Green Building Rough
|
5/4/2022
|
Not Ready for Inspection
|
KATY RAMIREZ
|
Reinforced Concrete Frame
|
5/4/2022
|
Not Ready for Inspection
|
KATY RAMIREZ
|
Verify Sprinkler Sign Off
|
5/4/2022
|
Not Ready for Inspection
|
KATY RAMIREZ
|
Footing/Foundation/Slab
|
5/6/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
Footing/Foundation/Slab
|
5/16/2022
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Methane Barrier
|
5/17/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
5/20/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Footing/Foundation/Slab
|
5/20/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Excavation/Setback/Form/Re-Bar
|
5/23/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Green Building Rough
|
5/23/2022
|
Approved
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
5/23/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Piling/Pier/Caisson
|
5/24/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Footing/Foundation/Slab
|
5/25/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
5/25/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Footing/Foundation/Slab
|
5/27/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
5/31/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Piling/Pier/Caisson
|
6/1/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Footing/Foundation/Slab
|
6/2/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Footing/Foundation/Slab
|
6/7/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Methane Barrier
|
6/9/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
6/22/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Footing/Foundation/Slab
|
6/22/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
6/23/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Methane Barrier
|
6/28/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
6/28/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
Reinforced Concrete Frame
|
6/28/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
6/29/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Footing/Foundation/Slab
|
6/29/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
6/29/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Verify Sprinkler Sign Off
|
6/29/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
6/30/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
7/1/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
Reinforced Concrete Frame
|
7/7/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
Verify Sprinkler Sign Off
|
7/7/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
7/8/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Footing/Foundation/Slab
|
7/8/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
7/11/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
7/12/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
7/12/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
7/12/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Reinforced Masonry Frame
|
7/12/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
Verify Sprinkler Sign Off
|
7/12/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
7/13/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
7/14/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Piling/Pier/Caisson
|
7/14/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
7/15/2022
|
Conditional Approval
|
TED RIES
|
Deputy Reinf. Concrete
|
7/18/2022
|
Conditional Approval
|
WINSTON DUNNING
|
Reinforced Concrete Frame
|
7/18/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Verify Sprinkler Sign Off
|
7/18/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Deputy Methane Barrier
|
7/19/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
7/19/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
7/19/2022
|
Conditional Approval
|
WINSTON DUNNING
|
Footing/Foundation/Slab
|
7/19/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
7/20/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Shotcrete
|
7/20/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Shotcrete
|
7/20/2022
|
Conditional Approval
|
WINSTON DUNNING
|
Reinforced Masonry Frame
|
7/20/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Deputy Other (see comments)
|
7/21/2022
|
Conditional Approval
|
WINSTON DUNNING
|
Deputy Reinf. Concrete
|
7/21/2022
|
Conditional Approval
|
WINSTON DUNNING
|
Footing/Foundation/Slab
|
7/21/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
7/22/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Excavation/Setback/Form/Re-Bar
|
7/22/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
7/27/2022
|
Conditional Approval
|
WINSTON DUNNING
|
Deputy Shotcrete
|
7/27/2022
|
Conditional Approval
|
WINSTON DUNNING
|
Deputy Reinf. Concrete
|
7/28/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Shotcrete
|
7/28/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
7/28/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Shotcrete
|
7/29/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
7/29/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Methane Barrier
|
8/2/2022
|
Conditional Approval
|
WINSTON DUNNING
|
Deputy Reinf. Concrete
|
8/2/2022
|
Conditional Approval
|
WINSTON DUNNING
|
Excavation/Setback/Form/Re-Bar
|
8/2/2022
|
Partial Approval
|
TED RIES
|
Reinforced Concrete Frame
|
8/2/2022
|
Partial Approval
|
TED RIES
|
Structural Steel Frame
|
8/2/2022
|
Not Ready for Inspection
|
TED RIES
|
Verify Sprinkler Sign Off
|
8/2/2022
|
Not Ready for Inspection
|
TED RIES
|
Deputy Reinf. Concrete
|
8/3/2022
|
Conditional Approval
|
TED RIES
|
Reinforced Masonry Frame
|
8/3/2022
|
Partial Approval
|
TED RIES
|
Deputy Shotcrete
|
8/4/2022
|
Conditional Approval
|
TED RIES
|
Deputy Shotcrete
|
8/5/2022
|
Conditional Approval
|
TED RIES
|
Footing/Foundation/Slab
|
8/5/2022
|
Not Ready for Inspection
|
TED RIES
|
Deputy Shotcrete
|
8/8/2022
|
Conditional Approval
|
TED RIES
|
Piling/Pier/Caisson
|
8/8/2022
|
Partial Approval
|
TED RIES
|
Deputy Methane Barrier
|
8/9/2022
|
Conditional Approval
|
TED RIES
|
Excavation/Setback/Form/Re-Bar
|
8/9/2022
|
Conditional Approval
|
TED RIES
|
Deputy Reinf. Concrete
|
8/10/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
8/10/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Verify Sprinkler Sign Off
|
8/10/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Footing/Foundation/Slab
|
8/17/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
8/19/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
Footing/Foundation/Slab
|
8/24/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Pre-Stress Concrete
|
8/25/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
8/25/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Pre-Stress Concrete
|
8/26/2022
|
Conditional Approval
|
WINSTON DUNNING
|
Deputy Reinf. Concrete
|
8/26/2022
|
Conditional Approval
|
WINSTON DUNNING
|
Deputy Pre-Stress Concrete
|
8/29/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
8/29/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Pre-Stress Concrete
|
8/30/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
8/30/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Shotcrete
|
8/30/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
8/30/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Pre-Stress Concrete
|
8/31/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
8/31/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
9/1/2022
|
Conditional Approval
|
WINSTON DUNNING
|
Deputy Pre-Stress Concrete
|
9/2/2022
|
Conditional Approval
|
WINSTON DUNNING
|
Deputy Pre-Stress Concrete
|
9/9/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
9/9/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
9/9/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Verify Sprinkler Sign Off
|
9/9/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Deputy Pre-Stress Concrete
|
9/12/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
9/13/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
9/14/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
9/14/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
Deputy Pre-Stress Concrete
|
9/15/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
9/15/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Verify Sprinkler Sign Off
|
9/15/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Deputy Shotcrete
|
9/16/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Footing/Foundation/Slab
|
9/16/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Pre-Stress Concrete
|
9/19/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
9/19/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
9/21/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
9/21/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Shotcrete
|
9/21/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
9/23/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Footing/Foundation/Slab
|
9/23/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Deputy Pre-Stress Concrete
|
9/29/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
9/29/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
9/30/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Pre-Stress Concrete
|
10/3/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
10/3/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Pre-Stress Concrete
|
10/5/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
10/5/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Pre-Stress Concrete
|
10/12/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
10/12/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
10/12/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Verify Sprinkler Sign Off
|
10/12/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Deputy Pre-Stress Concrete
|
10/13/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Shotcrete
|
10/13/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
10/13/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Structural Steel Frame
|
10/13/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
Deputy Pre-Stress Concrete
|
10/14/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Shotcrete
|
10/14/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Reinforced Concrete Frame
|
10/17/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
10/20/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Verify Sprinkler Sign Off
|
10/20/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
10/24/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Other (see comments)
|
10/28/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
10/28/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
10/28/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Reinforced Concrete Frame
|
10/28/2022
|
Partial Approval
|
JAMES POWERS
|
Verify Sprinkler Sign Off
|
10/28/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
Deputy Pre-Stress Concrete
|
11/2/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
11/2/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Reinforced Concrete Frame
|
11/3/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Pre-Stress Concrete
|
11/7/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
11/7/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
11/8/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
11/8/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
11/8/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Verify Sprinkler Sign Off
|
11/8/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Deputy Pre-Stress Concrete
|
11/9/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
11/9/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
11/9/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Pre-Stress Concrete
|
11/10/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
11/10/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
11/15/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
11/15/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
11/16/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
11/16/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Verify Sprinkler Sign Off
|
11/16/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Deputy Pre-Stress Concrete
|
11/17/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
11/17/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Pre-Stress Concrete
|
11/18/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
11/21/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
11/21/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
11/22/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
11/22/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Pre-Stress Concrete
|
11/23/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Shotcrete
|
11/23/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
11/23/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Verify Sprinkler Sign Off
|
11/23/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
11/28/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Pre-Stress Concrete
|
11/30/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
11/30/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Pre-Stress Concrete
|
12/5/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
12/5/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
12/5/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Methane Barrier
|
12/7/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
12/7/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
12/7/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
12/7/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
12/7/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Pre-Stress Concrete
|
12/8/2022
|
Conditional Approval
|
KATY RAMIREZ
|
Reinforced Masonry Frame
|
12/8/2022
|
Partial Approval
|
KATY RAMIREZ
|
Deputy Pre-Stress Concrete
|
12/9/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
12/9/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Reinforced Concrete Frame
|
12/9/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Verify Sprinkler Sign Off
|
12/9/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
Deputy Pre-Stress Concrete
|
12/12/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
12/13/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
12/14/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
12/15/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Steel/Welding
|
12/15/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
12/15/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Verify Sprinkler Sign Off
|
12/15/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Deputy Pre-Stress Concrete
|
12/16/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
12/16/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
12/19/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Steel/Welding
|
12/19/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Footing/Foundation/Slab
|
12/19/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Pre-Stress Concrete
|
12/20/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
12/20/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
12/21/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
12/21/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
12/22/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
12/22/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
12/23/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
12/23/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Reinforced Concrete Frame
|
12/23/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Pre-Stress Concrete
|
12/27/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
12/27/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Drilled-In Anchors
|
12/28/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
12/28/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
12/28/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
12/29/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Steel/Welding
|
12/29/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
12/29/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
Verify Sprinkler Sign Off
|
12/29/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Deputy Pre-Stress Concrete
|
12/30/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
12/30/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Pre-Stress Concrete
|
1/3/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
1/3/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
1/4/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
1/4/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
1/5/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
Deputy Steel/Welding
|
1/5/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
Footing/Foundation/Slab
|
1/5/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
Deputy Reinf. Concrete
|
1/6/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Steel/Welding
|
1/6/2023
|
Conditional Approval
|
GREGORY POMISH
|
Drywall Nailing
|
1/6/2023
|
Partial Approval
|
GREGORY POMISH
|
Light Gage Steel Frame
|
1/6/2023
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Concrete
|
1/9/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
1/9/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
1/10/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
1/11/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
1/11/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Drilled-In Anchors
|
1/12/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
1/12/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Steel/Welding
|
1/12/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Footing/Foundation/Slab
|
1/12/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
1/13/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
1/13/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
1/17/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
1/17/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Wood Construction
|
1/17/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
1/18/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
1/18/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Wood Construction
|
1/18/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
1/19/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Steel/Welding
|
1/19/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Wood Construction
|
1/19/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Drywall Nailing
|
1/19/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Light Gage Steel Frame
|
1/19/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
1/20/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
1/20/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Wood Construction
|
1/20/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
1/23/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Steel/Welding
|
1/23/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Wood Construction
|
1/23/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Reinforced Concrete Frame
|
1/23/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Verify Sprinkler Sign Off
|
1/23/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
1/24/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
1/24/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
1/25/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
1/25/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Wood Construction
|
1/25/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
1/26/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Steel/Welding
|
1/26/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Wood Construction
|
1/26/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Floor/Roof Diaphrgm/Shear Wall
|
1/26/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
1/27/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Steel/Welding
|
1/27/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Wood Construction
|
1/27/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Drywall Nailing
|
1/27/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Footing/Foundation/Slab
|
1/27/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Light Gage Steel Frame
|
1/27/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Concrete
|
1/30/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
1/30/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Wood Construction
|
1/30/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Concrete
|
1/31/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
1/31/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Wood Construction
|
1/31/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
2/1/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
2/2/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Floor/Roof Diaphrgm/Shear Wall
|
2/2/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Drywall Nailing
|
2/3/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Light Gage Steel Frame
|
2/3/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Drilled-In Anchors
|
2/8/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
2/8/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Wood Construction
|
2/8/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
2/9/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Wood Construction
|
2/9/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Floor/Roof Diaphrgm/Shear Wall
|
2/9/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Steel/Welding
|
2/10/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Wood Construction
|
2/10/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Drywall Nailing
|
2/10/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Floor/Roof Diaphrgm/Shear Wall
|
2/10/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Light Gage Steel Frame
|
2/10/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Steel/Welding
|
2/13/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Wood Construction
|
2/13/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Drywall Nailing
|
2/13/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Steel/Welding
|
2/14/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Wood Construction
|
2/14/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
2/15/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Floor/Roof Diaphrgm/Shear Wall
|
2/15/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Steel/Welding
|
2/16/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
2/17/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Drywall Nailing
|
2/17/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Floor/Roof Diaphrgm/Shear Wall
|
2/17/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Steel/Welding
|
2/21/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
2/22/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Masonry
|
2/23/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
Deputy Steel/Welding
|
2/23/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
Deputy Wood Construction
|
2/23/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
Floor/Roof Diaphrgm/Shear Wall
|
2/23/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
Deputy Reinf. Masonry
|
2/27/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
2/27/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Wood Construction
|
2/27/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Masonry
|
3/2/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Steel/Welding
|
3/2/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Wood Construction
|
3/2/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Drywall Nailing
|
3/2/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Light Gage Steel Frame
|
3/2/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Masonry
|
3/3/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Steel/Welding
|
3/3/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Wood Construction
|
3/3/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Floor/Roof Diaphrgm/Shear Wall
|
3/3/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Masonry
|
3/7/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Steel/Welding
|
3/7/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Wood Construction
|
3/7/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Floor/Roof Diaphrgm/Shear Wall
|
3/7/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
Light Gage Steel Frame
|
3/7/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
Deputy Reinf. Masonry
|
3/8/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
3/8/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Wood Construction
|
3/8/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Masonry
|
3/9/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Steel/Welding
|
3/9/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Wood Construction
|
3/9/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Drywall Nailing
|
3/9/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Light Gage Steel Frame
|
3/9/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Steel/Welding
|
3/10/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
3/13/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Floor/Roof Diaphrgm/Shear Wall
|
3/13/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Reinforced Masonry Frame
|
3/13/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Verify Sprinkler Sign Off
|
3/13/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
Deputy Steel/Welding
|
3/14/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Floor/Roof Diaphrgm/Shear Wall
|
3/14/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Steel/Welding
|
3/15/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
3/16/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
3/17/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
Drywall Nailing
|
3/17/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
Deputy Reinf. Masonry
|
3/20/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Steel/Welding
|
3/20/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Wood Construction
|
3/20/2023
|
Conditional Approval
|
GREGORY POMISH
|
Floor/Roof Diaphrgm/Shear Wall
|
3/20/2023
|
Partial Approval
|
GREGORY POMISH
|
Deputy Reinf. Masonry
|
3/21/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
3/21/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Wood Construction
|
3/21/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Masonry
|
3/22/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
3/22/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Wood Construction
|
3/22/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Masonry
|
3/23/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
3/23/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Wood Construction
|
3/23/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Masonry
|
3/24/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Steel/Welding
|
3/24/2023
|
Conditional Approval
|
GREGORY POMISH
|
Deputy Wood Construction
|
3/24/2023
|
Conditional Approval
|
GREGORY POMISH
|
Floor/Roof Diaphrgm/Shear Wall
|
3/24/2023
|
Partial Inspection
|
GREGORY POMISH
|
Deputy Reinf. Masonry
|
3/28/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
Deputy Steel/Welding
|
3/28/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
Deputy Wood Construction
|
3/28/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
Floor/Roof Diaphrgm/Shear Wall
|
3/28/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
Deputy Reinf. Masonry
|
4/3/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Steel/Welding
|
4/3/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Wood Construction
|
4/3/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Floor/Roof Diaphrgm/Shear Wall
|
4/3/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Masonry
|
4/4/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Steel/Welding
|
4/4/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Wood Construction
|
4/4/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Masonry Wall/Backfill
|
4/4/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Masonry
|
4/7/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Steel/Welding
|
4/7/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Wood Construction
|
4/7/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Floor/Roof Diaphrgm/Shear Wall
|
4/7/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Masonry
|
4/10/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
4/10/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Wood Construction
|
4/10/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Masonry
|
4/11/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Steel/Welding
|
4/11/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Wood Construction
|
4/11/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Drywall Nailing
|
4/11/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Floor/Roof Diaphrgm/Shear Wall
|
4/11/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Light Gage Steel Frame
|
4/11/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Reinforced Masonry Frame
|
4/11/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Masonry
|
4/12/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
4/12/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Wood Construction
|
4/12/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Drilled-In Anchors
|
4/14/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Reinf. Masonry
|
4/14/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
4/14/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Wood Construction
|
4/14/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
4/17/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Drilled-In Anchors
|
4/18/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Steel/Welding
|
4/18/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Floor/Roof Diaphrgm/Shear Wall
|
4/18/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Steel/Welding
|
4/19/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Drywall Nailing
|
4/19/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Steel/Welding
|
4/20/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Reinforced Masonry Frame
|
4/20/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Drilled-In Anchors
|
4/25/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Reinf. Masonry
|
4/25/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
4/25/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Wood Construction
|
4/25/2023
|
Conditional Approval
|
LARRY ARNICK
|
Floor/Roof Diaphrgm/Shear Wall
|
4/25/2023
|
Partial Approval
|
LARRY ARNICK
|
Masonry Wall/Backfill
|
4/25/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Drilled-In Anchors
|
4/26/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Masonry
|
4/26/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
4/26/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Wood Construction
|
4/26/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Drilled-In Anchors
|
4/27/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Masonry
|
4/27/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
4/27/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Wood Construction
|
4/27/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Drilled-In Anchors
|
4/28/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Masonry
|
4/28/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Steel/Welding
|
4/28/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Wood Construction
|
4/28/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Drywall Nailing
|
4/28/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Reinf. Masonry
|
5/1/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
5/1/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Wood Construction
|
5/1/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
5/2/2023
|
Conditional Approval
|
LARRY ARNICK
|
Floor/Roof Diaphrgm/Shear Wall
|
5/2/2023
|
Partial Approval
|
LARRY ARNICK
|
Masonry Wall/Backfill
|
5/2/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
5/3/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Masonry
|
5/4/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
5/4/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Wood Construction
|
5/4/2023
|
Conditional Approval
|
LARRY ARNICK
|
Drywall Nailing
|
5/4/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
Insulation
|
5/4/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
Deputy Reinf. Masonry
|
5/5/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
5/5/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Wood Construction
|
5/5/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Drilled-In Anchors
|
5/8/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Reinf. Masonry
|
5/8/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
5/8/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Wood Construction
|
5/8/2023
|
Conditional Approval
|
LARRY ARNICK
|
Drywall Nailing
|
5/8/2023
|
Partial Approval
|
LARRY ARNICK
|
Masonry Wall/Backfill
|
5/8/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Drilled-In Anchors
|
5/9/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Masonry
|
5/9/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
5/9/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Wood Construction
|
5/9/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Masonry
|
5/10/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
5/10/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Wood Construction
|
5/10/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
5/11/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
5/12/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Drilled-In Anchors
|
5/15/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
5/15/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Masonry
|
5/16/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
5/16/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Drilled-In Anchors
|
5/17/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Reinf. Masonry
|
5/17/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
5/17/2023
|
Conditional Approval
|
LARRY ARNICK
|
Masonry Wall/Backfill
|
5/17/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Reinf. Masonry
|
5/18/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
5/18/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Masonry
|
5/19/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
5/19/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Drywall Nailing
|
5/19/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Drilled-In Anchors
|
5/22/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Masonry
|
5/22/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
5/22/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Drilled-In Anchors
|
5/24/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
5/24/2023
|
Conditional Approval
|
LARRY ARNICK
|
Drywall Nailing
|
5/24/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Drilled-In Anchors
|
5/25/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Reinf. Masonry
|
5/25/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
5/25/2023
|
Conditional Approval
|
LARRY ARNICK
|
Masonry Wall/Backfill
|
5/25/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Drilled-In Anchors
|
5/30/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Masonry
|
5/30/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
5/30/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Drilled-In Anchors
|
5/31/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Reinf. Masonry
|
5/31/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
5/31/2023
|
Conditional Approval
|
LARRY ARNICK
|
Masonry Wall/Backfill
|
5/31/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Drilled-In Anchors
|
6/1/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Reinf. Masonry
|
6/1/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
6/1/2023
|
Conditional Approval
|
LARRY ARNICK
|
Drywall Nailing
|
6/1/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Drilled-In Anchors
|
6/2/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
6/2/2023
|
Conditional Approval
|
LARRY ARNICK
|
Wood Frame
|
6/2/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Drilled-In Anchors
|
6/5/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Reinf. Masonry
|
6/5/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
6/5/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Wood Construction
|
6/5/2023
|
Conditional Approval
|
LARRY ARNICK
|
Floor/Roof Diaphrgm/Shear Wall
|
6/5/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Reinf. Masonry
|
6/6/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
6/6/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Wood Construction
|
6/6/2023
|
Conditional Approval
|
LARRY ARNICK
|
Floor/Roof Diaphrgm/Shear Wall
|
6/6/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Reinf. Masonry
|
6/7/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
6/7/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Wood Construction
|
6/7/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Reinf. Masonry
|
6/9/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
6/9/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Wood Construction
|
6/9/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
6/12/2023
|
Conditional Approval
|
LARRY ARNICK
|
Floor/Roof Diaphrgm/Shear Wall
|
6/12/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
Deputy Steel/Welding
|
6/13/2023
|
Conditional Approval
|
LARRY ARNICK
|
Insulation
|
6/13/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
Deputy Steel/Welding
|
6/14/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
6/15/2023
|
Conditional Approval
|
LARRY ARNICK
|
Floor/Roof Diaphrgm/Shear Wall
|
6/15/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Drilled-In Anchors
|
6/16/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
6/16/2023
|
Conditional Approval
|
LARRY ARNICK
|
Wood Frame
|
6/16/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
6/21/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Wood Construction
|
6/21/2023
|
Conditional Approval
|
LARRY ARNICK
|
Floor/Roof Diaphrgm/Shear Wall
|
6/21/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
6/22/2023
|
Conditional Approval
|
KATY RAMIREZ
|
Deputy Wood Construction
|
6/22/2023
|
Conditional Approval
|
KATY RAMIREZ
|
Wood Frame
|
6/22/2023
|
Partial Approval
|
KATY RAMIREZ
|
Deputy Steel/Welding
|
6/23/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Wood Construction
|
6/23/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Floor/Roof Diaphrgm/Shear Wall
|
6/23/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Insulation
|
6/23/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Steel/Welding
|
6/26/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Wood Frame
|
6/26/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Steel/Welding
|
6/27/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
6/28/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
6/29/2023
|
Conditional Approval
|
LARRY ARNICK
|
Floor/Roof Diaphrgm/Shear Wall
|
6/29/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
6/30/2023
|
Conditional Approval
|
LARRY ARNICK
|
Wood Frame
|
6/30/2023
|
Corrections Issued
|
LARRY ARNICK
|
Deputy Drilled-In Anchors
|
7/3/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
7/3/2023
|
Conditional Approval
|
LARRY ARNICK
|
Floor/Roof Diaphrgm/Shear Wall
|
7/3/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
7/6/2023
|
Conditional Approval
|
LARRY ARNICK
|
Floor/Roof Diaphrgm/Shear Wall
|
7/6/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
Floor/Roof Diaphrgm/Shear Wall
|
7/7/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Wood Frame
|
7/7/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Steel/Welding
|
7/10/2023
|
Conditional Approval
|
LARRY ARNICK
|
Floor/Roof Diaphrgm/Shear Wall
|
7/10/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
7/11/2023
|
Conditional Approval
|
LARRY ARNICK
|
Floor/Roof Diaphrgm/Shear Wall
|
7/11/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
7/12/2023
|
Conditional Approval
|
LARRY ARNICK
|
Wood Frame
|
7/12/2023
|
Partial Approval
|
LARRY ARNICK
|
Floor/Roof Diaphrgm/Shear Wall
|
7/13/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
7/14/2023
|
Conditional Approval
|
LARRY ARNICK
|
Floor/Roof Diaphrgm/Shear Wall
|
7/14/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
7/17/2023
|
Conditional Approval
|
DARRYL ARNOLD
|
Wood Frame
|
7/17/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
7/18/2023
|
Conditional Approval
|
LARRY ARNICK
|
Floor/Roof Diaphrgm/Shear Wall
|
7/18/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
7/19/2023
|
Conditional Approval
|
LARRY ARNICK
|
Floor/Roof Diaphrgm/Shear Wall
|
7/19/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
7/20/2023
|
Conditional Approval
|
LARRY ARNICK
|
Wood Frame
|
7/20/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
7/21/2023
|
Conditional Approval
|
LARRY ARNICK
|
Floor/Roof Diaphrgm/Shear Wall
|
7/21/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
7/26/2023
|
Conditional Approval
|
LARRY ARNICK
|
Floor/Roof Diaphrgm/Shear Wall
|
7/26/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
8/2/2023
|
Conditional Approval
|
LARRY ARNICK
|
Drywall Nailing
|
8/2/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
8/3/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
8/4/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
8/7/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
8/8/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
8/9/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
8/10/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
8/11/2023
|
Conditional Approval
|
LARRY ARNICK
|
Insulation
|
8/11/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
8/14/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
8/15/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
8/16/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
8/17/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
8/18/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Wood Construction
|
8/18/2023
|
Conditional Approval
|
LARRY ARNICK
|
Floor/Roof Diaphrgm/Shear Wall
|
8/18/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
8/21/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
8/22/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
8/23/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
8/24/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
8/25/2023
|
Conditional Approval
|
LARRY ARNICK
|
Floor/Roof Diaphrgm/Shear Wall
|
8/25/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
Deputy Steel/Welding
|
8/28/2023
|
Conditional Approval
|
LARRY ARNICK
|
Floor/Roof Diaphrgm/Shear Wall
|
8/28/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
8/29/2023
|
Conditional Approval
|
LARRY ARNICK
|
Floor/Roof Diaphrgm/Shear Wall
|
8/29/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Shotcrete
|
8/30/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
8/30/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
8/31/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
9/1/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
9/5/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
9/6/2023
|
Conditional Approval
|
LARRY ARNICK
|
Floor/Roof Diaphrgm/Shear Wall
|
9/6/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
9/7/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Drilled-In Anchors
|
9/8/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
9/8/2023
|
Conditional Approval
|
LARRY ARNICK
|
Floor/Roof Diaphrgm/Shear Wall
|
9/8/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Drilled-In Anchors
|
9/11/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
9/11/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Drilled-In Anchors
|
9/12/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
9/12/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Drilled-In Anchors
|
9/13/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
9/13/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Drilled-In Anchors
|
9/14/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
9/14/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Drilled-In Anchors
|
9/15/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
9/15/2023
|
Conditional Approval
|
LARRY ARNICK
|
Drywall Nailing
|
9/15/2023
|
Partial Approval
|
LARRY ARNICK
|
Insulation
|
9/15/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
9/18/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
9/19/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
9/20/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
9/21/2023
|
Conditional Approval
|
LARRY ARNICK
|
Footing/Foundation/Slab
|
9/21/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Reinf. Concrete
|
9/22/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
9/22/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
9/25/2023
|
Conditional Approval
|
LARRY ARNICK
|
Light Gage Steel Frame
|
9/25/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
9/26/2023
|
Conditional Approval
|
LARRY ARNICK
|
Floor/Roof Diaphrgm/Shear Wall
|
9/26/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
Deputy Reinf. Masonry
|
9/27/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
9/27/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Reinf. Masonry
|
9/28/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
9/28/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Reinf. Masonry
|
9/29/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Steel/Welding
|
9/29/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Insulation
|
9/29/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Light Gage Steel Frame
|
9/29/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Steel/Welding
|
10/2/2023
|
Conditional Approval
|
LARRY ARNICK
|
Insulation
|
10/2/2023
|
Partial Approval
|
LARRY ARNICK
|
Masonry Wall/Backfill
|
10/2/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
10/3/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Reinf. Masonry
|
10/4/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
10/4/2023
|
Conditional Approval
|
LARRY ARNICK
|
Drywall Nailing
|
10/4/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
Deputy Reinf. Masonry
|
10/5/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
10/5/2023
|
Conditional Approval
|
LARRY ARNICK
|
Floor/Roof Diaphrgm/Shear Wall
|
10/5/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
Deputy Reinf. Masonry
|
10/6/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
10/6/2023
|
Conditional Approval
|
LARRY ARNICK
|
Drywall Nailing
|
10/6/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
Pre-Inspection
|
10/6/2023
|
Partial Inspection
|
LARRY ARNICK
|
Deputy Reinf. Masonry
|
10/10/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
10/10/2023
|
Conditional Approval
|
LARRY ARNICK
|
Drywall Nailing
|
10/10/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
Deputy Reinf. Masonry
|
10/11/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
10/11/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Reinf. Masonry
|
10/12/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
10/12/2023
|
Conditional Approval
|
LARRY ARNICK
|
Insulation
|
10/12/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Reinf. Masonry
|
10/13/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
10/13/2023
|
Conditional Approval
|
LARRY ARNICK
|
Drywall Nailing
|
10/13/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
10/16/2023
|
Conditional Approval
|
RICARDO ROBLES
|
Drywall Nailing
|
10/16/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Drilled-In Anchors
|
10/17/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
10/17/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
10/18/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Insulation
|
10/18/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Steel/Welding
|
10/19/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Drilled-In Anchors
|
10/20/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
10/20/2023
|
Conditional Approval
|
LARRY ARNICK
|
Insulation
|
10/20/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
10/23/2023
|
Conditional Approval
|
LARRY ARNICK
|
Insulation
|
10/23/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
Deputy Drilled-In Anchors
|
10/25/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
10/25/2023
|
Conditional Approval
|
LARRY ARNICK
|
Drywall Nailing
|
10/25/2023
|
Partial Approval
|
LARRY ARNICK
|
Insulation
|
10/25/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
10/26/2023
|
Conditional Approval
|
LARRY ARNICK
|
Insulation
|
10/26/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
Deputy Steel/Welding
|
10/27/2023
|
Conditional Approval
|
LARRY ARNICK
|
Drywall Nailing
|
10/27/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
10/30/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
10/31/2023
|
Conditional Approval
|
LARRY ARNICK
|
Drywall Nailing
|
10/31/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
11/2/2023
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
11/3/2023
|
Conditional Approval
|
LARRY ARNICK
|
Drywall Nailing
|
11/3/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
11/6/2023
|
Conditional Approval
|
LARRY ARNICK
|
Drywall Nailing
|
11/6/2023
|
Partial Approval
|
LARRY ARNICK
|
Insulation
|
11/6/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
11/7/2023
|
Conditional Approval
|
LARRY ARNICK
|
Drywall Nailing
|
11/7/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
11/8/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
11/9/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
11/13/2023
|
Conditional Approval
|
LARRY ARNICK
|
Drywall Nailing
|
11/13/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
11/14/2023
|
Conditional Approval
|
LARRY ARNICK
|
Drywall Nailing
|
11/14/2023
|
Partial Approval
|
LARRY ARNICK
|
Insulation
|
11/14/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
11/15/2023
|
Conditional Approval
|
LARRY ARNICK
|
Structural Steel Frame
|
11/15/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
11/17/2023
|
Conditional Approval
|
LARRY ARNICK
|
Insulation
|
11/17/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
11/20/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
11/21/2023
|
Conditional Approval
|
LARRY ARNICK
|
Drywall Nailing
|
11/21/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
Deputy Steel/Welding
|
11/28/2023
|
Conditional Approval
|
LARRY ARNICK
|
Insulation
|
11/28/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
Interior/Exterior Lathing
|
11/28/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
11/29/2023
|
Conditional Approval
|
LARRY ARNICK
|
Drywall Nailing
|
11/29/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
Deputy Steel/Welding
|
11/30/2023
|
Conditional Approval
|
LARRY ARNICK
|
Insulation
|
11/30/2023
|
Partial Approval
|
LARRY ARNICK
|
Interior/Exterior Lathing
|
12/1/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Steel/Welding
|
12/4/2023
|
Conditional Approval
|
LARRY ARNICK
|
Interior/Exterior Lathing
|
12/4/2023
|
Partial Approval
|
LARRY ARNICK
|
Drywall Nailing
|
12/5/2023
|
Partial Approval
|
LARRY ARNICK
|
Drywall Nailing
|
12/7/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
12/12/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
12/14/2023
|
Conditional Approval
|
LARRY ARNICK
|
Insulation
|
12/14/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
12/15/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
12/18/2023
|
Conditional Approval
|
LARRY ARNICK
|
Drywall Nailing
|
12/18/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
12/20/2023
|
Conditional Approval
|
LARRY ARNICK
|
Drywall Nailing
|
12/20/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
12/21/2023
|
Conditional Approval
|
LARRY ARNICK
|
Insulation
|
12/21/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
Deputy Steel/Welding
|
12/22/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Insulation
|
12/22/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
Deputy Steel/Welding
|
12/26/2023
|
Conditional Approval
|
LARRY ARNICK
|
Light Gage Steel Frame
|
12/26/2023
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
12/29/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Drywall Nailing
|
12/29/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Interior/Exterior Lathing
|
12/29/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
Deputy Steel/Welding
|
1/2/2024
|
Conditional Approval
|
LARRY ARNICK
|
Light Gage Steel Frame
|
1/2/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Deputy Steel/Welding
|
1/5/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
1/8/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
1/9/2024
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
1/10/2024
|
Conditional Approval
|
LARRY ARNICK
|
Interior/Exterior Lathing
|
1/10/2024
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
1/11/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
1/12/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
1/16/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
1/17/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Drilled-In Anchors
|
1/18/2024
|
No Access for Inspection
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
1/18/2024
|
No Access for Inspection
|
MICHAEL ROSENBERG
|
Deputy Drilled-In Anchors
|
1/19/2024
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
1/19/2024
|
Conditional Approval
|
LARRY ARNICK
|
Light Gage Steel Frame
|
1/19/2024
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
1/22/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
1/23/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Drilled-In Anchors
|
1/26/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
1/26/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
1/30/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
2/1/2024
|
Conditional Approval
|
LARRY ARNICK
|
Insulation
|
2/1/2024
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
2/2/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
2/6/2024
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
2/9/2024
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
2/12/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
2/13/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
2/14/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
2/20/2024
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
2/21/2024
|
Conditional Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
2/21/2024
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
2/27/2024
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
2/27/2024
|
Conditional Approval
|
LARRY ARNICK
|
Insulation
|
2/27/2024
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
3/4/2024
|
Conditional Approval
|
LARRY ARNICK
|
Drywall Nailing
|
3/4/2024
|
Partial Approval
|
LARRY ARNICK
|
Drywall Nailing
|
3/7/2024
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
3/11/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
3/12/2024
|
Conditional Approval
|
LARRY ARNICK
|
Drywall Nailing
|
3/12/2024
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
3/13/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
3/14/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
3/15/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
3/18/2024
|
No Access for Inspection
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
3/19/2024
|
Conditional Approval
|
LARRY ARNICK
|
Footing/Foundation/Slab
|
3/19/2024
|
Partial Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
3/21/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Deputy Steel/Welding
|
3/26/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
Drywall Nailing
|
3/26/2024
|
Partial Approval
|
RONALD JIMENEZ
|
Deputy Steel/Welding
|
3/28/2024
|
Conditional Approval
|
LARRY ARNICK
|
Reinforced Concrete Frame
|
3/28/2024
|
Partial Approval
|
LARRY ARNICK
|
Verify Sprinkler Sign Off
|
3/28/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Deputy Steel/Welding
|
4/2/2024
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Steel/Welding
|
4/4/2024
|
Conditional Approval
|
LARRY ARNICK
|
Pre-Inspection
|
4/4/2024
|
Approved
|
LARRY ARNICK
|
Deputy Steel/Welding
|
4/8/2024
|
Conditional Approval
|
RAMAZANALI ALMASI
|
Light Gage Steel Frame
|
4/8/2024
|
Not Ready for Inspection
|
RAMAZANALI ALMASI
|
Deputy Steel/Welding
|
4/29/2024
|
Conditional Approval
|
JEFFREY FULTON
|
Drywall Nailing
|
4/29/2024
|
Partial Inspection
|
JEFFREY FULTON
|
Footing/Foundation/Slab
|
4/29/2024
|
Partial Inspection
|
JEFFREY FULTON
|
Light Gage Steel Frame
|
4/29/2024
|
Partial Inspection
|
JEFFREY FULTON
|
Deputy Drilled-In Anchors
|
5/2/2024
|
Conditional Approval
|
JEFFREY FULTON
|
Light Gage Steel Frame
|
5/8/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
Reinforced Concrete Frame
|
5/8/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
Verify Sprinkler Sign Off
|
5/8/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
Deputy Steel/Welding
|
5/13/2024
|
Conditional Approval
|
LARRY ARNICK
|
Light Gage Steel Frame
|
5/13/2024
|
Partial Approval
|
LARRY ARNICK
|
Drywall Nailing
|
5/17/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Reinforced Concrete Frame
|
5/17/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Verify Sprinkler Sign Off
|
5/17/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Drywall Nailing
|
5/21/2024
|
Partial Approval
|
LARRY ARNICK
|
Footing/Foundation/Slab
|
5/29/2024
|
Partial Approval
|
LARRY ARNICK
|
Reinforced Concrete Frame
|
5/29/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Verify Sprinkler Sign Off
|
5/29/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Masonry Wall/Backfill
|
5/31/2024
|
Partial Approval
|
LARRY ARNICK
|
Reinforced Masonry Frame
|
5/31/2024
|
Partial Approval
|
LARRY ARNICK
|
Footing/Foundation/Slab
|
6/4/2024
|
Partial Approval
|
LARRY ARNICK
|
Footing/Foundation/Slab
|
6/7/2024
|
Partial Approval
|
LARRY ARNICK
|
Reinforced Concrete Frame
|
6/14/2024
|
Partial Inspection
|
JEFFREY FULTON
|
Verify Sprinkler Sign Off
|
6/14/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
Footing/Foundation/Slab
|
6/17/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Drywall Nailing
|
6/21/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Light Gage Steel Frame
|
6/21/2024
|
Partial Approval
|
LARRY ARNICK
|
Reinforced Concrete Frame
|
6/25/2024
|
Partial Approval
|
LARRY ARNICK
|
Verify Sprinkler Sign Off
|
6/25/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Footing/Foundation/Slab
|
6/26/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Reinforced Concrete Frame
|
6/27/2024
|
Partial Approval
|
LARRY ARNICK
|
Interior/Exterior Lathing
|
7/1/2024
|
Partial Approval
|
LARRY ARNICK
|
Reinforced Concrete Frame
|
7/8/2024
|
Partial Approval
|
LARRY ARNICK
|
Verify Sprinkler Sign Off
|
7/8/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Reinforced Concrete Frame
|
7/12/2024
|
Partial Approval
|
LARRY ARNICK
|
Verify Sprinkler Sign Off
|
7/12/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Reinforced Concrete Frame
|
7/19/2024
|
Partial Approval
|
LARRY ARNICK
|
Verify Sprinkler Sign Off
|
7/19/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Footing/Foundation/Slab
|
7/31/2024
|
Partial Approval
|
LARRY ARNICK
|
Light Gage Steel Frame
|
8/16/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Footing/Foundation/Slab
|
9/27/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Final
|
11/19/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Footing/Foundation/Slab
|
11/19/2024
|
Approved
|
LARRY ARNICK
|
Green Building Final
|
11/19/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Reinforced Concrete Frame
|
11/19/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Reinforced Masonry Frame
|
11/19/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
SGSOV-Seismic Gas S/O Valve
|
11/19/2024
|
SGSOV Not Ready
|
LARRY ARNICK
|
Smoke Detectors
|
11/19/2024
|
Approved
|
LARRY ARNICK
|
Verify Sprinkler Sign Off
|
11/19/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Pre-Inspection
|
11/20/2024
|
Partial Approval
|
LARRY ARNICK
|
Light Gage Steel Frame
|
11/21/2024
|
Partial Approval
|
LARRY ARNICK
|
Wall Anchors
|
11/21/2024
|
Approved
|
LARRY ARNICK
|
Pre-Inspection
|
11/22/2024
|
Partial Approval
|
LARRY ARNICK
|
Final
|
11/26/2024
|
Partial Inspection
|
LARRY ARNICK
|
Green Building Final
|
11/26/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Reinforced Concrete Frame
|
11/26/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Reinforced Masonry Frame
|
11/26/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
SGSOV-Seismic Gas S/O Valve
|
11/26/2024
|
SGSOV Not Ready
|
LARRY ARNICK
|
Verify Sprinkler Sign Off
|
11/26/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Light Gage Steel Frame
|
11/27/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Structural Steel Frame
|
11/27/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Pre-Inspection
|
12/2/2024
|
Partial Inspection
|
LARRY ARNICK
|
Final
|
12/3/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Green Building Final
|
12/3/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Reinforced Concrete Frame
|
12/3/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Reinforced Masonry Frame
|
12/3/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
SGSOV-Seismic Gas S/O Valve
|
12/3/2024
|
SGSOV Not Ready
|
LARRY ARNICK
|
Verify Sprinkler Sign Off
|
12/3/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Wall Anchors
|
12/3/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Floor/Roof Diaphrgm/Shear Wall
|
12/4/2024
|
Approved
|
LARRY ARNICK
|
Drywall Nailing
|
12/5/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Final
|
12/10/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Green Building Final
|
12/10/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Reinforced Concrete Frame
|
12/10/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Reinforced Masonry Frame
|
12/10/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
SGSOV-Seismic Gas S/O Valve
|
12/10/2024
|
SGSOV Not Ready
|
LARRY ARNICK
|
Verify Sprinkler Sign Off
|
12/10/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Floor/Roof Diaphrgm/Shear Wall
|
12/11/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Drywall Nailing
|
12/12/2024
|
Approved
|
LARRY ARNICK
|
Final
|
12/17/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Green Building Final
|
12/17/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
Reinforced Concrete Frame
|
12/17/2024
|
Approved
|
LARRY ARNICK
|
Reinforced Masonry Frame
|
12/17/2024
|
Approved
|
LARRY ARNICK
|
SGSOV-Seismic Gas S/O Valve
|
12/17/2024
|
SGSOV Approved
|
LARRY ARNICK
|
T-Bar Ceiling
|
12/17/2024
|
Approved
|
LARRY ARNICK
|
Verify Sprinkler Sign Off
|
12/17/2024
|
Approved
|
LARRY ARNICK
|