Floor/Roof Diaphrgm/Shear Wall
|
7/13/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
7/17/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
7/27/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
7/30/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Structural Steel Frame
|
7/30/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Wall Anchors
|
7/30/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
7/31/2018
|
Partial Inspection
|
JOHN DODGE
|
Structural Steel Frame
|
7/31/2018
|
Partial Inspection
|
JOHN DODGE
|
Wall Anchors
|
7/31/2018
|
Partial Inspection
|
JOHN DODGE
|
Light Gage Steel Frame
|
8/1/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Structural Steel Frame
|
8/1/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Wall Anchors
|
8/1/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
8/2/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Structural Steel Frame
|
8/2/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
8/3/2018
|
Not Ready for Inspection
|
DERRICK SPENCER
|
Structural Steel Frame
|
8/3/2018
|
Not Ready for Inspection
|
DERRICK SPENCER
|
Light Gage Steel Frame
|
8/6/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Structural Steel Frame
|
8/6/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
8/28/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Wall Anchors
|
8/28/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
8/29/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Fireproofing
|
9/14/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
9/17/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
9/18/2018
|
Approved
|
TONY HARTONO
|
Light Gage Steel Frame
|
9/18/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Fireproofing
|
9/19/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
9/20/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
9/21/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
9/24/2018
|
Approved
|
DERRICK SPENCER
|
Deputy Fireproofing
|
9/25/2018
|
Approved
|
DERRICK SPENCER
|
Deputy Fireproofing
|
9/26/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
9/27/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
9/28/2018
|
Approved
|
TONY HARTONO
|
Light Gage Steel Frame
|
9/28/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
10/1/2018
|
Partial Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
10/2/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
10/3/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
10/4/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
10/5/2018
|
Not Ready for Inspection
|
DERRICK SPENCER
|
Light Gage Steel Frame
|
10/9/2018
|
Not Ready for Inspection
|
DERRICK SPENCER
|
Light Gage Steel Frame
|
10/10/2018
|
Partial Approval
|
DERRICK SPENCER
|
Structural Steel Frame
|
10/10/2018
|
Partial Approval
|
DERRICK SPENCER
|
Light Gage Steel Frame
|
10/11/2018
|
Not Ready for Inspection
|
DERRICK SPENCER
|
Structural Steel Frame
|
10/11/2018
|
Not Ready for Inspection
|
DERRICK SPENCER
|
Light Gage Steel Frame
|
10/18/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
10/19/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Light Gage Steel Frame
|
10/24/2018
|
Not Ready for Inspection
|
DERRICK SPENCER
|
Deputy Fireproofing
|
10/25/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
10/26/2018
|
Approved
|
TONY HARTONO
|
Light Gage Steel Frame
|
10/26/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Fireproofing
|
10/29/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
10/29/2018
|
Approved
|
TONY HARTONO
|
Light Gage Steel Frame
|
10/29/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Fireproofing
|
10/30/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
10/30/2018
|
Approved
|
TONY HARTONO
|
Light Gage Steel Frame
|
10/30/2018
|
Partial Inspection
|
TONY HARTONO
|
Deputy Fireproofing
|
10/31/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
10/31/2018
|
Approved
|
TONY HARTONO
|
Light Gage Steel Frame
|
10/31/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Fireproofing
|
11/1/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
11/1/2018
|
Approved
|
TONY HARTONO
|
Light Gage Steel Frame
|
11/1/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Fireproofing
|
11/2/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
11/2/2018
|
Approved
|
TONY HARTONO
|
Light Gage Steel Frame
|
11/2/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
11/5/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
11/5/2018
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
11/5/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
11/5/2018
|
Approved
|
TONY HARTONO
|
Light Gage Steel Frame
|
11/5/2018
|
Partial Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
11/6/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
11/6/2018
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
11/6/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
11/6/2018
|
Approved
|
TONY HARTONO
|
Light Gage Steel Frame
|
11/6/2018
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
11/7/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
11/7/2018
|
Conditional Approval
|
TONY HARTONO
|
Deputy Fireproofing
|
11/7/2018
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
11/7/2018
|
Conditional Approval
|
TONY HARTONO
|
Deputy Steel/Welding
|
11/7/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
11/8/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
11/8/2018
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
11/8/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
11/8/2018
|
Approved
|
TONY HARTONO
|
Light Gage Steel Frame
|
11/8/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Reinforced Concrete Frame
|
11/8/2018
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
11/9/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
11/9/2018
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
11/9/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
11/9/2018
|
Approved
|
TONY HARTONO
|
Light Gage Steel Frame
|
11/9/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
11/13/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
11/13/2018
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
11/13/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
11/13/2018
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
11/13/2018
|
Approved
|
TONY HARTONO
|
Light Gage Steel Frame
|
11/13/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
11/14/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
11/14/2018
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
11/14/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
11/14/2018
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
11/14/2018
|
Approved
|
TONY HARTONO
|
Light Gage Steel Frame
|
11/14/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
11/15/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
11/15/2018
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
11/15/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
11/15/2018
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
11/15/2018
|
Approved
|
TONY HARTONO
|
Light Gage Steel Frame
|
11/15/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
11/16/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
11/16/2018
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
11/16/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
11/16/2018
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
11/16/2018
|
Approved
|
TONY HARTONO
|
Reinforced Concrete Frame
|
11/16/2018
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
11/19/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
11/19/2018
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
11/19/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
11/19/2018
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
11/19/2018
|
Approved
|
TONY HARTONO
|
Light Gage Steel Frame
|
11/19/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
11/20/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
11/20/2018
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
11/20/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
11/20/2018
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
11/20/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
11/21/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
11/21/2018
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
11/21/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
11/21/2018
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
11/21/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
11/27/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
11/27/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
11/27/2018
|
Approved
|
TONY HARTONO
|
Light Gage Steel Frame
|
11/27/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
11/28/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
11/28/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
11/28/2018
|
Approved
|
TONY HARTONO
|
Light Gage Steel Frame
|
11/28/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
11/29/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
11/29/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
11/29/2018
|
Approved
|
TONY HARTONO
|
Light Gage Steel Frame
|
11/29/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
11/30/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
11/30/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
11/30/2018
|
Approved
|
TONY HARTONO
|
Light Gage Steel Frame
|
11/30/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
12/3/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
12/3/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
12/3/2018
|
Approved
|
TONY HARTONO
|
Light Gage Steel Frame
|
12/3/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
12/4/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
12/4/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
12/4/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
12/5/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
12/5/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
12/5/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
12/6/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
12/6/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
12/6/2018
|
Approved
|
TONY HARTONO
|
Light Gage Steel Frame
|
12/6/2018
|
Partial Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
12/7/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
12/7/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
12/7/2018
|
Approved
|
TONY HARTONO
|
Light Gage Steel Frame
|
12/7/2018
|
Partial Approval
|
TONY HARTONO
|
Light Gage Steel Frame
|
12/10/2018
|
Partial Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
12/11/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
12/11/2018
|
Approved
|
TONY HARTONO
|
Deputy Other (see comments)
|
12/11/2018
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
12/11/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
12/11/2018
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
12/11/2018
|
Approved
|
TONY HARTONO
|
Light Gage Steel Frame
|
12/11/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
12/12/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
12/12/2018
|
Approved
|
TONY HARTONO
|
Deputy Other (see comments)
|
12/12/2018
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
12/12/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
12/12/2018
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
12/12/2018
|
Approved
|
TONY HARTONO
|
Light Gage Steel Frame
|
12/12/2018
|
Partial Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
12/13/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
12/13/2018
|
Approved
|
TONY HARTONO
|
Deputy Other (see comments)
|
12/13/2018
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
12/13/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
12/13/2018
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
12/13/2018
|
Approved
|
TONY HARTONO
|
Light Gage Steel Frame
|
12/13/2018
|
Partial Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
12/14/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
12/14/2018
|
Approved
|
TONY HARTONO
|
Deputy Other (see comments)
|
12/14/2018
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
12/14/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
12/14/2018
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
12/14/2018
|
Approved
|
TONY HARTONO
|
Light Gage Steel Frame
|
12/14/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
12/17/2018
|
Approved
|
DERRICK SPENCER
|
Deputy Fireproofing
|
12/17/2018
|
Approved
|
DERRICK SPENCER
|
Deputy Other (see comments)
|
12/17/2018
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
12/17/2018
|
Approved
|
DERRICK SPENCER
|
Light Gage Steel Frame
|
12/17/2018
|
Not Ready for Inspection
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
12/18/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
12/18/2018
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
12/18/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
12/18/2018
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
12/18/2018
|
Approved
|
TONY HARTONO
|
Light Gage Steel Frame
|
12/18/2018
|
Partial Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
12/19/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
12/19/2018
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
12/19/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
12/19/2018
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
12/19/2018
|
Approved
|
TONY HARTONO
|
Light Gage Steel Frame
|
12/19/2018
|
Partial Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
12/20/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
12/20/2018
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
12/20/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
12/20/2018
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
12/20/2018
|
Approved
|
TONY HARTONO
|
Light Gage Steel Frame
|
12/20/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
12/21/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
12/21/2018
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
12/21/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
12/21/2018
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
12/21/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
12/24/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
12/24/2018
|
Conditional Approval
|
TONY HARTONO
|
Deputy Fireproofing
|
12/24/2018
|
Conditional Approval
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
12/24/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
12/24/2018
|
Conditional Approval
|
TONY HARTONO
|
Deputy Wood Construction
|
12/24/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
12/26/2018
|
Approved
|
DERRICK SPENCER
|
Deputy Fireproofing
|
12/26/2018
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
12/26/2018
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
12/27/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
12/27/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
12/27/2018
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
12/27/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
12/28/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
12/28/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
12/28/2018
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
12/28/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
12/31/2018
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
12/31/2018
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
12/31/2018
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
12/31/2018
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
1/2/2019
|
Approved
|
NICK LAROCCA
|
Deputy Fireproofing
|
1/2/2019
|
Approved
|
NICK LAROCCA
|
Deputy Steel/Welding
|
1/2/2019
|
Approved
|
NICK LAROCCA
|
Deputy Wood Construction
|
1/2/2019
|
Approved
|
NICK LAROCCA
|
Deputy Drilled-In Anchors
|
1/3/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Fireproofing
|
1/3/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Steel/Welding
|
1/3/2019
|
Approved
|
DERRICK SPENCER
|
Deputy Wood Construction
|
1/3/2019
|
Approved
|
DERRICK SPENCER
|
Light Gage Steel Frame
|
1/3/2019
|
Not Ready for Inspection
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
1/4/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
1/4/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
1/4/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
1/4/2019
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
1/7/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
1/7/2019
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
1/8/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
1/8/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
1/8/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
1/8/2019
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
1/9/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
1/9/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
1/9/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
1/9/2019
|
Approved
|
TONY HARTONO
|
Light Gage Steel Frame
|
1/9/2019
|
Corrections Issued
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
1/10/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
1/10/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
1/10/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
1/10/2019
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
1/11/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
1/11/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
1/11/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
1/11/2019
|
Approved
|
TONY HARTONO
|
Light Gage Steel Frame
|
1/11/2019
|
Partial Inspection
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
1/14/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
1/14/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
1/14/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
1/14/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
1/14/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
1/15/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
1/15/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
1/16/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
1/16/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
1/17/2019
|
Conditional Approval
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
1/17/2019
|
Conditional Approval
|
TONY HARTONO
|
Deputy Steel/Welding
|
1/17/2019
|
Conditional Approval
|
TONY HARTONO
|
Deputy Wood Construction
|
1/17/2019
|
Conditional Approval
|
TONY HARTONO
|
Deputy Fireproofing
|
1/18/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
1/18/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
1/18/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
1/18/2019
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
1/22/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
1/22/2019
|
Approved
|
TONY HARTONO
|
Deputy Other (see comments)
|
1/22/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
1/22/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
1/22/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
1/22/2019
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
1/23/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
1/23/2019
|
Approved
|
TONY HARTONO
|
Deputy Other (see comments)
|
1/23/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
1/23/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
1/23/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
1/23/2019
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
1/24/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
1/24/2019
|
Approved
|
TONY HARTONO
|
Deputy Other (see comments)
|
1/24/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
1/24/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
1/24/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
1/24/2019
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
1/25/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
1/25/2019
|
Approved
|
TONY HARTONO
|
Deputy Other (see comments)
|
1/25/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Concrete
|
1/25/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
1/25/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
1/25/2019
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
1/28/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
1/28/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
1/28/2019
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
1/29/2019
|
Conditional Approval
|
TONY HARTONO
|
Deputy Fireproofing
|
1/29/2019
|
Conditional Approval
|
TONY HARTONO
|
Deputy Steel/Welding
|
1/29/2019
|
Conditional Approval
|
TONY HARTONO
|
Deputy Wood Construction
|
1/29/2019
|
Conditional Approval
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
1/30/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
1/30/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
1/30/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
1/30/2019
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
1/31/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
1/31/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
1/31/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
1/31/2019
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
2/1/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
2/1/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
2/1/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
2/1/2019
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
2/4/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
2/4/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
2/4/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
2/4/2019
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
2/5/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
2/5/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
2/5/2019
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
2/6/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
2/6/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
2/6/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
2/6/2019
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
2/7/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
2/7/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
2/7/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
2/7/2019
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
2/8/2019
|
Approved
|
TONY HARTONO
|
Deputy Fireproofing
|
2/8/2019
|
Approved
|
TONY HARTONO
|
Deputy Steel/Welding
|
2/8/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
2/8/2019
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
6/25/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Masonry
|
6/25/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
6/25/2019
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
6/26/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Masonry
|
6/26/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
6/26/2019
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
6/27/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Masonry
|
6/27/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
6/27/2019
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
6/28/2019
|
Approved
|
TED RIES
|
Deputy Reinf. Masonry
|
6/28/2019
|
Approved
|
TED RIES
|
Deputy Wood Construction
|
6/28/2019
|
Approved
|
TED RIES
|
Deputy Drilled-In Anchors
|
7/1/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Masonry
|
7/1/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
7/1/2019
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
7/8/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Masonry
|
7/8/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
7/8/2019
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
7/9/2019
|
Approved
|
TONY HARTONO
|
Deputy Reinf. Masonry
|
7/9/2019
|
Approved
|
TONY HARTONO
|
Deputy Wood Construction
|
7/9/2019
|
Approved
|
TONY HARTONO
|
Deputy Drilled-In Anchors
|
7/10/2019
|
Conditional Approval
|
JASON BORUTA
|
Deputy Reinf. Masonry
|
7/10/2019
|
Conditional Approval
|
JASON BORUTA
|
Deputy Wood Construction
|
7/10/2019
|
Conditional Approval
|
JASON BORUTA
|
Deputy Drilled-In Anchors
|
7/11/2019
|
Approved
|
NICK LAROCCA
|
Deputy Reinf. Masonry
|
7/11/2019
|
Approved
|
NICK LAROCCA
|
Deputy Wood Construction
|
7/11/2019
|
Approved
|
NICK LAROCCA
|
Deputy Drilled-In Anchors
|
7/12/2019
|
Approved
|
JONATHAN ALLEN
|
Deputy Reinf. Masonry
|
7/12/2019
|
Approved
|
JONATHAN ALLEN
|
Deputy Wood Construction
|
7/12/2019
|
Approved
|
JONATHAN ALLEN
|
Final
|
12/17/2019
|
Permit Finaled
|
JEFF BYTHEWAY
|