2231 S WESTERN AVE 1-60 90018

Certificate Information: 2231 S WESTERN AVE 1-60 90018

Application / Permit
17016-10000-18981
Plan Check / Job No.
B17LA12221
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(27) Joint Living and Working Quarters
Work Description
ADAPTIVE REUSE per ZA2016-3577-ZAD-CUB to convert an (E) HOSPITAL TO (N) 60 Joint-Live-Work UNITS with PARKING GARAGE at basement and 3,115 square feet rooftop RESTAURANT with 2,334 square feet of patio area. Project also include (N) ELEVATOR, (N) BALCONIES, (N) PLANTERS, (N) WALKWAYS, and (N) roof deck. Building to retrofit to comply with Ordinance #183893.
Permit Issued
Issued on 3/19/2018
Issuing Office
Metro
Current Status
CofO Issued on 12/24/2020
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 7/12/2017 APPLICANT
Disabled Access Plans Picked Up 7/27/2017 APPLICANT
Assigned to Plan Check Engineer 8/3/2017 WING SUEN
Green Plans Picked Up 8/3/2017 APPLICANT
Corrections Issued 9/5/2017 WING SUEN
Quality Review Completed 9/18/2017 BILL STUTSMAN
Building Plans Picked Up 9/19/2017 APPLICANT
Applicant returned to address corrections 1/2/2018 WING SUEN
Applicant returned to address corrections 1/16/2018 WING SUEN
Applicant returned to address corrections 1/17/2018 WING SUEN
Applicant returned to address corrections 1/25/2018 WING SUEN
Applicant returned to address corrections 1/31/2018 WING SUEN
Applicant returned to address corrections 2/5/2018 WING SUEN
Applicant returned to address corrections 2/12/2018 WING SUEN
Applicant returned to address corrections 2/16/2018 WING SUEN
Applicant returned to address corrections 2/20/2018 WING SUEN
Applicant returned to address corrections 2/26/2018 WING SUEN
Applicant returned to address corrections 3/12/2018 WING SUEN
Applicant returned to address corrections 3/14/2018 WING SUEN
Plan Check Approved 3/19/2018 WING SUEN
Issued 3/19/2018 LADBS
TCO Issued (Expire Date: 01-03-2021) 7/7/2020 DAVID TSAU
CofO in Progress 12/22/2020 JOEY BUCHANAN
CofO Issued 12/24/2020 ERNESTO CORRAL
Permit Finaled 12/24/2020 ERNESTO CORRAL

Permit Application Clearance Information

Address approval Cleared 11/16/2017 RAVIL MANAPOV
Eng Process Fee Ord 176,300 Cleared 11/16/2017 RAVIL MANAPOV
Green Code Cleared 1/16/2018 RICHARD DOCKUS
Sewer availability Cleared 1/26/2018 CELINA MORENO
Tract Map conditions Cleared 2/15/2018 DIANA JIMENEZ
DAS Clearance Cleared 3/15/2018 WAI LAU
Fire Marshall Fire Life Safety Cleared 3/15/2018 ANDREW KO
Frnt yard landscape/Water mgmt Cleared 3/16/2018 DIANA JIMENEZ
Low Impact Development Cleared 3/16/2018 RYAN HUDSON
Prkng lot landscape/Water mgmt Cleared 3/16/2018 DIANA JIMENEZ
Roof/Waste drainage to street Cleared 3/16/2018 JAMES MORALEZ
Specific Plan Cleared 3/16/2018 DIANA JIMENEZ
ZA Case Cleared 3/16/2018 DIANA JIMENEZ
Highway dedication Cleared 3/19/2018 MICHAEL CASTILLO
Opn space landscape/Water mgmt Cleared 3/19/2018 MARITZA PRZEKOP
Site Plan review Cleared 3/19/2018 MARITZA PRZEKOP

Contact Information

Architect David, Lawrence Gray Architects; Lic. No.: C10506 353 S BROADWAY   SUITE 200    LOS ANGELES, CA 90013
Contractor Owner-Builder       ,
Engineer Funk, David Lyle; Lic. No.: S5421 619 BERYL ST      REDONDO BEACH, CA 90277

Inspector Information

MICHAEL PETRUSKO, (310) 732-4552 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 3/29/2018 Partial Approval JOEY BUCHANAN
Deputy Drilled-In Anchors 3/30/2018 Partial Approval JOEY BUCHANAN
Deputy Drilled-In Anchors 4/2/2018 Partial Approval JOEY BUCHANAN
Deputy Drilled-In Anchors 4/3/2018 Partial Approval JOEY BUCHANAN
Deputy Drilled-In Anchors 4/4/2018 Approved JOEY BUCHANAN
Deputy Drilled-In Anchors 4/5/2018 Partial Approval JOEY BUCHANAN
Deputy Drilled-In Anchors 4/6/2018 Partial Approval JOEY BUCHANAN
Deputy Reinf. Concrete 4/10/2018 Partial Approval JOEY BUCHANAN
Deputy Reinf. Concrete 4/11/2018 Partial Approval JOEY BUCHANAN
Deputy Reinf. Concrete 4/12/2018 Partial Approval JOEY BUCHANAN
Deputy Reinf. Concrete 4/13/2018 Partial Approval JOEY BUCHANAN
Deputy Reinf. Concrete 4/16/2018 Partial Approval JOEY BUCHANAN
Deputy Reinf. Concrete 4/17/2018 Partial Approval JOEY BUCHANAN
Deputy Reinf. Concrete 4/18/2018 Partial Approval JOEY BUCHANAN
Deputy Reinf. Concrete 4/19/2018 Partial Approval JOEY BUCHANAN
Deputy Reinf. Concrete 4/20/2018 Partial Approval JOEY BUCHANAN
Deputy Reinf. Concrete 4/23/2018 Partial Approval JOEY BUCHANAN
Deputy Reinf. Concrete 4/24/2018 Partial Approval JOEY BUCHANAN
Deputy Reinf. Concrete 4/25/2018 Partial Approval JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 4/25/2018 Partial Approval JOEY BUCHANAN
Deputy Other (see comments) 4/26/2018 Partial Approval JOEY BUCHANAN
Deputy Reinf. Concrete 4/26/2018 Partial Approval JOEY BUCHANAN
Deputy Reinf. Concrete 4/27/2018 Partial Approval JOEY BUCHANAN
Deputy Reinf. Concrete 4/30/2018 Partial Approval JOEY BUCHANAN
Deputy Shotcrete 5/1/2018 Partial Approval JOEY BUCHANAN
Deputy Shotcrete 5/2/2018 Partial Approval JOEY BUCHANAN
Deputy Shotcrete 5/3/2018 Order to Comply Issued JOEY BUCHANAN
Deputy Shotcrete 5/4/2018 Partial Approval JOEY BUCHANAN
Deputy Shotcrete 5/7/2018 Partial Approval JOEY BUCHANAN
Deputy Shotcrete 5/8/2018 Partial Approval JOEY BUCHANAN
Deputy Shotcrete 5/9/2018 Approved JOEY BUCHANAN
Deputy Shotcrete 5/10/2018 Approved JOEY BUCHANAN
Deputy Shotcrete 5/11/2018 Partial Approval JOEY BUCHANAN
Deputy Shotcrete 5/14/2018 Conditional Approval JOSE GAXIOLA
Deputy Shotcrete 5/15/2018 Partial Approval JOEY BUCHANAN
Deputy Shotcrete 5/16/2018 Approved JOEY BUCHANAN
Deputy Shotcrete 5/17/2018 Partial Approval JOEY BUCHANAN
Deputy Shotcrete 5/18/2018 Approved JOEY BUCHANAN
Deputy Shotcrete 5/21/2018 Approved JOEY BUCHANAN
Deputy Shotcrete 5/22/2018 Approved JOEY BUCHANAN
Deputy Shotcrete 5/23/2018 Partial Approval JOEY BUCHANAN
Deputy Shotcrete 5/24/2018 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 5/24/2018 Not Ready for Inspection JOEY BUCHANAN
Deputy Reinf. Concrete 5/25/2018 Approved JOEY BUCHANAN
Deputy Shotcrete 5/25/2018 Partial Approval JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 5/25/2018 Partial Inspection JOEY BUCHANAN
Deputy Shotcrete 5/29/2018 Approved JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 5/29/2018 Not Ready for Inspection JOEY BUCHANAN
Deputy Shotcrete 5/31/2018 Partial Approval JOEY BUCHANAN
Deputy Shotcrete 6/1/2018 Partial Approval JOEY BUCHANAN
Deputy Shotcrete 6/4/2018 Partial Approval JOEY BUCHANAN
Deputy Shotcrete 6/5/2018 Approved JOEY BUCHANAN
Deputy Shotcrete 6/6/2018 Partial Approval JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 6/6/2018 Partial Approval JOEY BUCHANAN
Deputy Shotcrete 6/7/2018 Partial Approval JOEY BUCHANAN
Deputy Shotcrete 6/8/2018 Approved JOEY BUCHANAN
Deputy Shotcrete 6/11/2018 Approved JOEY BUCHANAN
Deputy Shotcrete 6/12/2018 Approved JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 6/12/2018 Partial Approval JOEY BUCHANAN
Deputy Shotcrete 6/13/2018 Partial Approval JAMES POWERS
Deputy Shotcrete 6/14/2018 Conditional Approval DAVID TSAU
Deputy Shotcrete 6/15/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 6/18/2018 Conditional Approval JOEY BUCHANAN
Deputy Shotcrete 6/19/2018 Partial Approval JOEY BUCHANAN
Deputy Shotcrete 6/20/2018 Partial Approval JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 6/20/2018 Not Ready for Inspection JOEY BUCHANAN
Deputy Shotcrete 6/21/2018 Approved JOEY BUCHANAN
Deputy Shotcrete 6/22/2018 Partial Approval JOEY BUCHANAN
Deputy Shotcrete 6/25/2018 Partial Approval JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 6/27/2018 Partial Approval JOEY BUCHANAN
Deputy Shotcrete 7/3/2018 Conditional Approval NICK DANERI
Deputy Shotcrete 7/5/2018 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 7/5/2018 Not Ready for Inspection JAMES POWERS
Deputy Shotcrete 7/6/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 7/9/2018 Conditional Approval JOEY BUCHANAN
Deputy Shotcrete 7/10/2018 Conditional Approval JOEY BUCHANAN
Deputy Shotcrete 7/11/2018 Partial Approval JOEY BUCHANAN
Deputy Shotcrete 7/12/2018 Partial Approval JOEY BUCHANAN
Deputy Shotcrete 7/13/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 7/13/2018 Partial Approval NICK DANERI
Deputy Shotcrete 7/16/2018 Partial Approval JOEY BUCHANAN
Deputy Shotcrete 7/17/2018 Partial Approval JOEY BUCHANAN
Deputy Shotcrete 7/18/2018 Partial Approval JOEY BUCHANAN
Deputy Shotcrete 7/19/2018 Approved JOEY BUCHANAN
Deputy Shotcrete 7/19/2018 Partial Approval JOEY BUCHANAN
Deputy Shotcrete 7/20/2018 Partial Approval JOEY BUCHANAN
Deputy Shotcrete 7/23/2018 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 7/23/2018 Not Ready for Inspection LARRY ARNICK
Deputy Shotcrete 7/24/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 7/24/2018 Partial Approval JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 7/24/2018 Partial Approval JOEY BUCHANAN
Deputy Shotcrete 7/25/2018 Partial Approval JOEY BUCHANAN
Deputy Shotcrete 7/26/2018 Partial Approval JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 7/26/2018 Partial Approval JOEY BUCHANAN
Deputy Shotcrete 7/27/2018 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 7/27/2018 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Shotcrete 7/30/2018 Partial Approval JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 7/30/2018 Not Ready for Inspection JOEY BUCHANAN
Deputy Shotcrete 7/31/2018 Conditional Approval JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 7/31/2018 Partial Approval JOEY BUCHANAN
Deputy Shotcrete 8/1/2018 Partial Approval JOEY BUCHANAN
Deputy Shotcrete 8/2/2018 Partial Approval JOEY BUCHANAN
Deputy Shotcrete 8/3/2018 Approved JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 8/3/2018 Partial Approval JOEY BUCHANAN
Deputy Drilled-In Anchors 8/6/2018 Approved JOEY BUCHANAN
Deputy Shotcrete 8/6/2018 Partial Approval JOEY BUCHANAN
Deputy Reinf. Masonry 8/7/2018 Partial Approval JOEY BUCHANAN
Masonry Wall/Backfill 8/7/2018 Partial Approval JOEY BUCHANAN
Deputy Reinf. Masonry 8/8/2018 Partial Approval JOEY BUCHANAN
Deputy Reinf. Masonry 8/9/2018 Approved JOEY BUCHANAN
Deputy Reinf. Masonry 8/10/2018 Approved JOEY BUCHANAN
Light Gage Steel Frame 10/11/2018 Partial Approval JOEY BUCHANAN
Deputy Reinf. Concrete 10/31/2018 Approved JOEY BUCHANAN
Light Gage Steel Frame 11/5/2018 Partial Approval JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 11/7/2018 Partial Approval JOEY BUCHANAN
Light Gage Steel Frame 11/14/2018 Partial Approval JOEY BUCHANAN
Deputy Steel/Welding 11/29/2018 Approved JOEY BUCHANAN
Light Gage Steel Frame 12/11/2018 Partial Approval JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 12/13/2018 Partial Approval JOEY BUCHANAN
Deputy Other (see comments) 12/18/2018 Approved JOEY BUCHANAN
Deputy Other (see comments) 12/19/2018 Approved JOEY BUCHANAN
Deputy Other (see comments) 12/20/2018 Approved JOEY BUCHANAN
Deputy Other (see comments) 12/21/2018 Approved JOEY BUCHANAN
Light Gage Steel Frame 12/26/2018 Not Ready for Inspection JOEY BUCHANAN
Light Gage Steel Frame 12/31/2018 Partial Approval JOEY BUCHANAN
Light Gage Steel Frame 1/8/2019 Conditional Approval JOEY BUCHANAN
Light Gage Steel Frame 1/23/2019 Corrections Issued JOEY BUCHANAN
Insulation 2/7/2019 Partial Approval JOEY BUCHANAN
Pre-Inspection 2/15/2019 Approved JOEY BUCHANAN
Light Gage Steel Frame 3/4/2019 Partial Approval JOEY BUCHANAN
Insulation 3/11/2019 Partial Approval JOEY BUCHANAN
Light Gage Steel Frame 3/11/2019 Partial Approval JOEY BUCHANAN
Light Gage Steel Frame 3/12/2019 Not Ready for Inspection JOEY BUCHANAN
Light Gage Steel Frame 3/15/2019 Approved JOEY BUCHANAN
Light Gage Steel Frame 3/18/2019 Approved JOEY BUCHANAN
Light Gage Steel Frame 3/20/2019 Not Ready for Inspection JOEY BUCHANAN
Light Gage Steel Frame 3/27/2019 Partial Approval JOEY BUCHANAN
Drywall Nailing 4/1/2019 Partial Approval JOEY BUCHANAN
Green Building Rough 4/1/2019 Approved JOEY BUCHANAN
Light Gage Steel Frame 4/5/2019 Partial Approval JOEY BUCHANAN
Light Gage Steel Frame 4/8/2019 Partial Approval JOEY BUCHANAN
METHANE-Rough 4/10/2019 Approved JOEY BUCHANAN
Structural Steel Frame 4/10/2019 Not Ready for Inspection JOEY BUCHANAN
Light Gage Steel Frame 4/15/2019 Partial Inspection JONATHAN QUACH
Light Gage Steel Frame 4/16/2019 Partial Approval JOEY BUCHANAN
Deputy Drilled-In Anchors 4/17/2019 Conditional Approval JOEY BUCHANAN
Light Gage Steel Frame 4/17/2019 Not Ready for Inspection JOEY BUCHANAN
Deputy Drilled-In Anchors 4/18/2019 Approved JOEY BUCHANAN
Light Gage Steel Frame 4/18/2019 Partial Approval JOEY BUCHANAN
Light Gage Steel Frame 4/22/2019 Partial Approval JOEY BUCHANAN
Light Gage Steel Frame 4/30/2019 Approved HAMID PISHEHVAR
Deputy Fireproofing 5/1/2019 Approved JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 5/2/2019 Partial Approval JOEY BUCHANAN
Light Gage Steel Frame 5/14/2019 Partial Approval JOEY BUCHANAN
Deputy Drilled-In Anchors 5/20/2019 Approved JOEY BUCHANAN
Deputy Steel/Welding 5/20/2019 Approved JOEY BUCHANAN
Deputy Drilled-In Anchors 5/21/2019 Approved JOEY BUCHANAN
Deputy Steel/Welding 5/21/2019 Approved JOEY BUCHANAN
Light Gage Steel Frame 5/21/2019 Partial Approval JOEY BUCHANAN
Deputy Drilled-In Anchors 5/22/2019 Approved JOEY BUCHANAN
Deputy Steel/Welding 5/22/2019 Approved JOEY BUCHANAN
Light Gage Steel Frame 5/22/2019 Partial Approval JOEY BUCHANAN
Deputy Drilled-In Anchors 5/23/2019 Approved JOEY BUCHANAN
Deputy Steel/Welding 5/23/2019 Partial Approval JOEY BUCHANAN
Light Gage Steel Frame 5/23/2019 Partial Approval JOEY BUCHANAN
Deputy Drilled-In Anchors 5/24/2019 Approved JOEY BUCHANAN
Deputy Steel/Welding 5/24/2019 Approved JOEY BUCHANAN
Deputy Steel/Welding 5/28/2019 Approved JOEY BUCHANAN
Light Gage Steel Frame 5/28/2019 Not Ready for Inspection HAMID PISHEHVAR
Deputy Steel/Welding 5/29/2019 Approved JOEY BUCHANAN
Light Gage Steel Frame 5/29/2019 Partial Approval JOEY BUCHANAN
Light Gage Steel Frame 6/6/2019 Partial Approval JOEY BUCHANAN
Deputy Steel/Welding 6/13/2019 Approved JOEY BUCHANAN
Light Gage Steel Frame 6/13/2019 Partial Approval JOEY BUCHANAN
Deputy Steel/Welding 6/14/2019 Approved JOEY BUCHANAN
Deputy Steel/Welding 6/17/2019 Approved JOEY BUCHANAN
Deputy Steel/Welding 6/18/2019 Approved JOEY BUCHANAN
Deputy Steel/Welding 6/19/2019 Approved JOEY BUCHANAN
Light Gage Steel Frame 6/20/2019 Partial Approval JOEY BUCHANAN
Interior/Exterior Lathing 7/10/2019 Partial Approval JOEY BUCHANAN
Structural Steel Frame 7/11/2019 Partial Approval JOEY BUCHANAN
Light Gage Steel Frame 7/16/2019 Partial Approval HAMID PISHEHVAR
Light Gage Steel Frame 7/18/2019 Approved HAMID PISHEHVAR
Light Gage Steel Frame 7/22/2019 Not Ready for Inspection JOEY BUCHANAN
Deputy Steel/Welding 7/23/2019 Approved JOEY BUCHANAN
Light Gage Steel Frame 8/9/2019 Partial Approval JOEY BUCHANAN
Light Gage Steel Frame 8/13/2019 Partial Approval JOEY BUCHANAN
Structural Steel Frame 8/14/2019 Approved JOEY BUCHANAN
Light Gage Steel Frame 9/5/2019 Partial Approval HAMID PISHEHVAR
Light Gage Steel Frame 9/13/2019 Corrections Issued JOEY BUCHANAN
Light Gage Steel Frame 9/20/2019 Partial Approval JOEY BUCHANAN
Deputy Steel/Welding 9/24/2019 Approved JOEY BUCHANAN
Deputy Steel/Welding 10/1/2019 Approved JOEY BUCHANAN
Light Gage Steel Frame 10/1/2019 Not Ready for Inspection JOEY BUCHANAN
Light Gage Steel Frame 10/7/2019 Partial Approval JOEY BUCHANAN
Light Gage Steel Frame 10/9/2019 Conditional Approval JOEY BUCHANAN
Light Gage Steel Frame 10/23/2019 Partial Approval JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 10/31/2019 Approved JOEY BUCHANAN
Grading Pre-Inspection 10/31/2019 Approved JOEY BUCHANAN
Light Gage Steel Frame 11/1/2019 Partial Approval JOEY BUCHANAN
Light Gage Steel Frame 11/5/2019 Partial Approval JOEY BUCHANAN
Light Gage Steel Frame 12/2/2019 Partial Approval JOEY BUCHANAN
Light Gage Steel Frame 12/6/2019 Partial Approval JOEY BUCHANAN
Interior/Exterior Lathing 12/19/2019 Approved JOEY BUCHANAN
Light Gage Steel Frame 1/8/2020 Partial Approval JOEY BUCHANAN
Deputy Drilled-In Anchors 1/9/2020 Approved JOEY BUCHANAN
Light Gage Steel Frame 1/13/2020 Partial Approval JOEY BUCHANAN
Footing/Foundation/Slab 1/15/2020 Partial Approval JOEY BUCHANAN
Footing/Foundation/Slab 1/16/2020 Partial Approval DANIEL VARNUM
Deputy Drilled-In Anchors 1/17/2020 Approved JOEY BUCHANAN
Deputy Drilled-In Anchors 1/28/2020 Approved JOEY BUCHANAN
Deputy Drilled-In Anchors 1/30/2020 Approved JOEY BUCHANAN
Deputy Drilled-In Anchors 1/31/2020 Approved JOEY BUCHANAN
Masonry Wall/Backfill 2/6/2020 Approved JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 3/17/2020 Not Ready for Inspection JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 3/31/2020 Partial Approval JOEY BUCHANAN
Footing/Foundation/Slab 4/20/2020 Partial Approval JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 4/27/2020 Partial Approval JOEY BUCHANAN
Footing/Foundation/Slab 6/3/2020 Not Ready for Inspection JOEY BUCHANAN
Drywall Nailing 6/25/2020 Approved JOEY BUCHANAN
Final 6/25/2020 Not Ready for Inspection JOEY BUCHANAN
Green Building Final 6/25/2020 Approved JOEY BUCHANAN
Reinforced Concrete Frame 6/25/2020 Approved JOEY BUCHANAN
Reinforced Masonry Frame 6/25/2020 Approved JOEY BUCHANAN
SGSOV-Seismic Gas S/O Valve 6/25/2020 SGSOV Approved JOEY BUCHANAN
Smoke Detectors 6/25/2020 Approved JOEY BUCHANAN
Final 7/6/2020 Conditional Approval JOEY BUCHANAN
Special/Order Compliance 12/10/2020 Approved JOEY BUCHANAN
Final 12/22/2020 OK to Issue CofO JOEY BUCHANAN