN CIRSTOIU
|
Insulation
|
7/15/2019
|
Not Ready for Inspection
|
SORIN CIRSTOIU
|
Interior/Exterior Lathing
|
7/15/2019
|
Not Ready for Inspection
|
SORIN CIRSTOIU
|
Light Gage Steel Frame
|
7/15/2019
|
Not Ready for Inspection
|
SORIN CIRSTOIU
|
Deputy Drilled-In Anchors
|
7/16/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
7/16/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
7/16/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
7/16/2019
|
Approved
|
TONY HARTONO
|
Insulation
|
7/16/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Interior/Exterior Lathing
|
7/16/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
7/16/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
7/17/2019
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
7/17/2019
|
Conditional Approval
|
TONY HARTONO
|
Deputy Fireproofing
|
7/17/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
7/17/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
7/17/2019
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
7/18/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
7/18/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
7/18/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
7/18/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
7/18/2019
|
Partial Inspection
|
TONY HARTONO
|
Floor/Roof Diaphrgm/Shear Wall
|
7/18/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
7/18/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Interior/Exterior Lathing
|
7/18/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
7/18/2019
|
Partial Approval
|
TONY HARTONO
|
Masonry Wall/Backfill
|
7/18/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Reinforced Concrete Frame
|
7/18/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
7/19/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
7/19/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
7/19/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
7/19/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
7/19/2019
|
Partial Approval
|
TONY HARTONO
|
Insulation
|
7/19/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
7/19/2019
|
Partial Approval
|
TONY HARTONO
|
Masonry Wall/Backfill
|
7/19/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
7/22/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
7/22/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
7/22/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
7/22/2019
|
Partial Inspection
|
TONY HARTONO
|
Insulation
|
7/22/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
7/22/2019
|
Partial Approval
|
TONY HARTONO
|
Reinforced Concrete Frame
|
7/22/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
7/23/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Masonry
|
7/23/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
7/23/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
7/23/2019
|
Approved
|
TONY HARTONO
|
Interior/Exterior Lathing
|
7/23/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
7/23/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
7/24/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Masonry
|
7/24/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
7/24/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
7/24/2019
|
Approved
|
TONY HARTONO
|
Insulation
|
7/24/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
7/24/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
7/25/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Masonry
|
7/25/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
7/25/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
7/25/2019
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
7/26/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Masonry
|
7/26/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
7/26/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
7/26/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
7/26/2019
|
Partial Approval
|
TONY HARTONO
|
Floor/Roof Diaphrgm/Shear Wall
|
7/26/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
7/26/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
7/26/2019
|
Partial Approval
|
TONY HARTONO
|
Masonry Wall/Backfill
|
7/26/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Reinforced Concrete Frame
|
7/26/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
7/29/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
7/29/2019
|
Approved
|
TONY HARTONO
|
Insulation
|
7/29/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
7/29/2019
|
Partial Approval
|
TONY HARTONO
|
Masonry Wall/Backfill
|
7/29/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
7/30/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
7/30/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
7/30/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
7/30/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
7/30/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
7/30/2019
|
Partial Approval
|
TONY HARTONO
|
Insulation
|
7/30/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
7/30/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
7/31/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
7/31/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
7/31/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
7/31/2019
|
Conditional Approval
|
TONY HARTONO
|
Deputy Wood Construction
|
7/31/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
7/31/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
7/31/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
7/31/2019
|
Partial Approval
|
TONY HARTONO
|
Reinforced Concrete Frame
|
7/31/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
8/1/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
8/1/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
8/1/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
8/1/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
8/1/2019
|
Approved
|
TONY HARTONO
|
Insulation
|
8/1/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
8/1/2019
|
Partial Approval
|
TONY HARTONO
|
Masonry Wall/Backfill
|
8/1/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
8/2/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
8/2/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
8/2/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
8/2/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
8/2/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
8/2/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
8/2/2019
|
Partial Approval
|
TONY HARTONO
|
Masonry Wall/Backfill
|
8/2/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
8/5/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
8/5/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
8/5/2019
|
Approved
|
TONY HARTONO
|
Insulation
|
8/5/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
8/5/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
8/6/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Masonry
|
8/6/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
8/6/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
8/6/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
8/6/2019
|
Partial Approval
|
TONY HARTONO
|
Interior/Exterior Lathing
|
8/6/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
8/7/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
8/7/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Masonry
|
8/7/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
8/7/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
8/7/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
8/7/2019
|
Partial Approval
|
TONY HARTONO
|
Insulation
|
8/7/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
8/7/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
8/8/2019
|
Approved
|
TED RIES
|
Deputy Reinf. Masonry
|
8/8/2019
|
Approved
|
TED RIES
|
Deputy Wood Construction
|
8/8/2019
|
Approved
|
TED RIES
|
Light Gage Steel Frame
|
8/8/2019
|
Partial Inspection
|
TED RIES
|
Deputy Drilled-In Anchors
|
8/9/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Masonry
|
8/9/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
8/9/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
8/9/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
8/9/2019
|
Partial Approval
|
TONY HARTONO
|
Insulation
|
8/9/2019
|
Partial Approval
|
TONY HARTONO
|
Interior/Exterior Lathing
|
8/9/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
8/9/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
8/13/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
8/13/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
8/13/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
8/13/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
8/13/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
8/14/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
8/14/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
8/14/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
8/14/2019
|
Partial Approval
|
TONY HARTONO
|
Insulation
|
8/14/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
8/14/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
8/15/2019
|
Approved
|
NICK LAROCCA
|
Deputy Reinf. Concrete
|
8/15/2019
|
Approved
|
NICK LAROCCA
|
Deputy Wood Construction
|
8/15/2019
|
Approved
|
NICK LAROCCA
|
Insulation
|
8/15/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
Light Gage Steel Frame
|
8/15/2019
|
Partial Approval
|
NICK LAROCCA
|
Deputy Drilled-In Anchors
|
8/16/2019
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
8/16/2019
|
Conditional Approval
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
8/16/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
8/16/2019
|
Conditional Approval
|
TONY HARTONO
|
Deputy Wood Construction
|
8/16/2019
|
Approved
|
TONY HARTONO
|
Insulation
|
8/16/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
8/16/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
8/19/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
8/19/2019
|
Approved
|
DERRICK SPENCER
|
Insulation
|
8/19/2019
|
Not Ready for Inspection
|
DERRICK SPENCER
|
Light Gage Steel Frame
|
8/19/2019
|
Partial Approval
|
DERRICK SPENCER
|
Reinforced Concrete Frame
|
8/19/2019
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
8/20/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
8/20/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
8/20/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
8/21/2019
|
Approved
|
TED RIES
|
Deputy Reinf. Concrete
|
8/21/2019
|
Approved
|
TED RIES
|
Drywall Nailing
|
8/21/2019
|
Partial Inspection
|
TED RIES
|
Insulation
|
8/21/2019
|
Partial Approval
|
TED RIES
|
Light Gage Steel Frame
|
8/21/2019
|
Partial Inspection
|
TED RIES
|
Deputy Drilled-In Anchors
|
8/22/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Fireproofing
|
8/22/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
8/22/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
8/22/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
8/23/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Fireproofing
|
8/23/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
8/23/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
8/23/2019
|
Approved
|
DERRICK SPENCER
|
Drywall Nailing
|
8/23/2019
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
8/26/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Fireproofing
|
8/26/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
8/26/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Masonry
|
8/26/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
8/26/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Wood Construction
|
8/26/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
8/27/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
8/27/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Masonry
|
8/27/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Wood Construction
|
8/27/2019
|
Approved
|
DERRICK SPENCER
|
Drywall Nailing
|
8/27/2019
|
Partial Approval
|
DERRICK SPENCER
|
Insulation
|
8/27/2019
|
Partial Approval
|
DERRICK SPENCER
|
Masonry Wall/Backfill
|
8/27/2019
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
8/28/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
8/28/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Masonry
|
8/28/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Wood Construction
|
8/28/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
8/29/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
8/29/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Masonry
|
8/29/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
8/29/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Wood Construction
|
8/29/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
8/30/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
8/30/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Masonry
|
8/30/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
8/30/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Wood Construction
|
8/30/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
9/3/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
9/3/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
9/4/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
9/4/2019
|
Approved
|
DERRICK SPENCER
|
Drywall Nailing
|
9/4/2019
|
Partial Approval
|
DERRICK SPENCER
|
Light Gage Steel Frame
|
9/4/2019
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
9/5/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
9/5/2019
|
Approved
|
DERRICK SPENCER
|
Insulation
|
9/5/2019
|
Partial Approval
|
DERRICK SPENCER
|
Light Gage Steel Frame
|
9/5/2019
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
9/6/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
9/6/2019
|
Approved
|
DERRICK SPENCER
|
Drywall Nailing
|
9/9/2019
|
Partial Approval
|
DERRICK SPENCER
|
Excavation/Setback/Form/Re-Bar
|
9/9/2019
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
9/10/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
9/10/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
9/10/2019
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
9/11/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Masonry
|
9/11/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
9/11/2019
|
Approved
|
DERRICK SPENCER
|
Drywall Nailing
|
9/11/2019
|
Partial Approval
|
DERRICK SPENCER
|
Light Gage Steel Frame
|
9/11/2019
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
9/12/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Masonry
|
9/12/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
9/12/2019
|
Approved
|
DERRICK SPENCER
|
Light Gage Steel Frame
|
9/12/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
9/13/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Masonry
|
9/13/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
9/13/2019
|
Approved
|
TONY HARTONO
|
Light Gage Steel Frame
|
9/13/2019
|
Partial Approval
|
TONY HARTONO
|
Piling/Pier/Caisson
|
9/13/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
9/16/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
9/16/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
9/16/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
9/16/2019
|
Partial Approval
|
TONY HARTONO
|
Piling/Pier/Caisson
|
9/16/2019
|
Partial Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
9/17/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
9/17/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Masonry
|
9/17/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
9/17/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
9/17/2019
|
Partial Approval
|
TONY HARTONO
|
Masonry Wall/Backfill
|
9/17/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
9/18/2019
|
Conditional Approval
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
9/18/2019
|
Conditional Approval
|
TONY HARTONO
|
Deputy Reinf. Masonry
|
9/18/2019
|
Conditional Approval
|
TONY HARTONO
|
Deputy Steel/Welding
|
9/18/2019
|
Conditional Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
9/19/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
9/19/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Masonry
|
9/19/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
9/19/2019
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
9/20/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
9/20/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Masonry
|
9/20/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
9/20/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
9/20/2019
|
Partial Approval
|
TONY HARTONO
|
Reinforced Concrete Frame
|
9/20/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
9/23/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
9/23/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Masonry
|
9/23/2019
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
9/24/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
9/24/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Masonry
|
9/24/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
9/24/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
9/24/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
9/25/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
9/25/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Masonry
|
9/25/2019
|
Approved
|
TONY HARTONO
|
Insulation
|
9/25/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Masonry Wall/Backfill
|
9/25/2019
|
Partial Approval
|
TONY HARTONO
|
Reinforced Concrete Frame
|
9/25/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
9/26/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
9/26/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Masonry
|
9/26/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
9/26/2019
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
9/27/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
9/27/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Masonry
|
9/27/2019
|
Approved
|
TONY HARTONO
|
Drywall Nailing
|
9/27/2019
|
Partial Approval
|
TONY HARTONO
|
Insulation
|
9/27/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
9/27/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Drywall Nailing
|
10/1/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
10/1/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Drywall Nailing
|
10/3/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
10/3/2019
|
Partial Approval
|
TONY HARTONO
|
SWPPP-Const. Storm Water
|
10/3/2019
|
Completed
|
TONY HARTONO
|
Light Gage Steel Frame
|
10/4/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
10/7/2019
|
Partial Approval
|
TONY HARTONO
|
Drywall Nailing
|
10/8/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
10/8/2019
|
Partial Approval
|
TONY HARTONO
|
Drywall Nailing
|
10/11/2019
|
Partial Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
10/11/2019
|
Partial Approval
|
TONY HARTONO
|
Drywall Nailing
|
10/15/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
10/15/2019
|
Partial Approval
|
TONY HARTONO
|
Drywall Nailing
|
10/16/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
10/16/2019
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
10/17/2019
|
Partial Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
10/18/2019
|
Partial Approval
|
TONY HARTONO
|
Drywall Nailing
|
10/22/2019
|
Partial Approval
|
DERRICK SPENCER
|
Light Gage Steel Frame
|
10/22/2019
|
Partial Approval
|
DERRICK SPENCER
|
Light Gage Steel Frame
|
10/23/2019
|
Partial Approval
|
DERRICK SPENCER
|
Light Gage Steel Frame
|
10/25/2019
|
Partial Approval
|
DERRICK SPENCER
|
Drywall Nailing
|
10/28/2019
|
Partial Approval
|
DERRICK SPENCER
|
Light Gage Steel Frame
|
10/28/2019
|
Partial Approval
|
DERRICK SPENCER
|
Structural Steel Frame
|
10/28/2019
|
Partial Approval
|
DERRICK SPENCER
|
Insulation
|
11/4/2019
|
Partial Approval
|
DERRICK SPENCER
|
Insulation
|
11/5/2019
|
Partial Approval
|
DERRICK SPENCER
|
Insulation
|
11/7/2019
|
Partial Approval
|
DERRICK SPENCER
|
Light Gage Steel Frame
|
11/7/2019
|
Partial Approval
|
DERRICK SPENCER
|
Green Building Final
|
11/13/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
11/14/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Reinf. Concrete
|
11/14/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
11/14/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
11/15/2019
|
Approved
|
TED RIES
|
Smoke Detectors
|
11/15/2019
|
Not Ready for Inspection
|
TED RIES
|
Light Gage Steel Frame
|
11/19/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
Drywall Nailing
|
11/20/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
Final
|
11/20/2019
|
Corrections Issued
|
JEFF BYTHEWAY
|
Footing/Foundation/Slab
|
11/20/2019
|
Approved
|
JEFF BYTHEWAY
|
Reinforced Concrete Frame
|
11/20/2019
|
Approved
|
JEFF BYTHEWAY
|
SGSOV-Seismic Gas S/O Valve
|
11/20/2019
|
SGSOV Not Ready
|
JEFF BYTHEWAY
|
SUSMP-Std. Urban Storm Water
|
11/20/2019
|
Approved
|
JEFF BYTHEWAY
|
Smoke Detectors
|
11/20/2019
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
Structural Steel Frame
|
11/20/2019
|
Approved
|
JEFF BYTHEWAY
|
Deputy Reinf. Concrete
|
11/22/2019
|
Approved
|
JEFF BYTHEWAY
|
Pre-Inspection
|
11/22/2019
|
Approved
|
JEFF BYTHEWAY
|
Light Gage Steel Frame
|
11/25/2019
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
Special/Order Compliance
|
11/25/2019
|
Approved
|
JEFF BYTHEWAY
|
Light Gage Steel Frame
|
11/27/2019
|
Partial Inspection
|
JEFF BYTHEWAY
|
Light Gage Steel Frame
|
12/3/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
Drywall Nailing
|
12/9/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
Light Gage Steel Frame
|
12/12/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
Drywall Nailing
|
12/18/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
Light Gage Steel Frame
|
12/18/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
Light Gage Steel Frame
|
12/20/2019
|
Conditional Approval
|
JEFF BYTHEWAY
|
Drywall Nailing
|
12/23/2019
|
Partial Approval
|
TED RIES
|
Light Gage Steel Frame
|
12/23/2019
|
Partial Approval
|
TED RIES
|
Special/Order Compliance
|
12/26/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
Light Gage Steel Frame
|
1/2/2020
|
Corrections Issued
|
JEFF BYTHEWAY
|
Light Gage Steel Frame
|
1/8/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
Drywall Nailing
|
1/13/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
Insulation
|
1/15/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
Light Gage Steel Frame
|
1/16/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
Drywall Nailing
|
1/30/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
Light Gage Steel Frame
|
1/30/2020
|
Partial Inspection
|
JEFF BYTHEWAY
|
Pre-Inspection
|
2/4/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
Light Gage Steel Frame
|
2/7/2020
|
Partial Inspection
|
JEFF BYTHEWAY
|
Final
|
2/11/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
SGSOV-Seismic Gas S/O Valve
|
2/11/2020
|
SGSOV Approved
|
JEFF BYTHEWAY
|
Smoke Detectors
|
2/11/2020
|
Approved
|
JEFF BYTHEWAY
|
Special/Order Compliance
|
2/13/2020
|
Conditional Approval
|
JEFF BYTHEWAY
|
Light Gage Steel Frame
|
2/27/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
Light Gage Steel Frame
|
3/2/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
Pre-Inspection
|
3/16/2020
|
Approved
|
JEFF BYTHEWAY
|
Pre-Inspection
|
3/23/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
Pre-Inspection
|
3/27/2020
|
Approved
|
JEFF BYTHEWAY
|
Pre-Inspection
|
4/2/2020
|
Approved
|
JEFF BYTHEWAY
|
Pre-Inspection
|
4/8/2020
|
Partial Inspection
|
JEFF BYTHEWAY
|
Pre-Inspection
|
4/10/2020
|
Partial Inspection
|
JEFF BYTHEWAY
|
Pre-Inspection
|
5/1/2020
|
Approved
|
JEFF BYTHEWAY
|
Pre-Inspection
|
5/18/2020
|
Approved
|
JEFF BYTHEWAY
|
Insulation
|
5/22/2020
|
Approved
|
JEFF BYTHEWAY
|
Special/Order Compliance
|
5/27/2020
|
Approved
|
JEFF BYTHEWAY
|
Light Gage Steel Frame
|
5/29/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
Drywall Nailing
|
6/2/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
Pre-Inspection
|
6/5/2020
|
Approved
|
JEFF BYTHEWAY
|
Final
|
6/18/2020
|
Partial Inspection
|
JEFF BYTHEWAY
|
Final
|
6/23/2020
|
Partial Inspection
|
JEFF BYTHEWAY
|
Final
|
6/30/2020
|
Partial Inspection
|
JEFF BYTHEWAY
|
Final
|
7/2/2020
|
Conditional Approval
|
JEFF BYTHEWAY
|