2441 S SEPULVEDA BLVD 90064

Certificate Information: 2441 S SEPULVEDA BLVD 90064

Application / Permit
16010-10004-01422
Plan Check / Job No.
B17LA08551
Group
Building
Type
Bldg-Addition
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
Supplemental permit to permit no. 16010-10000-01422 to add one level ,new floor area , revsie building design and structural details ( no change in total project valuation)
Permit Issued
Issued on 11/3/2017
Issuing Office
Metro
Current Status
Permit Finaled on 5/29/2020
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 6/2/2017 APPLICANT
Assigned to Plan Check Engineer 6/22/2017 ALLEN MANALANSAN
Green Plans Picked Up 6/28/2017 APPLICANT
Disabled Access Plans Picked Up 7/20/2017 APPLICANT
Corrections Issued 7/21/2017 ALLEN MANALANSAN
Quality Review Completed 7/27/2017 CHARLES CHANG
Building Plans Picked Up 7/31/2017 APPLICANT
Applicant returned to address corrections 8/8/2017 ALLEN MANALANSAN
Applicant returned to address corrections 8/17/2017 SAI KHUM
Applicant returned to address corrections 9/11/2017 SAI KHUM
Applicant returned to address corrections 10/12/2017 ALLEN MANALANSAN
Applicant returned to address corrections 10/16/2017 SAI KHUM
Applicant returned to address corrections 10/24/2017 SAI KHUM
Plan Check Approved 11/3/2017 SAI KHUM
Issued 11/3/2017 LADBS
Permit Finaled 5/29/2020 JEFF BYTHEWAY

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 8/7/2017 ROCHELLE DUNGCA
Metro Rail approval Cleared 8/7/2017 ASPET DAVIDIAN
Low Impact Development Cleared 8/10/2017 RYAN HUDSON
Housing density bonus Cleared 8/17/2017 NICHOLAS KAWAZOE
Sewer availability Cleared 10/11/2017 HISASHI KOBAYAKAWA
GPI Written Notices Cleared 10/16/2017 SAI KHUM
DAS Clearance Cleared 10/19/2017 EDDIE GARIN
Fire Marshall Fire Life Safety Cleared 10/19/2017 DOMINIQUE MEDINA
Hydrant and Access approval Cleared 10/19/2017 ROBERT DUFF
Green Code Cleared 10/20/2017 JOHN KLARIN
"Q" conditions Cleared 10/24/2017 BRIDGETTE WOOTEN
"T" removal Cleared 10/24/2017 BRIDGETTE WOOTEN
CPC Cleared 10/24/2017 BRIDGETTE WOOTEN
CPC Cleared 10/24/2017 BRIDGETTE WOOTEN
CPC Cleared 10/24/2017 BRIDGETTE WOOTEN
Driveway location Cleared 10/24/2017 PEDRO AYALA
Internal circulation Cleared 10/24/2017 PEDRO AYALA
Internal circulation Cleared 10/24/2017 PEDRO AYALA
Miscellaneous Cleared 10/24/2017 BRIDGETTE WOOTEN
Opn space landscape/Water mgmt Cleared 10/24/2017 BRIDGETTE WOOTEN
Site Plan review Cleared 10/24/2017 BRIDGETTE WOOTEN
Specific Plan Cleared 10/24/2017 PEDRO AYALA
Tract Map conditions Cleared 10/24/2017 BRIDGETTE WOOTEN
Tract Map conditions Cleared 10/24/2017 BRIDGETTE WOOTEN
ZA Case Cleared 10/24/2017 BRIDGETTE WOOTEN
ZI Cleared 10/24/2017 BRIDGETTE WOOTEN
Building over 3-story or 36-ft Cleared 10/25/2017 CALOSHA APPROVED

Contact Information

Architect Van, Tilburg Johannes F P; Lic. No.: C6457 1738 BERKELEY STREET      SANTA MONICA, CA 90404
Contractor Cp Multifamily Construction California, Inc.; Lic. No.: 1023819-B 1000 SANSOME STREET   1ST FLOOR    SAN FRANCISCO, CA 94111
Engineer Hardy, Mark David; Lic. No.: C36538 1552 EIGHTEENTH ST      SANTA MONICA, CA 90404
Engineer Hassan, Mohamed Ali; Lic. No.: S5285 3621 HARBOR BLVD STE 125      SANTA ANA, CA 92704
Engineer Hill, Edward Foster; Lic. No.: GE2126 GEOTECH 439 WESTERN AVE      GLENDALE, CA 91201

Inspector Information

PAUL DAVIDSON, (310) 914-3914 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Green Building Rough 2/15/2018 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 2/15/2018 Partial Approval TONY HARTONO
Reinforced Masonry Frame 2/15/2018 Partial Approval TONY HARTONO
Reinforced Masonry Frame 2/16/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 2/21/2018 Not Ready for Inspection TONY HARTONO
Green Building Rough 2/22/2018 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 2/22/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 2/22/2018 Partial Approval TONY HARTONO
Reinforced Masonry Frame 2/26/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 2/28/2018 Partial Approval TONY HARTONO
Green Building Rough 3/2/2018 Approved TONY HARTONO
Reinforced Concrete Frame 3/2/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 3/2/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 3/5/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 3/6/2018 Partial Approval TONY HARTONO
Reinforced Masonry Frame 3/7/2018 Partial Approval TONY HARTONO
Reinforced Concrete Frame 3/9/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 3/9/2018 Partial Approval TONY HARTONO
Reinforced Concrete Frame 3/14/2018 Partial Approval TONY HARTONO
Reinforced Masonry Frame 3/14/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 3/15/2018 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 3/16/2018 Partial Approval TONY HARTONO
Reinforced Masonry Frame 3/16/2018 Partial Approval TONY HARTONO
Footing/Foundation/Slab 3/19/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 3/19/2018 Partial Approval TONY HARTONO
Reinforced Masonry Frame 3/20/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 3/21/2018 Partial Approval TONY HARTONO
Reinforced Masonry Frame 3/22/2018 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 3/23/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 3/23/2018 Not Ready for Inspection TONY HARTONO
Footing/Foundation/Slab 3/27/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 3/27/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 3/28/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 3/29/2018 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 3/30/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 3/30/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 4/2/2018 Partial Approval JONATHAN ALLEN
Footing/Foundation/Slab 4/3/2018 Partial Approval TONY HARTONO
Reinforced Masonry Frame 4/3/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 4/4/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 4/5/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 4/6/2018 Not Ready for Inspection TONY HARTONO
Deputy Reinf. Concrete 4/9/2018 Approved TONY HARTONO
Deputy Shotcrete 4/9/2018 Approved TONY HARTONO
Footing/Foundation/Slab 4/9/2018 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 4/9/2018 Approved TONY HARTONO
Reinforced Masonry Frame 4/9/2018 Not Ready for Inspection TONY HARTONO
Deputy Reinf. Concrete 4/10/2018 Approved TONY HARTONO
Deputy Shotcrete 4/10/2018 Approved TONY HARTONO
Reinforced Masonry Frame 4/10/2018 Not Ready for Inspection TONY HARTONO
Deputy Reinf. Concrete 4/11/2018 Approved TONY HARTONO
Deputy Shotcrete 4/11/2018 Approved TONY HARTONO
Reinforced Masonry Frame 4/11/2018 Partial Approval TONY HARTONO
Deputy Reinf. Concrete 4/12/2018 Approved TONY HARTONO
Deputy Shotcrete 4/12/2018 Approved TONY HARTONO
Reinforced Masonry Frame 4/12/2018 Not Ready for Inspection TONY HARTONO
Deputy Reinf. Concrete 4/13/2018 Approved TONY HARTONO
Deputy Shotcrete 4/13/2018 Approved TONY HARTONO
Footing/Foundation/Slab 4/13/2018 Partial Approval TONY HARTONO
Deputy Drilled-In Anchors 4/16/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 4/16/2018 Approved TONY HARTONO
Deputy Shotcrete 4/16/2018 Approved TONY HARTONO
Footing/Foundation/Slab 4/16/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 4/16/2018 Partial Inspection TONY HARTONO
Deputy Drilled-In Anchors 4/17/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 4/17/2018 Approved TONY HARTONO
Deputy Shotcrete 4/17/2018 Approved TONY HARTONO
Reinforced Masonry Frame 4/17/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 4/18/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 4/18/2018 Approved TONY HARTONO
Deputy Shotcrete 4/18/2018 Approved TONY HARTONO
Reinforced Masonry Frame 4/18/2018 Partial Inspection TONY HARTONO
Deputy Drilled-In Anchors 4/19/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 4/19/2018 Approved TONY HARTONO
Deputy Shotcrete 4/19/2018 Approved TONY HARTONO
Reinforced Masonry Frame 4/19/2018 Partial Approval TONY HARTONO
Deputy Drilled-In Anchors 4/20/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 4/20/2018 Approved TONY HARTONO
Deputy Shotcrete 4/20/2018 Approved TONY HARTONO
Footing/Foundation/Slab 4/20/2018 Partial Approval TONY HARTONO
Reinforced Masonry Frame 4/20/2018 Partial Approval TONY HARTONO
Deputy Reinf. Concrete 4/23/2018 Approved TONY HARTONO
Reinforced Masonry Frame 4/23/2018 Not Ready for Inspection TONY HARTONO
Deputy Reinf. Concrete 4/24/2018 Approved TONY HARTONO
Reinforced Masonry Frame 4/24/2018 Not Ready for Inspection TONY HARTONO
Deputy Reinf. Concrete 4/25/2018 Approved TONY HARTONO
Reinforced Masonry Frame 4/25/2018 Not Ready for Inspection TONY HARTONO
Deputy Reinf. Concrete 4/26/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 4/27/2018 Approved TONY HARTONO
Footing/Foundation/Slab 4/27/2018 Partial Approval TONY HARTONO
Reinforced Masonry Frame 4/27/2018 Not Ready for Inspection TONY HARTONO
Deputy Pre-Stress Concrete 4/30/2018 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 4/30/2018 Approved SORIN CIRSTOIU
Reinforced Masonry Frame 4/30/2018 Partial Inspection SORIN CIRSTOIU
Structural Steel Frame 4/30/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 4/30/2018 Not Ready for Inspection TONY HARTONO
Deputy Pre-Stress Concrete 5/1/2018 Approved JOHN DODGE
Deputy Reinf. Concrete 5/1/2018 Approved JOHN DODGE
Reinforced Masonry Frame 5/1/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 5/1/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 5/1/2018 Partial Inspection TONY HARTONO
Deputy Pre-Stress Concrete 5/2/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 5/2/2018 Approved TONY HARTONO
Reinforced Masonry Frame 5/2/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 5/2/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 5/2/2018 Not Ready for Inspection TONY HARTONO
Deputy Pre-Stress Concrete 5/3/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 5/3/2018 Approved TONY HARTONO
Footing/Foundation/Slab 5/3/2018 Partial Inspection TONY HARTONO
Reinforced Masonry Frame 5/3/2018 Partial Inspection TONY HARTONO
Structural Steel Frame 5/3/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 5/3/2018 Not Ready for Inspection TONY HARTONO
Deputy Pre-Stress Concrete 5/4/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 5/4/2018 Approved TONY HARTONO
Reinforced Masonry Frame 5/4/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 5/4/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 5/4/2018 Not Ready for Inspection TONY HARTONO
Deputy Pre-Stress Concrete 5/7/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 5/7/2018 Approved TONY HARTONO
Footing/Foundation/Slab 5/7/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 5/7/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 5/7/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 5/7/2018 Not Ready for Inspection TONY HARTONO
Deputy Pre-Stress Concrete 5/8/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 5/8/2018 Approved TONY HARTONO
Reinforced Masonry Frame 5/8/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 5/8/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 5/8/2018 Not Ready for Inspection TONY HARTONO
Deputy Pre-Stress Concrete 5/9/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 5/9/2018 Partial Approval PAUL DAVIDSON
Deputy Reinf. Concrete 5/9/2018 Partial Approval PAUL DAVIDSON
Footing/Foundation/Slab 5/9/2018 Partial Approval TONY HARTONO
Reinforced Masonry Frame 5/9/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 5/9/2018 Not Ready for Inspection TONY HARTONO
Deputy Pre-Stress Concrete 5/10/2018 Approved JASON BORUTA
Deputy Pre-Stress Concrete 5/10/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 5/10/2018 Approved JASON BORUTA
Footing/Foundation/Slab 5/10/2018 Partial Approval TONY HARTONO
Reinforced Masonry Frame 5/10/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 5/10/2018 Not Ready for Inspection TONY HARTONO
Deputy Pre-Stress Concrete 5/11/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 5/11/2018 Approved TONY HARTONO
Footing/Foundation/Slab 5/11/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 5/11/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 5/11/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 5/11/2018 Not Ready for Inspection TONY HARTONO
Deputy Pre-Stress Concrete 5/14/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 5/14/2018 Approved TONY HARTONO
Reinforced Masonry Frame 5/14/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 5/14/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 5/14/2018 Partial Inspection TONY HARTONO
Deputy Pre-Stress Concrete 5/15/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 5/15/2018 Approved TONY HARTONO
Reinforced Masonry Frame 5/15/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 5/15/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 5/15/2018 Not Ready for Inspection TONY HARTONO
Deputy Pre-Stress Concrete 5/16/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 5/16/2018 Approved TONY HARTONO
Reinforced Masonry Frame 5/16/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 5/16/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 5/16/2018 Not Ready for Inspection TONY HARTONO
Deputy Pre-Stress Concrete 5/17/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 5/17/2018 Approved TONY HARTONO
Footing/Foundation/Slab 5/17/2018 Partial Approval TONY HARTONO
Reinforced Masonry Frame 5/17/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 5/17/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 5/17/2018 Not Ready for Inspection TONY HARTONO
Deputy Pre-Stress Concrete 5/18/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 5/18/2018 Approved TONY HARTONO
Reinforced Concrete Frame 5/18/2018 Partial Approval TONY HARTONO
Deputy Pre-Stress Concrete 5/21/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 5/21/2018 Approved TONY HARTONO
Structural Steel Frame 5/21/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 5/21/2018 Not Ready for Inspection TONY HARTONO
Deputy Pre-Stress Concrete 5/22/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 5/22/2018 Approved TONY HARTONO
Reinforced Concrete Frame 5/22/2018 Partial Approval TONY HARTONO
Structural Steel Frame 5/22/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 5/22/2018 Not Ready for Inspection TONY HARTONO
Deputy Pre-Stress Concrete 5/23/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 5/23/2018 Approved TONY HARTONO
Reinforced Masonry Frame 5/23/2018 Partial Approval TONY HARTONO
Structural Steel Frame 5/23/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 5/23/2018 Not Ready for Inspection TONY HARTONO
Deputy Pre-Stress Concrete 5/24/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 5/24/2018 Approved TONY HARTONO
Footing/Foundation/Slab 5/24/2018 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 5/24/2018 Partial Approval TONY HARTONO
Reinforced Masonry Frame 5/24/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 5/24/2018 Not Ready for Inspection TONY HARTONO
Deputy Pre-Stress Concrete 5/25/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 5/25/2018 Approved TONY HARTONO
Reinforced Concrete Frame 5/25/2018 Partial Approval TONY HARTONO
Reinforced Masonry Frame 5/25/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 5/25/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 5/25/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 5/29/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 5/29/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 5/29/2018 Approved TONY HARTONO
Deputy Shotcrete 5/29/2018 Approved TONY HARTONO
Reinforced Masonry Frame 5/29/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 5/29/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 5/29/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 5/30/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 5/30/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 5/30/2018 Approved TONY HARTONO
Deputy Shotcrete 5/30/2018 Approved TONY HARTONO
Reinforced Concrete Frame 5/30/2018 Partial Approval TONY HARTONO
Structural Steel Frame 5/30/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 5/30/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 5/31/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 5/31/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 5/31/2018 Approved TONY HARTONO
Deputy Shotcrete 5/31/2018 Approved TONY HARTONO
Reinforced Masonry Frame 5/31/2018 Partial Approval TONY HARTONO
Structural Steel Frame 5/31/2018 Partial Inspection TONY HARTONO
Wall Anchors 5/31/2018 Partial Approval TONY HARTONO
Deputy Drilled-In Anchors 6/1/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 6/1/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 6/1/2018 Approved TONY HARTONO
Deputy Shotcrete 6/1/2018 Approved TONY HARTONO
Footing/Foundation/Slab 6/1/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 6/1/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 6/1/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 6/1/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 6/4/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 6/4/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 6/4/2018 Approved TONY HARTONO
Deputy Shotcrete 6/4/2018 Approved TONY HARTONO
Reinforced Concrete Frame 6/4/2018 Partial Approval TONY HARTONO
Reinforced Masonry Frame 6/4/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 6/4/2018 Partial Inspection TONY HARTONO
Wall Anchors 6/4/2018 Partial Inspection TONY HARTONO
Deputy Drilled-In Anchors 6/5/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 6/5/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 6/5/2018 Approved TONY HARTONO
Deputy Shotcrete 6/5/2018 Approved TONY HARTONO
Reinforced Masonry Frame 6/5/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 6/5/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 6/5/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 6/6/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 6/6/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 6/6/2018 Approved TONY HARTONO
Deputy Shotcrete 6/6/2018 Approved TONY HARTONO
Reinforced Masonry Frame 6/6/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 6/6/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 6/6/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 6/7/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 6/7/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 6/7/2018 Approved TONY HARTONO
Deputy Shotcrete 6/7/2018 Approved TONY HARTONO
Reinforced Masonry Frame 6/7/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 6/7/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 6/7/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 6/8/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 6/8/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 6/8/2018 Approved TONY HARTONO
Deputy Shotcrete 6/8/2018 Approved TONY HARTONO
Footing/Foundation/Slab 6/8/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 6/8/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 6/8/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 6/8/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 6/11/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 6/11/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 6/11/2018 Approved TONY HARTONO
Deputy Shotcrete 6/11/2018 Approved TONY HARTONO
Reinforced Concrete Frame 6/11/2018 Partial Approval TONY HARTONO
Reinforced Masonry Frame 6/11/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 6/11/2018 Approved TONY HARTONO
Wall Anchors 6/11/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 6/12/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 6/12/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 6/12/2018 Approved TONY HARTONO
Deputy Shotcrete 6/12/2018 Approved TONY HARTONO
Reinforced Masonry Frame 6/12/2018 Partial Approval TONY HARTONO
Structural Steel Frame 6/12/2018 Partial Inspection TONY HARTONO
Wall Anchors 6/12/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 6/13/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 6/13/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 6/13/2018 Approved TONY HARTONO
Deputy Shotcrete 6/13/2018 Approved TONY HARTONO
Reinforced Masonry Frame 6/13/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 6/13/2018 Partial Inspection TONY HARTONO
Wall Anchors 6/13/2018 Partial Inspection TONY HARTONO
Deputy Drilled-In Anchors 6/14/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 6/14/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 6/14/2018 Approved TONY HARTONO
Deputy Shotcrete 6/14/2018 Approved TONY HARTONO
Reinforced Concrete Frame 6/14/2018 Partial Approval TONY HARTONO
Reinforced Masonry Frame 6/14/2018 Partial Approval TONY HARTONO
Structural Steel Frame 6/14/2018 Partial Inspection TONY HARTONO
Wall Anchors 6/14/2018 Partial Inspection TONY HARTONO
Deputy Drilled-In Anchors 6/15/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 6/15/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 6/15/2018 Approved TONY HARTONO
Deputy Shotcrete 6/15/2018 Approved TONY HARTONO
Footing/Foundation/Slab 6/15/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 6/15/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 6/15/2018 Partial Inspection TONY HARTONO
Wall Anchors 6/15/2018 Partial Inspection TONY HARTONO
Deputy Drilled-In Anchors 6/18/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 6/18/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 6/18/2018 Approved TONY HARTONO
Deputy Shotcrete 6/18/2018 Approved TONY HARTONO
Reinforced Concrete Frame 6/18/2018 Partial Approval TONY HARTONO
Reinforced Masonry Frame 6/18/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 6/18/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 6/18/2018 Partial Approval TONY HARTONO
Deputy Drilled-In Anchors 6/19/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 6/19/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 6/19/2018 Approved TONY HARTONO
Deputy Shotcrete 6/19/2018 Approved TONY HARTONO
Reinforced Masonry Frame 6/19/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 6/19/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 6/19/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 6/20/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 6/20/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 6/20/2018 Approved TONY HARTONO
Deputy Shotcrete 6/20/2018 Approved TONY HARTONO
Reinforced Masonry Frame 6/20/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 6/20/2018 Partial Inspection TONY HARTONO
Wall Anchors 6/20/2018 Partial Inspection TONY HARTONO
Deputy Drilled-In Anchors 6/21/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 6/21/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 6/21/2018 Approved TONY HARTONO
Deputy Shotcrete 6/21/2018 Approved TONY HARTONO
Reinforced Masonry Frame 6/21/2018 Partial Approval TONY HARTONO
Structural Steel Frame 6/21/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 6/21/2018 Partial Approval TONY HARTONO
Deputy Drilled-In Anchors 6/22/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 6/22/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 6/22/2018 Approved TONY HARTONO
Deputy Shotcrete 6/22/2018 Approved TONY HARTONO
Footing/Foundation/Slab 6/22/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 6/22/2018 Order to Comply Issued TONY HARTONO
Structural Steel Frame 6/22/2018 Partial Inspection TONY HARTONO
Wall Anchors 6/22/2018 Not Ready for Inspection TONY HARTONO
Deputy Pre-Stress Concrete 6/25/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 6/25/2018 Approved TONY HARTONO
Reinforced Concrete Frame 6/25/2018 Partial Approval TONY HARTONO
Reinforced Masonry Frame 6/25/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 6/25/2018 Partial Inspection TONY HARTONO
Wall Anchors 6/25/2018 Partial Inspection TONY HARTONO
Deputy Pre-Stress Concrete 6/26/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 6/26/2018 Approved TONY HARTONO
Reinforced Masonry Frame 6/26/2018 Partial Approval TONY HARTONO
Structural Steel Frame 6/26/2018 Partial Inspection TONY HARTONO
Wall Anchors 6/26/2018 Partial Inspection TONY HARTONO
Deputy Pre-Stress Concrete 6/27/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 6/27/2018 Approved TONY HARTONO
Reinforced Masonry Frame 6/27/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 6/27/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 6/27/2018 Not Ready for Inspection TONY HARTONO
Deputy Pre-Stress Concrete 6/28/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 6/28/2018 Approved TONY HARTONO
Floor/Roof Diaphrgm/Shear Wall 6/28/2018 Partial Approval TONY HARTONO
Structural Steel Frame 6/28/2018 Partial Approval TONY HARTONO
Wall Anchors 6/28/2018 Partial Approval TONY HARTONO
Deputy Pre-Stress Concrete 6/29/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 6/29/2018 Approved TONY HARTONO
Footing/Foundation/Slab 6/29/2018 Approved TONY HARTONO
Reinforced Masonry Frame 6/29/2018 Partial Inspection TONY HARTONO
Structural Steel Frame 6/29/2018 Partial Inspection TONY HARTONO
Wall Anchors 6/29/2018 Partial Approval TONY HARTONO
Deputy Drilled-In Anchors 7/2/2018 Approved JASON BORUTA
Deputy Drilled-In Anchors 7/2/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 7/2/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 7/2/2018 Approved JASON BORUTA
Deputy Reinf. Concrete 7/2/2018 Approved TONY HARTONO
Deputy Shotcrete 7/2/2018 Approved JASON BORUTA
Reinforced Concrete Frame 7/2/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 7/2/2018 Partial Approval TONY HARTONO
Structural Steel Frame 7/2/2018 Partial Approval TONY HARTONO
Wall Anchors 7/2/2018 Partial Approval TONY HARTONO
Deputy Drilled-In Anchors 7/3/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 7/3/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 7/3/2018 Approved TONY HARTONO
Deputy Shotcrete 7/3/2018 Approved TONY HARTONO
Footing/Foundation/Slab 7/3/2018 Partial Approval TONY HARTONO
Reinforced Masonry Frame 7/3/2018 Partial Approval TONY HARTONO
Structural Steel Frame 7/3/2018 Partial Approval TONY HARTONO
Wall Anchors 7/3/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 7/5/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 7/5/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 7/5/2018 Approved TONY HARTONO
Deputy Shotcrete 7/5/2018 Approved TONY HARTONO
Footing/Foundation/Slab 7/5/2018 Partial Approval TONY HARTONO
Structural Steel Frame 7/5/2018 Partial Approval TONY HARTONO
Wall Anchors 7/5/2018 Partial Inspection TONY HARTONO
Deputy Drilled-In Anchors 7/6/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 7/6/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 7/6/2018 Approved TONY HARTONO
Deputy Shotcrete 7/6/2018 Approved TONY HARTONO
Footing/Foundation/Slab 7/6/2018 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 7/6/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 7/6/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 7/6/2018 Partial Inspection TONY HARTONO
Wall Anchors 7/6/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 7/9/2018 Approved TONY HARTONO
Deputy Fireproofing 7/9/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 7/9/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 7/9/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 7/9/2018 Approved TONY HARTONO
Deputy Shotcrete 7/9/2018 Approved TONY HARTONO
Reinforced Masonry Frame 7/9/2018 Partial Inspection TONY HARTONO
Structural Steel Frame 7/9/2018 Partial Inspection TONY HARTONO
Wall Anchors 7/9/2018 Partial Inspection TONY HARTONO
Deputy Drilled-In Anchors 7/10/2018 Approved TONY HARTONO
Deputy Fireproofing 7/10/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 7/10/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 7/10/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 7/10/2018 Approved TONY HARTONO
Deputy Shotcrete 7/10/2018 Approved TONY HARTONO
Footing/Foundation/Slab 7/10/2018 Partial Approval TONY HARTONO
Reinforced Masonry Frame 7/10/2018 Partial Inspection TONY HARTONO
Structural Steel Frame 7/10/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 7/10/2018 Partial Inspection TONY HARTONO
Deputy Drilled-In Anchors 7/11/2018 Approved TONY HARTONO
Deputy Fireproofing 7/11/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 7/11/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 7/11/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 7/11/2018 Approved TONY HARTONO
Deputy Shotcrete 7/11/2018 Approved TONY HARTONO
Footing/Foundation/Slab 7/11/2018 Partial Approval TONY HARTONO
Structural Steel Frame 7/11/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 7/11/2018 Partial Approval TONY HARTONO
Deputy Drilled-In Anchors 7/12/2018 Approved TONY HARTONO
Deputy Fireproofing 7/12/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 7/12/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 7/12/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 7/12/2018 Approved TONY HARTONO
Deputy Shotcrete 7/12/2018 Approved TONY HARTONO
Reinforced Masonry Frame 7/12/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 7/12/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 7/12/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 7/13/2018 Approved TONY HARTONO
Deputy Fireproofing 7/13/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 7/13/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 7/13/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 7/13/2018 Approved TONY HARTONO
Deputy Shotcrete 7/13/2018 Approved TONY HARTONO
Footing/Foundation/Slab 7/13/2018 Partial Inspection TONY HARTONO
Reinforced Concrete Frame 7/13/2018 Partial Approval TONY HARTONO
Reinforced Masonry Frame 7/13/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 7/13/2018 Partial Inspection TONY HARTONO
Wall Anchors 7/13/2018 Partial Inspection TONY HARTONO
Deputy Drilled-In Anchors 7/16/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 7/16/2018 Approved TONY HARTONO
Deputy Shotcrete 7/16/2018 Approved TONY HARTONO
Wall Anchors 7/16/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 7/17/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 7/17/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 7/17/2018 Approved TONY HARTONO
Deputy Shotcrete 7/17/2018 Approved TONY HARTONO
Wall Anchors 7/17/2018 Partial Inspection TONY HARTONO
Deputy Drilled-In Anchors 7/18/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 7/18/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 7/18/2018 Approved TONY HARTONO
Deputy Shotcrete 7/18/2018 Approved TONY HARTONO
Wall Anchors 7/18/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 7/19/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 7/19/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 7/19/2018 Approved TONY HARTONO
Deputy Shotcrete 7/19/2018 Approved TONY HARTONO
Footing/Foundation/Slab 7/19/2018 Partial Approval TONY HARTONO
Reinforced Concrete Frame 7/19/2018 Partial Approval TONY HARTONO
Wall Anchors 7/19/2018 Partial Inspection TONY HARTONO
Deputy Drilled-In Anchors 7/20/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 7/20/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 7/20/2018 Approved TONY HARTONO
Deputy Shotcrete 7/20/2018 Approved TONY HARTONO
Reinforced Masonry Frame 7/20/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 7/20/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 7/20/2018 Partial Approval TONY HARTONO
Reinforced Masonry Frame 7/23/2018 Not Ready for Inspection DERRICK SPENCER
Structural Steel Frame 7/23/2018 Not Ready for Inspection DERRICK SPENCER
Wall Anchors 7/23/2018 Not Ready for Inspection DERRICK SPENCER
Footing/Foundation/Slab 7/24/2018 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 7/24/2018 Partial Approval TONY HARTONO
Reinforced Masonry Frame 7/24/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 7/24/2018 Partial Inspection TONY HARTONO
Wall Anchors 7/24/2018 Partial Inspection TONY HARTONO
Reinforced Masonry Frame 7/25/2018 Partial Approval TONY HARTONO
Structural Steel Frame 7/25/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 7/25/2018 Approved TONY HARTONO
Reinforced Masonry Frame 7/26/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 7/26/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 7/26/2018 Partial Inspection TONY HARTONO
Footing/Foundation/Slab 7/27/2018 Not Ready for Inspection TONY HARTONO
Light Gage Steel Frame 7/27/2018 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 7/27/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 7/27/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 7/27/2018 Partial Inspection TONY HARTONO
Wall Anchors 7/27/2018 Not Ready for Inspection TONY HARTONO
Light Gage Steel Frame 7/30/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 7/30/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 7/30/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 7/30/2018 Partial Inspection TONY HARTONO
Light Gage Steel Frame 7/31/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 7/31/2018 Partial Inspection TONY HARTONO
Structural Steel Frame 7/31/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 7/31/2018 Not Ready for Inspection TONY HARTONO
Light Gage Steel Frame 8/1/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 8/1/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 8/1/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 8/1/2018 Not Ready for Inspection TONY HARTONO
Footing/Foundation/Slab 8/2/2018 Partial Approval TONY HARTONO
Reinforced Concrete Frame 8/2/2018 Partial Approval TONY HARTONO
Reinforced Masonry Frame 8/2/2018 Partial Approval TONY HARTONO
Structural Steel Frame 8/2/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 8/2/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 8/3/2018 Not Ready for Inspection DERRICK SPENCER
Structural Steel Frame 8/3/2018 Not Ready for Inspection DERRICK SPENCER
Wall Anchors 8/3/2018 Not Ready for Inspection DERRICK SPENCER
Deputy Pre-Stress Concrete 8/6/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 8/6/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 8/6/2018 Approved TONY HARTONO
Reinforced Masonry Frame 8/6/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 8/6/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 8/6/2018 Partial Inspection TONY HARTONO
Deputy Drilled-In Anchors 8/7/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 8/7/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 8/7/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 8/7/2018 Approved TONY HARTONO
Reinforced Masonry Frame 8/7/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 8/7/2018 Partial Inspection TONY HARTONO
Wall Anchors 8/7/2018 Partial Inspection TONY HARTONO
Deputy Drilled-In Anchors 8/8/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 8/8/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 8/8/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 8/8/2018 Approved TONY HARTONO
Reinforced Masonry Frame 8/8/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 8/8/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 8/8/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 8/9/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 8/9/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 8/9/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 8/9/2018 Approved TONY HARTONO
Reinforced Masonry Frame 8/9/2018 Partial Approval TONY HARTONO
Structural Steel Frame 8/9/2018 Partial Inspection TONY HARTONO
Wall Anchors 8/9/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 8/10/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 8/10/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 8/10/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 8/10/2018 Approved TONY HARTONO
Reinforced Concrete Frame 8/10/2018 Partial Approval TONY HARTONO
Reinforced Masonry Frame 8/10/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 8/10/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 8/10/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 8/13/2018 Approved TONY HARTONO
Deputy Steel/Welding 8/13/2018 Approved TONY HARTONO
Reinforced Masonry Frame 8/13/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 8/13/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 8/13/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 8/14/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 8/14/2018 Conditional Approval JASON BORUTA
Deputy Pre-Stress Concrete 8/14/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 8/14/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 8/14/2018 Approved TONY HARTONO
Deputy Steel/Welding 8/14/2018 Conditional Approval JASON BORUTA
Footing/Foundation/Slab 8/14/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 8/14/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 8/14/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 8/14/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 8/15/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 8/15/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 8/15/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 8/15/2018 Approved TONY HARTONO
Deputy Steel/Welding 8/15/2018 Approved TONY HARTONO
Reinforced Masonry Frame 8/15/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 8/15/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 8/15/2018 Partial Inspection TONY HARTONO
Deputy Drilled-In Anchors 8/16/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 8/16/2018 Conditional Approval JASON BORUTA
Deputy Pre-Stress Concrete 8/16/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 8/16/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 8/16/2018 Approved TONY HARTONO
Deputy Steel/Welding 8/16/2018 Conditional Approval JASON BORUTA
Reinforced Concrete Frame 8/16/2018 Partial Approval TONY HARTONO
Reinforced Masonry Frame 8/16/2018 Partial Approval TONY HARTONO
Structural Steel Frame 8/16/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 8/16/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 8/17/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 8/17/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 8/17/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 8/17/2018 Approved TONY HARTONO
Deputy Steel/Welding 8/17/2018 Approved TONY HARTONO
Light Gage Steel Frame 8/17/2018 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 8/17/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 8/17/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 8/17/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 8/17/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 8/20/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 8/20/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 8/20/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 8/20/2018 Approved TONY HARTONO
Deputy Steel/Welding 8/20/2018 Approved TONY HARTONO
Footing/Foundation/Slab 8/20/2018 Not Ready for Inspection TONY HARTONO
Light Gage Steel Frame 8/20/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 8/20/2018 Partial Inspection TONY HARTONO
Structural Steel Frame 8/20/2018 Partial Inspection TONY HARTONO
Wall Anchors 8/20/2018 Partial Inspection TONY HARTONO
Deputy Drilled-In Anchors 8/21/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 8/21/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 8/21/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 8/21/2018 Approved TONY HARTONO
Deputy Steel/Welding 8/21/2018 Approved TONY HARTONO
Light Gage Steel Frame 8/21/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 8/21/2018 Partial Approval TONY HARTONO
Structural Steel Frame 8/21/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 8/21/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 8/22/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 8/22/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 8/22/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 8/22/2018 Approved TONY HARTONO
Deputy Steel/Welding 8/22/2018 Approved TONY HARTONO
Footing/Foundation/Slab 8/22/2018 Not Ready for Inspection JASON BORUTA
Light Gage Steel Frame 8/22/2018 Not Ready for Inspection JASON BORUTA
Reinforced Concrete Frame 8/22/2018 Not Ready for Inspection JASON BORUTA
Reinforced Masonry Frame 8/22/2018 Not Ready for Inspection JASON BORUTA
Structural Steel Frame 8/22/2018 Not Ready for Inspection JASON BORUTA
Wall Anchors 8/22/2018 Not Ready for Inspection JASON BORUTA
Deputy Drilled-In Anchors 8/23/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 8/23/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 8/23/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 8/23/2018 Approved TONY HARTONO
Deputy Steel/Welding 8/23/2018 Approved TONY HARTONO
Light Gage Steel Frame 8/23/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 8/23/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 8/23/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 8/23/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 8/24/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 8/24/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 8/24/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 8/24/2018 Approved TONY HARTONO
Deputy Steel/Welding 8/24/2018 Approved TONY HARTONO
Light Gage Steel Frame 8/24/2018 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 8/24/2018 Partial Approval TONY HARTONO
Reinforced Masonry Frame 8/24/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 8/24/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 8/24/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 8/27/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 8/27/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 8/27/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 8/27/2018 Approved TONY HARTONO
Deputy Steel/Welding 8/27/2018 Approved TONY HARTONO
Light Gage Steel Frame 8/27/2018 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 8/27/2018 Partial Approval TONY HARTONO
Reinforced Masonry Frame 8/27/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 8/27/2018 Partial Inspection TONY HARTONO
Wall Anchors 8/27/2018 Partial Inspection TONY HARTONO
Deputy Drilled-In Anchors 8/28/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 8/28/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 8/28/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 8/28/2018 Approved TONY HARTONO
Deputy Steel/Welding 8/28/2018 Approved TONY HARTONO
Light Gage Steel Frame 8/28/2018 Corrections Issued TONY HARTONO
Reinforced Masonry Frame 8/28/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 8/28/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 8/28/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 8/29/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 8/29/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 8/29/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 8/29/2018 Approved TONY HARTONO
Deputy Steel/Welding 8/29/2018 Approved TONY HARTONO
Light Gage Steel Frame 8/29/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 8/29/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 8/29/2018 Approved TONY HARTONO
Wall Anchors 8/29/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 8/30/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 8/30/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 8/30/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 8/30/2018 Approved TONY HARTONO
Deputy Steel/Welding 8/30/2018 Approved TONY HARTONO
Light Gage Steel Frame 8/30/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 8/30/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 8/30/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 8/30/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 8/31/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 8/31/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 8/31/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 8/31/2018 Approved TONY HARTONO
Deputy Steel/Welding 8/31/2018 Approved TONY HARTONO
Light Gage Steel Frame 8/31/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 8/31/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 8/31/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 8/31/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 9/4/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 9/4/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 9/4/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 9/4/2018 Approved TONY HARTONO
Deputy Steel/Welding 9/4/2018 Approved TONY HARTONO
Footing/Foundation/Slab 9/4/2018 Not Ready for Inspection TONY HARTONO
Light Gage Steel Frame 9/4/2018 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 9/4/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 9/4/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 9/4/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 9/5/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 9/5/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 9/5/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 9/5/2018 Approved TONY HARTONO
Deputy Steel/Welding 9/5/2018 Approved TONY HARTONO
Light Gage Steel Frame 9/5/2018 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 9/5/2018 Partial Approval TONY HARTONO
Reinforced Masonry Frame 9/5/2018 Partial Approval TONY HARTONO
Wall Anchors 9/5/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 9/6/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 9/6/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 9/6/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 9/6/2018 Approved TONY HARTONO
Deputy Steel/Welding 9/6/2018 Approved TONY HARTONO
Light Gage Steel Frame 9/6/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 9/6/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 9/6/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 9/7/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 9/7/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 9/7/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 9/7/2018 Approved TONY HARTONO
Deputy Steel/Welding 9/7/2018 Approved TONY HARTONO
Light Gage Steel Frame 9/7/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 9/7/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 9/7/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 9/7/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 9/10/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 9/10/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 9/10/2018 Approved TONY HARTONO
Deputy Steel/Welding 9/10/2018 Approved TONY HARTONO
Light Gage Steel Frame 9/10/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 9/10/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 9/10/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 9/10/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 9/11/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 9/11/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 9/11/2018 Approved TONY HARTONO
Deputy Steel/Welding 9/11/2018 Approved TONY HARTONO
Light Gage Steel Frame 9/11/2018 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 9/11/2018 Partial Approval TONY HARTONO
Reinforced Masonry Frame 9/11/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 9/11/2018 Partial Inspection TONY HARTONO
Deputy Pre-Stress Concrete 9/12/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 9/12/2018 Approved TONY HARTONO
Footing/Foundation/Slab 9/12/2018 Not Ready for Inspection TONY HARTONO
Light Gage Steel Frame 9/12/2018 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 9/12/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 9/12/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 9/12/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 9/12/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 9/13/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 9/13/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 9/13/2018 Approved TONY HARTONO
Deputy Steel/Welding 9/13/2018 Approved TONY HARTONO
Footing/Foundation/Slab 9/13/2018 Partial Approval TONY HARTONO
Light Gage Steel Frame 9/13/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 9/13/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 9/13/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 9/13/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 9/14/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 9/14/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 9/14/2018 Approved TONY HARTONO
Deputy Steel/Welding 9/14/2018 Approved TONY HARTONO
Light Gage Steel Frame 9/14/2018 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 9/14/2018 Partial Approval TONY HARTONO
Structural Steel Frame 9/14/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 9/14/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 9/17/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 9/17/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 9/17/2018 Approved TONY HARTONO
Deputy Steel/Welding 9/17/2018 Approved TONY HARTONO
Footing/Foundation/Slab 9/17/2018 Partial Approval TONY HARTONO
Light Gage Steel Frame 9/17/2018 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 9/17/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 9/17/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 9/17/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 9/17/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 9/18/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 9/18/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 9/18/2018 Approved TONY HARTONO
Deputy Steel/Welding 9/18/2018 Approved TONY HARTONO
Light Gage Steel Frame 9/18/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 9/18/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 9/18/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 9/18/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 9/19/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 9/19/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 9/19/2018 Approved TONY HARTONO
Deputy Steel/Welding 9/19/2018 Approved TONY HARTONO
Light Gage Steel Frame 9/19/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 9/19/2018 Partial Approval TONY HARTONO
Structural Steel Frame 9/19/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 9/19/2018 Not Ready for Inspection TONY HARTONO
Deputy Pre-Stress Concrete 9/20/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 9/20/2018 Approved TONY HARTONO
Light Gage Steel Frame 9/20/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 9/20/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 9/20/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 9/20/2018 Not Ready for Inspection TONY HARTONO
Deputy Pre-Stress Concrete 9/21/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 9/21/2018 Approved TONY HARTONO
Light Gage Steel Frame 9/21/2018 Partial Inspection TONY HARTONO
Reinforced Masonry Frame 9/21/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 9/21/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 9/21/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 9/24/2018 Approved DERRICK SPENCER
Deputy Pre-Stress Concrete 9/24/2018 Approved DERRICK SPENCER
Deputy Reinf. Concrete 9/24/2018 Approved DERRICK SPENCER
Deputy Reinf. Masonry 9/24/2018 Approved DERRICK SPENCER
Footing/Foundation/Slab 9/24/2018 Not Ready for Inspection DERRICK SPENCER
Light Gage Steel Frame 9/24/2018 Not Ready for Inspection DERRICK SPENCER
Reinforced Concrete Frame 9/24/2018 Partial Approval DERRICK SPENCER
Reinforced Masonry Frame 9/24/2018 Partial Approval DERRICK SPENCER
Structural Steel Frame 9/24/2018 Not Ready for Inspection DERRICK SPENCER
Wall Anchors 9/24/2018 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 9/25/2018 Approved DERRICK SPENCER
Deputy Pre-Stress Concrete 9/25/2018 Approved DERRICK SPENCER
Deputy Reinf. Concrete 9/25/2018 Approved DERRICK SPENCER
Deputy Reinf. Masonry 9/25/2018 Approved DERRICK SPENCER
Light Gage Steel Frame 9/25/2018 Partial Approval DERRICK SPENCER
Reinforced Masonry Frame 9/25/2018 Partial Approval DERRICK SPENCER
Structural Steel Frame 9/25/2018 Partial Approval DERRICK SPENCER
Wall Anchors 9/25/2018 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 9/26/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 9/26/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 9/26/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 9/26/2018 Approved TONY HARTONO
Light Gage Steel Frame 9/26/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 9/26/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 9/26/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 9/26/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 9/27/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 9/27/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 9/27/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 9/27/2018 Approved TONY HARTONO
Footing/Foundation/Slab 9/27/2018 Not Ready for Inspection TONY HARTONO
Light Gage Steel Frame 9/27/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 9/27/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 9/27/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 9/27/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 9/28/2018 Approved TONY HARTONO
Deputy Pre-Stress Concrete 9/28/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 9/28/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 9/28/2018 Approved TONY HARTONO
Light Gage Steel Frame 9/28/2018 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 9/28/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 9/28/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 9/28/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 9/28/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 10/1/2018 Approved TONY HARTONO
Deputy Wood Construction 10/1/2018 Approved TONY HARTONO
Light Gage Steel Frame 10/1/2018 Partial Inspection TONY HARTONO
Reinforced Masonry Frame 10/1/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 10/1/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 10/1/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 10/2/2018 Approved TONY HARTONO
Deputy Wood Construction 10/2/2018 Approved TONY HARTONO
Footing/Foundation/Slab 10/2/2018 Partial Approval TONY HARTONO
Insulation 10/2/2018 Not Ready for Inspection TONY HARTONO
Light Gage Steel Frame 10/2/2018 Partial Inspection TONY HARTONO
Reinforced Masonry Frame 10/2/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 10/2/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 10/3/2018 Approved TONY HARTONO
Deputy Wood Construction 10/3/2018 Approved TONY HARTONO
Footing/Foundation/Slab 10/3/2018 Partial Approval TONY HARTONO
Light Gage Steel Frame 10/3/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 10/3/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 10/4/2018 Approved TONY HARTONO
Deputy Wood Construction 10/4/2018 Approved TONY HARTONO
Insulation 10/4/2018 Not Ready for Inspection TONY HARTONO
Light Gage Steel Frame 10/4/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 10/4/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 10/4/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 10/5/2018 Approved DERRICK SPENCER
Deputy Wood Construction 10/5/2018 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 10/9/2018 Approved DERRICK SPENCER
Deputy Reinf. Concrete 10/9/2018 Approved DERRICK SPENCER
Deputy Wood Construction 10/9/2018 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 10/10/2018 Approved DERRICK SPENCER
Deputy Reinf. Concrete 10/10/2018 Approved DERRICK SPENCER
Deputy Wood Construction 10/10/2018 Approved DERRICK SPENCER
Footing/Foundation/Slab 10/10/2018 Partial Approval DERRICK SPENCER
Light Gage Steel Frame 10/10/2018 Partial Approval DERRICK SPENCER
Reinforced Concrete Frame 10/10/2018 Partial Approval DERRICK SPENCER
Reinforced Masonry Frame 10/10/2018 Partial Approval DERRICK SPENCER
Structural Steel Frame 10/10/2018 Partial Approval DERRICK SPENCER
Wall Anchors 10/10/2018 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 10/11/2018 Approved DERRICK SPENCER
Deputy Reinf. Concrete 10/11/2018 Approved DERRICK SPENCER
Deputy Wood Construction 10/11/2018 Approved DERRICK SPENCER
Drywall Nailing 10/11/2018 Not Ready for Inspection DERRICK SPENCER
Insulation 10/11/2018 Not Ready for Inspection DERRICK SPENCER
Light Gage Steel Frame 10/11/2018 Not Ready for Inspection DERRICK SPENCER
Masonry Wall/Backfill 10/11/2018 Not Ready for Inspection DERRICK SPENCER
Reinforced Masonry Frame 10/11/2018 Not Ready for Inspection DERRICK SPENCER
Structural Steel Frame 10/11/2018 Not Ready for Inspection DERRICK SPENCER
Wall Anchors 10/11/2018 Not Ready for Inspection DERRICK SPENCER
Deputy Drilled-In Anchors 10/12/2018 Approved DERRICK SPENCER
Deputy Reinf. Concrete 10/12/2018 Approved DERRICK SPENCER
Deputy Wood Construction 10/12/2018 Approved DERRICK SPENCER
Insulation 10/12/2018 Partial Approval DERRICK SPENCER
Light Gage Steel Frame 10/12/2018 Partial Approval DERRICK SPENCER
Reinforced Masonry Frame 10/12/2018 Partial Approval DERRICK SPENCER
Structural Steel Frame 10/12/2018 Partial Approval DERRICK SPENCER
Wall Anchors 10/12/2018 Partial Approval DERRICK SPENCER
Deputy Drilled-In Anchors 10/15/2018 Approved TONY HARTONO
Deputy Wood Construction 10/15/2018 Approved TONY HARTONO
Footing/Foundation/Slab 10/15/2018 Not Ready for Inspection TONY HARTONO
Light Gage Steel Frame 10/15/2018 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 10/15/2018 Partial Approval TONY HARTONO
Structural Steel Frame 10/15/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 10/15/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 10/16/2018 Approved TONY HARTONO
Light Gage Steel Frame 10/16/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 10/16/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 10/16/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 10/17/2018 Approved TONY HARTONO
Light Gage Steel Frame 10/17/2018 Partial Inspection TONY HARTONO
Reinforced Masonry Frame 10/17/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 10/17/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 10/17/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 10/18/2018 Approved TONY HARTONO
Light Gage Steel Frame 10/18/2018 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 10/18/2018 Partial Approval TONY HARTONO
Structural Steel Frame 10/18/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 10/18/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 10/19/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 10/22/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 10/22/2018 Approved TONY HARTONO
Footing/Foundation/Slab 10/22/2018 Partial Approval TONY HARTONO
Reinforced Concrete Frame 10/22/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 10/22/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 10/22/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 10/23/2018 Approved DERRICK SPENCER
Deputy Reinf. Concrete 10/23/2018 Approved DERRICK SPENCER
Deputy Steel/Welding 10/23/2018 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 10/24/2018 Approved DERRICK SPENCER
Deputy Reinf. Concrete 10/24/2018 Approved DERRICK SPENCER
Deputy Steel/Welding 10/24/2018 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 10/25/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 10/25/2018 Approved TONY HARTONO
Deputy Steel/Welding 10/25/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 10/26/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 10/26/2018 Approved TONY HARTONO
Deputy Steel/Welding 10/26/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 10/29/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 10/29/2018 Approved TONY HARTONO
Deputy Steel/Welding 10/29/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 10/30/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 10/30/2018 Approved TONY HARTONO
Footing/Foundation/Slab 10/30/2018 Not Ready for Inspection TONY HARTONO
Light Gage Steel Frame 10/30/2018 Partial Inspection TONY HARTONO
Reinforced Concrete Frame 10/30/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 10/31/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 10/31/2018 Approved TONY HARTONO
Insulation 10/31/2018 Not Ready for Inspection TONY HARTONO
Light Gage Steel Frame 10/31/2018 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 10/31/2018 Partial Approval TONY HARTONO
Deputy Drilled-In Anchors 11/1/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 11/1/2018 Approved TONY HARTONO
Insulation 11/1/2018 Not Ready for Inspection TONY HARTONO
Light Gage Steel Frame 11/1/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 11/2/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 11/2/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 11/5/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 11/5/2018 Approved TONY HARTONO
Reinforced Concrete Frame 11/5/2018 Partial Approval TONY HARTONO
Deputy Drilled-In Anchors 11/6/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 11/6/2018 Approved TONY HARTONO
Footing/Foundation/Slab 11/6/2018 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 11/6/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 11/7/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 11/7/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 11/8/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 11/8/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 11/9/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 11/9/2018 Approved TONY HARTONO
Insulation 11/9/2018 Not Ready for Inspection TONY HARTONO
Light Gage Steel Frame 11/9/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 11/9/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 11/13/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 11/13/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 11/13/2018 Approved TONY HARTONO
Drywall Nailing 11/13/2018 Not Ready for Inspection TONY HARTONO
Insulation 11/13/2018 Not Ready for Inspection TONY HARTONO
Light Gage Steel Frame 11/13/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 11/13/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 11/14/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 11/14/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 11/14/2018 Approved TONY HARTONO
Insulation 11/14/2018 Not Ready for Inspection TONY HARTONO
Light Gage Steel Frame 11/14/2018 Not Ready for Inspection TONY HARTONO
Reinforced Masonry Frame 11/14/2018 Partial Approval TONY HARTONO
Wall Anchors 11/14/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 11/15/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 11/15/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 11/15/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 11/16/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 11/16/2018 Approved TONY HARTONO
Deputy Reinf. Masonry 11/16/2018 Approved TONY HARTONO
Light Gage Steel Frame 11/19/2018 Not Ready for Inspection TONY HARTONO
Masonry Wall/Backfill 11/19/2018 Partial Approval TONY HARTONO
Reinforced Concrete Frame 11/19/2018 Partial Approval TONY HARTONO
Wall Anchors 11/19/2018 Not Ready for Inspection TONY HARTONO
Insulation 11/20/2018 Not Ready for Inspection TONY HARTONO
Light Gage Steel Frame 11/20/2018 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 11/20/2018 Partial Approval TONY HARTONO
Reinforced Masonry Frame 11/20/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 11/20/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 11/20/2018 Not Ready for Inspection TONY HARTONO
Insulation 11/21/2018 Not Ready for Inspection TONY HARTONO
Light Gage Steel Frame 11/21/2018 Not Ready for Inspection TONY HARTONO
Wall Anchors 11/21/2018 Partial Inspection TONY HARTONO
Insulation 11/26/2018 Not Ready for Inspection TONY HARTONO
Light Gage Steel Frame 11/26/2018 Not Ready for Inspection TONY HARTONO
Structural Steel Frame 11/26/2018 Partial Approval TONY HARTONO
Wall Anchors 11/26/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 11/27/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 11/27/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 11/28/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 11/28/2018 Approved TONY HARTONO
Deputy Wood Construction 11/28/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 11/29/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 11/29/2018 Approved TONY HARTONO
Deputy Wood Construction 11/29/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 11/30/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 11/30/2018 Approved TONY HARTONO
Deputy Wood Construction 11/30/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 12/3/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 12/3/2018 Approved TONY HARTONO
Deputy Wood Construction 12/3/2018 Approved TONY HARTONO
Light Gage Steel Frame 12/3/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 12/4/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 12/4/2018 Approved TONY HARTONO
Deputy Wood Construction 12/4/2018 Approved TONY HARTONO
Drywall Nailing 12/4/2018 Partial Approval TONY HARTONO
Light Gage Steel Frame 12/4/2018 Partial Inspection TONY HARTONO
Deputy Drilled-In Anchors 12/5/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 12/5/2018 Approved TONY HARTONO
Deputy Wood Construction 12/5/2018 Approved TONY HARTONO
Deputy Drilled-In Anchors 12/6/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 12/6/2018 Approved TONY HARTONO
Deputy Wood Construction 12/6/2018 Approved TONY HARTONO
Light Gage Steel Frame 12/6/2018 Not Ready for Inspection TONY HARTONO
Deputy Drilled-In Anchors 12/7/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 12/7/2018 Approved TONY HARTONO
Deputy Wood Construction 12/7/2018 Approved TONY HARTONO
Drywall Nailing 12/10/2018 Partial Approval TONY HARTONO
Light Gage Steel Frame 12/10/2018 Partial Inspection TONY HARTONO
Reinforced Concrete Frame 12/10/2018 Partial Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 12/11/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 12/12/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 12/13/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 12/14/2018 Approved TONY HARTONO
Light Gage Steel Frame 12/14/2018 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 12/14/2018 Not Ready for Inspection TONY HARTONO
Deputy Reinf. Concrete 12/24/2018 Conditional Approval TONY HARTONO
Deputy Reinf. Concrete 12/26/2018 Approved DERRICK SPENCER
Drywall Nailing 12/26/2018 Not Ready for Inspection DERRICK SPENCER
Light Gage Steel Frame 12/26/2018 Not Ready for Inspection DERRICK SPENCER
Structural Steel Frame 12/26/2018 Not Ready for Inspection DERRICK SPENCER
Wall Anchors 12/26/2018 Not Ready for Inspection DERRICK SPENCER
Deputy Reinf. Concrete 12/27/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 12/28/2018 Approved TONY HARTONO
Insulation 12/28/2018 Not Ready for Inspection TONY HARTONO
Deputy Reinf. Concrete 12/31/2018 Approved TONY HARTONO
Deputy Reinf. Concrete 1/2/2019 Approved NICK LAROCCA
Deputy Reinf. Concrete 1/3/2019 Approved DERRICK SPENCER
Insulation 1/3/2019 Partial Approval DERRICK SPENCER
Deputy Reinf. Concrete 1/4/2019 Approved TONY HARTONO
Deputy Reinf. Concrete 1/7/2019 Approved TONY HARTONO
Insulation 1/7/2019 Not Ready for Inspection TONY HARTONO
Deputy Reinf. Concrete 1/8/2019 Approved TONY HARTONO
Footing/Foundation/Slab 1/8/2019 Partial Approval TONY HARTONO
Insulation 1/8/2019 Partial Approval TONY HARTONO
Reinforced Concrete Frame 1/8/2019 Partial Approval TONY HARTONO
Deputy Reinf. Concrete 1/9/2019 Approved TONY HARTONO
Deputy Reinf. Concrete 1/10/2019 Approved TONY HARTONO
Deputy Reinf. Concrete 1/11/2019 Approved TONY HARTONO
Insulation 1/11/2019 Not Ready for Inspection TONY HARTONO
Footing/Foundation/Slab 1/16/2019 Not Ready for Inspection TONY HARTONO
Reinforced Concrete Frame 1/16/2019 Not Ready for Inspection TONY HARTONO
Deputy Reinf. Concrete 1/23/2019 Approved TONY HARTONO
Deputy Reinf. Concrete 1/24/2019 Approved TONY HARTONO
Deputy Reinf. Concrete 1/25/2019 Approved TONY HARTONO
Deputy Reinf. Concrete 1/28/2019 Approved TONY HARTONO
Deputy Reinf. Concrete 1/29/2019 Conditional Approval TONY HARTONO
Deputy Reinf. Concrete 1/30/2019 Approved TONY HARTONO
Deputy Reinf. Concrete 1/31/2019 Approved TONY HARTONO
Deputy Reinf. Concrete 2/1/2019 Approved TONY HARTONO
Deputy Reinf. Concrete 2/5/2019 Approved TONY HARTONO
Deputy Reinf. Concrete 2/6/2019 Approved TONY HARTONO
Deputy Reinf. Concrete 2/7/2019 Approved TONY HARTONO
Deputy Reinf. Concrete 2/8/2019 Approved TONY HARTONO
Drywall Nailing 5/29/2020 Approved JEFF BYTHEWAY
Final 5/29/2020 Permit Finaled JEFF BYTHEWAY
Footing/Foundation/Slab 5/29/2020 Approved JEFF BYTHEWAY
Green Building Final 5/29/2020 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 5/29/2020 Approved JEFF BYTHEWAY
Wood Frame 5/29/2020 Approved JEFF BYTHEWAY