850 S LA BREA AVE 1-53 90036

Certificate Information: 850 S LA BREA AVE 1-53 90036

Application / Permit
16010-10000-05471
Plan Check / Job No.
B16LA18957
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
NEW 7 STORY MIXED USE III-A APARTMENT (53 UNITS) OVER I-A RETAIL/RESTAURANT/BEAUTY PARLOR (CORE & SHELL ONLY) OVER 1 LEVEL SUBTERRANEAN PARKING PER TOC TIER 3. (6 EXTERMELY LOW INCOME UNITS).
Permit Issued
Issued on 6/16/2020
Issuing Office
West Los Angeles
Current Status
CofO Issued on 5/2/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/8/2016 APPLICANT
Assigned to Plan Check Engineer 12/29/2016 ARMEN JIVALAGIAN
Corrections Issued 1/11/2017 ARMEN JIVALAGIAN
Quality Review Completed 1/25/2017 BILL STUTSMAN
Building Plans Picked Up 2/14/2018 APPLICANT
Applicant returned to address corrections 11/1/2019 ARMEN JIVALAGIAN
Applicant returned to address corrections 2/4/2020 ARMEN JIVALAGIAN
Applicant returned to address corrections 2/5/2020 ARMEN JIVALAGIAN
Plan Check Approved 2/11/2020 ARMEN JIVALAGIAN
Issued 6/16/2020 LADBS
TCO Issued (Expire Date: 04-15-2024) 10/18/2023 ERNESTO CORRAL
CofO Issued 5/2/2024 ADAM BURGESS
Permit Finaled 5/2/2024 ADAM BURGESS

Permit Application Clearance Information

Address approval Cleared 11/14/2018 ADRIAN SANCHEZ
Bicycle Parking Cleared 11/14/2018 ADRIAN SANCHEZ
Comm Cor/Mini-Mall Cleared 11/14/2018 ANNA VAN
Comm Cor/Mini-Mall Cleared 11/14/2018 ANNA VAN
Comm Cor/Mini-Mall Cleared 11/14/2018 ANNA VAN
Miscellaneous Cleared 11/14/2018 ANNA VAN
Miscellaneous Cleared 11/14/2018 ANNA VAN
Opn space landscape/Water mgmt Cleared 11/14/2018 ANNA VAN
Site Plan review Cleared 11/14/2018 ANNA VAN
ZA Case Cleared 11/14/2018 ANNA VAN
Eng Process Fee Ord 176,300 Cleared 7/26/2019 ELAINE LEI
Hydrant and Access approval Cleared 9/24/2019 ROBERT DUFF
Internal circulation Cleared 9/26/2019 MOHAMMAD HASAN
Highway dedication Cleared 9/27/2019 ELENA LOPEZ
Permit Cleared 9/27/2019 ELENA LOPEZ
Fire Marshall Fire Life Safety Cleared 10/1/2019 WILLIAM JOHNS
Trees in Parkway Cleared 10/1/2019 JOHN KIM
CPC Cleared 10/2/2019 JOSE ROMERO-NAVARRO
Food establishment approval Cleared 10/4/2019 LACDHS APPROVED
Green Code Cleared 10/9/2019 ARMEN JIVALAGIAN
Food Service Establishment Cleared 11/6/2019 KENNETH BROWNE
Methane Ordinance Cleared 11/7/2019 WILLIAM JOHNS
Low Impact Development Cleared 11/14/2019 MARTIN FRAGOSO
Roof/Waste drainage to street Cleared 11/15/2019 ELAINE LEI
Sewer availability Cleared 11/15/2019 ELAINE LEI
Building over 3-story or 36-ft Cleared 11/19/2019 CALOSHA APPROVED
Driveway location Cleared 11/19/2019 MOHAMMAD HASAN
Excavation more than 5-ft deep Cleared 11/19/2019 CALOSHA APPROVED
DAS Clearance Cleared 11/20/2019 ARMEN JIVALAGIAN
Density Bonus 12.22.A.31 Cleared 12/4/2019 NICHOLAS KAWAZOE
Work Adjacent to Public Way Cleared 12/19/2019 ROSA SILVA
Construction near power lines Cleared 1/30/2020 RIDWAN HARDY

Contact Information

Architect Abrahams,, Bob; Lic. No.: C30213 731 INDIANA AVENUE      VENICE, CA 90291
Contractor Halco Construction; Lic. No.: 408574-B 11040 SANTA MONICA BLVD #400      LOS ANGELES, CA 90025
Engineer Aoanan,, Virgilio Cendana; Lic. No.: C36079 1041 S GARFIELD AVE STE #210      ALHAMBRA, CA 91801
Engineer Babayan,, Raffi Samuel; Lic. No.: C72168 7718 DAY STREET      LOS ANGELES, CA 91042
Engineer Benichou,, Ety; Lic. No.: S5263 888 S FIGUEROA ST 18TH FLOOR      LOS ANGELES, CA 90017

Inspector Information

EDWIN GREGORYONA, (213) 482-7357 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Reinf. Concrete 7/28/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/29/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/30/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/31/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/11/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/12/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/13/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/14/2020 Conditional Approval JONATHAN QUACH
Special/Order Compliance 9/24/2020 No Access for Inspection LARRY ARNICK
Deputy Methane Barrier 10/15/2020 Conditional Approval LARRY ARNICK
Deputy Methane Barrier 10/16/2020 Conditional Approval DAVID BURKHEAD
Deputy Methane Barrier 10/23/2020 Conditional Approval LARRY ARNICK
Deputy Methane Barrier 10/29/2020 Conditional Approval LARRY ARNICK
Deputy Methane Barrier 10/30/2020 Conditional Approval JONATHAN QUACH
Deputy Methane Barrier 11/4/2020 Conditional Approval JONATHAN QUACH
Excavation/Setback/Form/Re-Bar 12/8/2020 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 12/8/2020 Partial Approval EDWIN GREGORYONA
METHANE-Barrier 12/8/2020 Partial Inspection EDWIN GREGORYONA
METHANE-Final 12/8/2020 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 12/8/2020 Partial Inspection EDWIN GREGORYONA
METHANE-Subgrade 12/8/2020 Partial Inspection EDWIN GREGORYONA
Piling/Pier/Caisson 12/8/2020 Partial Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 12/16/2020 Conditional Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 12/28/2020 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 12/30/2020 Not Ready for Inspection LARRY ARNICK
Green Building Rough 12/30/2020 Not Ready for Inspection LARRY ARNICK
METHANE-Rough 12/30/2020 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 12/30/2020 Partial Inspection LARRY ARNICK
Verify Sprinkler Sign Off 12/30/2020 Not Ready for Inspection LARRY ARNICK
Excavation/Setback/Form/Re-Bar 12/31/2020 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 12/31/2020 Not Ready for Inspection LARRY ARNICK
Deputy Shotcrete 1/4/2021 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 1/4/2021 Not Ready for Inspection JAMES POWERS
METHANE-Barrier 1/4/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 1/4/2021 Partial Approval JAMES POWERS
Deputy Shotcrete 1/5/2021 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 1/5/2021 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 1/5/2021 Not Ready for Inspection LARRY ARNICK
Green Building Rough 1/5/2021 Not Ready for Inspection LARRY ARNICK
Insulation 1/5/2021 Not Ready for Inspection LARRY ARNICK
METHANE-Rough 1/5/2021 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 1/5/2021 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 1/5/2021 Not Ready for Inspection LARRY ARNICK
Deputy Shotcrete 1/6/2021 Conditional Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 1/11/2021 Partial Approval LARRY ARNICK
Green Building Rough 1/11/2021 Not Ready for Inspection LARRY ARNICK
METHANE-Rough 1/11/2021 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 1/11/2021 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 1/11/2021 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Masonry 1/20/2021 Conditional Approval LARRY ARNICK
Green Building Rough 1/25/2021 Not Ready for Inspection LARRY ARNICK
METHANE-Rough 1/25/2021 Not Ready for Inspection LARRY ARNICK
Reinforced Masonry Frame 1/25/2021 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 1/25/2021 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Masonry 1/26/2021 Conditional Approval LARRY ARNICK
Masonry Wall/Backfill 1/26/2021 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 2/1/2021 Not Ready for Inspection LARRY ARNICK
Footing/Foundation/Slab 2/1/2021 Partial Approval LARRY ARNICK
Green Building Rough 2/1/2021 Not Ready for Inspection LARRY ARNICK
METHANE-Barrier 2/1/2021 Not Ready for Inspection LARRY ARNICK
METHANE-Rough 2/1/2021 Not Ready for Inspection LARRY ARNICK
METHANE-Subgrade 2/1/2021 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 2/1/2021 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 2/1/2021 Not Ready for Inspection LARRY ARNICK
Wall Anchors 2/1/2021 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 2/3/2021 Conditional Approval LARRY ARNICK
Special/Order Compliance 2/19/2021 Approved EDWIN GREGORYONA
Deputy Reinf. Concrete 2/26/2021 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 2/26/2021 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 2/26/2021 Partial Approval EDWIN GREGORYONA
METHANE-Barrier 2/26/2021 Partial Inspection EDWIN GREGORYONA
METHANE-Subgrade 2/26/2021 Partial Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 3/2/2021 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 3/3/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 3/11/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 3/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/19/2021 Partial Approval EDWIN GREGORYONA
Green Building Rough 3/22/2021 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 3/22/2021 Partial Inspection EDWIN GREGORYONA
Masonry Wall/Backfill 3/22/2021 Partial Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 3/22/2021 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 3/22/2021 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 3/25/2021 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 3/26/2021 Partial Approval EDWIN GREGORYONA
Green Building Rough 3/26/2021 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 3/26/2021 Approved EDWIN GREGORYONA
Masonry Wall/Backfill 3/26/2021 Partial Approval EDWIN GREGORYONA
Reinforced Concrete Frame 3/26/2021 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 3/26/2021 Not Ready for Inspection EDWIN GREGORYONA
Deputy Methane Barrier 3/30/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/1/2021 Partial Approval EDWIN GREGORYONA
Green Building Rough 4/6/2021 Not Ready for Inspection EDWIN GREGORYONA
Masonry Wall/Backfill 4/6/2021 Partial Approval EDWIN GREGORYONA
Reinforced Masonry Frame 4/6/2021 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 4/6/2021 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Masonry 4/7/2021 Partial Approval EDWIN GREGORYONA
Green Building Rough 4/21/2021 Partial Inspection EDWIN GREGORYONA
Masonry Wall/Backfill 4/21/2021 Partial Approval EDWIN GREGORYONA
Reinforced Masonry Frame 4/21/2021 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 4/21/2021 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Masonry 4/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/4/2021 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 5/13/2021 Not Ready for Inspection EDWIN GREGORYONA
Green Building Rough 5/13/2021 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 5/13/2021 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 5/13/2021 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 5/18/2021 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 5/19/2021 Partial Approval EDWIN GREGORYONA
Green Building Rough 5/19/2021 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 5/19/2021 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 5/20/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/1/2021 Conditional Approval JONATHAN QUACH
Deputy Reinf. Concrete 6/1/2021 Conditional Approval RUSSELL BONVOULOIR
Green Building Rough 6/1/2021 Not Ready for Inspection JONATHAN QUACH
Reinforced Concrete Frame 6/1/2021 Partial Approval JONATHAN QUACH
Verify Sprinkler Sign Off 6/1/2021 Not Ready for Inspection JONATHAN QUACH
Reinforced Concrete Frame 6/2/2021 Partial Approval JONATHAN QUACH
Green Building Rough 6/7/2021 Not Ready for Inspection EDWIN GREGORYONA
Masonry Wall/Backfill 6/7/2021 Partial Approval EDWIN GREGORYONA
Reinforced Masonry Frame 6/7/2021 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 6/7/2021 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 6/8/2021 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 6/16/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 6/22/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 6/29/2021 Partial Approval EDWIN GREGORYONA
Green Building Rough 6/30/2021 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 6/30/2021 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 6/30/2021 Not Ready for Inspection EDWIN GREGORYONA
Green Building Rough 7/6/2021 Not Ready for Inspection JONATHAN QUACH
Reinforced Concrete Frame 7/6/2021 Partial Approval JONATHAN QUACH
Verify Sprinkler Sign Off 7/6/2021 Not Ready for Inspection JONATHAN QUACH
Deputy Reinf. Concrete 7/8/2021 Conditional Approval JONATHAN QUACH
Deputy Reinf. Concrete 7/13/2021 Partial Approval EDWIN GREGORYONA
Green Building Rough 7/13/2021 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 7/13/2021 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 7/13/2021 Not Ready for Inspection EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 8/18/2021 Partial Approval EDWIN GREGORYONA
Wall Anchors 8/18/2021 Not Ready for Inspection EDWIN GREGORYONA
Wood Frame 8/18/2021 Not Ready for Inspection EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 9/14/2021 Partial Approval EDWIN GREGORYONA
Wood Frame 9/14/2021 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 10/13/2021 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 10/13/2021 Partial Approval EDWIN GREGORYONA
Wood Frame 10/13/2021 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 11/10/2021 Partial Approval EDWIN GREGORYONA
Pre-Inspection 11/10/2021 Approved EDWIN GREGORYONA
Wood Frame 11/10/2021 Not Ready for Inspection EDWIN GREGORYONA
Deputy Wood Construction 11/15/2021 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 11/15/2021 Partial Approval EDWIN GREGORYONA
Wood Frame 11/15/2021 Partial Approval EDWIN GREGORYONA
Pre-Inspection 11/23/2021 Approved EDWIN GREGORYONA
Wood Frame 11/23/2021 Not Ready for Inspection EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 12/9/2021 Partial Approval EDWIN GREGORYONA
Wood Frame 12/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 12/16/2021 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 12/16/2021 Partial Approval EDWIN GREGORYONA
Wood Frame 12/16/2021 Not Ready for Inspection EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 1/18/2022 Partial Approval EDWIN GREGORYONA
Wood Frame 1/18/2022 Not Ready for Inspection EDWIN GREGORYONA
Deputy Wood Construction 1/24/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 2/3/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 2/3/2022 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 2/3/2022 Not Ready for Inspection EDWIN GREGORYONA
Drywall Nailing 2/4/2022 Not Ready for Inspection EDWIN GREGORYONA
Pre-Inspection 2/4/2022 Not Ready for Inspection EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 2/9/2022 Partial Approval EDWIN GREGORYONA
Wood Frame 2/9/2022 Not Ready for Inspection EDWIN GREGORYONA
Drywall Nailing 2/14/2022 Partial Inspection EDWIN GREGORYONA
Drywall Nailing 2/23/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 3/30/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/1/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 4/21/2022 Partial Approval EDWIN GREGORYONA
Wood Frame 4/21/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 5/16/2022 Partial Inspection EDWIN GREGORYONA
Light Gage Steel Frame 6/14/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 6/28/2022 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 7/1/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 7/13/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 7/13/2022 Not Ready for Inspection EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 7/20/2022 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 7/20/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 7/22/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 7/26/2022 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 7/26/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 8/2/2022 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 8/2/2022 Partial Inspection EDWIN GREGORYONA
Interior/Exterior Lathing 8/8/2022 Partial Inspection EDWIN GREGORYONA
Drywall Nailing 9/7/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 9/20/2022 Not Ready for Inspection EDWIN GREGORYONA
Drywall Nailing 9/23/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 12/9/2022 Conditional Approval MICHAEL ROSENBERG
Green Building Rough 12/28/2022 Approved EDWIN GREGORYONA
Insulation 12/28/2022 Not Ready for Inspection EDWIN GREGORYONA
Light Gage Steel Frame 12/28/2022 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 12/28/2022 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 12/28/2022 Approved EDWIN GREGORYONA
Wall Anchors 12/28/2022 Approved EDWIN GREGORYONA
Special/Order Compliance 1/12/2023 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 3/3/2023 Partial Approval EDWIN GREGORYONA
Final 3/30/2023 Not Ready for Inspection EDWIN GREGORYONA
Footing/Foundation/Slab 3/30/2023 Approved EDWIN GREGORYONA
Green Building Final 3/30/2023 Not Ready for Inspection EDWIN GREGORYONA
Interior/Exterior Lathing 3/30/2023 Approved EDWIN GREGORYONA
METHANE-Barrier 3/30/2023 Approved EDWIN GREGORYONA
METHANE-Subgrade 3/30/2023 Approved EDWIN GREGORYONA
Reinforced Concrete Frame 3/30/2023 Approved EDWIN GREGORYONA
Reinforced Masonry Frame 3/30/2023 Approved EDWIN GREGORYONA
SGSOV-Seismic Gas S/O Valve 3/30/2023 SGSOV Not Ready EDWIN GREGORYONA
Smoke Detectors 3/30/2023 Not Ready for Inspection EDWIN GREGORYONA
Final 10/3/2023 Partial Inspection EDWIN GREGORYONA
Green Building Final 10/3/2023 Approved EDWIN GREGORYONA
SGSOV-Seismic Gas S/O Valve 10/3/2023 SGSOV Approved EDWIN GREGORYONA
Smoke Detectors 10/3/2023 Approved EDWIN GREGORYONA
Final 10/12/2023 OK for TCO EDWIN GREGORYONA
Special/Order Compliance 3/20/2024 Approved EDWIN GREGORYONA