2826 E 1ST ST 90033

Certificate Information: 2826 E 1ST ST 90033

Application / Permit
17016-10000-26782
Plan Check / Job No.
B17LA16638
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(27) Joint Living and Working Quarters
Work Description
CHANGE OF USE FROM WAREHOUSE TO RECORDING STUDIO, OFFICE, ACCESSORY STORAGE, AND (ONE) LIVE-WORK UNITS ON 2ND FLOOR. STRUCTURAL UPGRADE
Permit Issued
Issued on 8/3/2018
Issuing Office
Metro
Current Status
CofO Issued on 11/8/2019
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/14/2017 APPLICANT
Assigned to Plan Check Engineer 9/21/2017 SAM CHANG
Disabled Access Plans Picked Up 9/27/2017 APPLICANT
Green Plans Picked Up 9/28/2017 APPLICANT
Corrections Issued 10/3/2017 SAM CHANG
Quality Review Completed 10/11/2017 JOHN VASQUEZ
Building Plans Picked Up 10/12/2017 APPLICANT
Applicant returned to address corrections 11/21/2017 SAM CHANG
Applicant returned to address corrections 12/7/2017 SAM CHANG
Applicant returned to address corrections 1/17/2018 SAM CHANG
Plan Check Approved 1/31/2018 SAM CHANG
Plan Check Approved 6/14/2018 SAM CHANG
Issued 8/3/2018 LADBS
CofO in Progress 11/7/2019 JEFFREY FULTON
CofO Issued 11/8/2019 DAVID TSAU
Permit Finaled 11/8/2019 DAVID TSAU

Permit Application Clearance Information

CPC Cleared 1/17/2018 BRIAN CARR
CPC Cleared 1/17/2018 BRIAN CARR
CPC Cleared 1/17/2018 BRIAN CARR
Eng Process Fee Ord 176,300 Cleared 1/17/2018 STEVE MELGAR
Hydrant and Access approval Cleared 1/17/2018 GILBERT URREA
Sewer availability Cleared 1/17/2018 STEVE MELGAR
ZI Cleared 1/17/2018 BRIAN CARR
Grading Pre-Inspection Cleared 1/23/2018 PATRICK MISCHLICH
Green Code Cleared 1/23/2018 SEAN DANG
Project located in CRA area Cleared 1/24/2018 JIM URQUHART
Metro Rail approval Cleared 1/25/2018 JOHN VASQUEZ
DAS Clearance Cleared 1/31/2018 WAI LAU
Permit Cleared 6/14/2018 MICHAEL CASTILLO

Contact Information

Architect Reuter, Dean Thomas; Lic. No.: C10934 480 PALOS VERDES BLVD      REDONDO BEACH, CA 90277
Contractor 2h Construction Inc; Lic. No.: 741856-B 2653 WALNUT AVENUE      SIGNAL HILL, CA 90755
Engineer Stovner, Eric Christian; Lic. No.: S4204 2301 N BAKER ST      SANTA ANA, CA 927061948

Inspector Information

JULIAN CAPUCETTI, (213) 202-2643 Office Hours: 7:00-8:00 AM MON-FRI
RAFAEL CORTES, (213) 202-2643 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Floor/Roof Diaphrgm/Shear Wall 9/5/2018 Partial Inspection JEFFREY FULTON
METHANE-Rough 9/5/2018 Not Ready for Inspection JEFFREY FULTON
Wood Frame 9/5/2018 Partial Inspection JEFFREY FULTON
Deputy Drilled-In Anchors 9/20/2018 Conditional Approval JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 9/21/2018 Corrections Issued JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 9/27/2018 Partial Inspection JEFFREY FULTON
METHANE-Rough 9/27/2018 Approved JEFFREY FULTON
Wood Frame 9/27/2018 Partial Inspection JEFFREY FULTON
Wood Frame 10/2/2018 Partial Inspection JEFFREY FULTON
Insulation 10/9/2018 Conditional Approval JEFFREY FULTON
Wood Frame 10/9/2018 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 10/16/2018 Partial Inspection JEFFREY FULTON
Drywall Nailing 10/18/2018 Partial Inspection JEFFREY FULTON
Interior/Exterior Lathing 10/18/2018 Partial Inspection JEFFREY FULTON
Deputy Drilled-In Anchors 11/28/2018 Conditional Approval JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 11/29/2018 Partial Inspection JEFFREY FULTON
Wood Frame 11/29/2018 Corrections Issued JEFFREY FULTON
Deputy Reinf. Concrete 12/3/2018 Conditional Approval JEFFREY FULTON
Wood Frame 12/17/2018 Not Ready for Inspection JEFFREY FULTON
Wood Frame 12/19/2018 Partial Inspection JEFFREY FULTON
Insulation 12/26/2018 Partial Inspection JEFFREY FULTON
Drywall Nailing 1/10/2019 Partial Inspection JEFFREY FULTON
Wood Frame 1/16/2019 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 1/23/2019 Partial Inspection JEFFREY FULTON
Interior/Exterior Lathing 1/23/2019 Approved JEFFREY FULTON
Wood Frame 1/23/2019 Partial Inspection JEFFREY FULTON
Wood Frame 2/5/2019 Partial Approval NICK DANERI
Insulation 2/7/2019 Partial Inspection ERNESTO CORRAL
Drywall Nailing 2/19/2019 Partial Inspection ERNESTO CORRAL
Light Gage Steel Frame 2/20/2019 Partial Approval NICK DANERI
Drywall Nailing 3/4/2019 Partial Inspection JEFFREY FULTON
Drywall Nailing 3/27/2019 Partial Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 4/26/2019 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 5/7/2019 Conditional Approval FELIX CEBALLOS
Excavation/Setback/Form/Re-Bar 5/17/2019 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 5/30/2019 Partial Inspection JEFFREY FULTON
Deputy Steel/Welding 6/12/2019 Conditional Approval JEFFREY FULTON
Deputy Steel/Welding 6/13/2019 Conditional Approval JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 6/13/2019 Partial Inspection JEFFREY FULTON
Deputy Drilled-In Anchors 6/18/2019 Conditional Approval JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 6/20/2019 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 6/27/2019 Conditional Approval JEFFREY FULTON
Light Gage Steel Frame 7/3/2019 Partial Inspection JEFFREY FULTON
Deputy Reinf. Concrete 7/8/2019 Conditional Approval JEFFREY FULTON
Deputy Drilled-In Anchors 8/5/2019 Conditional Approval JEFFREY FULTON
Deputy Steel/Welding 8/5/2019 Conditional Approval JEFFREY FULTON
Deputy Steel/Welding 8/6/2019 Conditional Approval JEFFREY FULTON
Deputy Drilled-In Anchors 8/7/2019 Conditional Approval JEFFREY FULTON
Deputy Steel/Welding 8/7/2019 Conditional Approval JEFFREY FULTON
Deputy Drilled-In Anchors 8/12/2019 Conditional Approval JEFFREY FULTON
Deputy Fireproofing 8/12/2019 Conditional Approval JEFFREY FULTON
Deputy Drilled-In Anchors 8/13/2019 Conditional Approval JEFFREY FULTON
Deputy Fireproofing 8/13/2019 Conditional Approval JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 8/14/2019 Partial Inspection JEFFREY FULTON
Structural Steel Frame 8/14/2019 Partial Inspection JEFFREY FULTON
Deputy Fireproofing 8/28/2019 Conditional Approval JEFFREY FULTON
Final 10/25/2019 Not Ready for Inspection JEFFREY FULTON
SGSOV-Seismic Gas S/O Valve 10/25/2019 SGSOV Not Ready JEFFREY FULTON
Smoke Detectors 10/25/2019 Approved JEFFREY FULTON
Wood Frame 10/25/2019 Approved JEFFREY FULTON
Final 11/4/2019 Conditional Approval JEFFREY FULTON
SGSOV-Seismic Gas S/O Valve 11/4/2019 SGSOV Approved JEFFREY FULTON