Piling/Pier/Caisson
|
4/3/2020
|
Partial Approval
|
JONATHAN ALLEN
|
Piling/Pier/Caisson
|
4/4/2020
|
Partial Inspection
|
NICK LAROCCA
|
Piling/Pier/Caisson
|
4/7/2020
|
Partial Approval
|
JONATHAN ALLEN
|
Piling/Pier/Caisson
|
4/9/2020
|
Corrections Issued
|
JONATHAN ALLEN
|
Special/Order Compliance
|
5/13/2020
|
Corrections Issued
|
JONATHAN ALLEN
|
Pre-Inspection
|
8/4/2020
|
Partial Approval
|
JONATHAN ALLEN
|
Pre-Inspection
|
8/26/2020
|
Partial Approval
|
JONATHAN ALLEN
|
Pre-Inspection
|
8/27/2020
|
Partial Approval
|
JONATHAN ALLEN
|
Pre-Inspection
|
8/28/2020
|
Not Ready for Inspection
|
ALBERT COMISARI
|
Pre-Inspection
|
9/14/2020
|
Approved
|
JONATHAN ALLEN
|
Pre-Inspection
|
9/15/2020
|
Conditional Approval
|
JONATHAN ALLEN
|
Pre-Inspection
|
9/16/2020
|
Approved
|
JONATHAN ALLEN
|
Green Building Rough
|
2/18/2021
|
Approved
|
JONATHAN ALLEN
|
Reinforced Concrete Frame
|
2/18/2021
|
Partial Approval
|
JONATHAN ALLEN
|
Verify Sprinkler Sign Off
|
2/18/2021
|
Approved
|
JONATHAN ALLEN
|
Reinforced Concrete Frame
|
2/25/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
Reinforced Concrete Frame
|
3/3/2021
|
Partial Approval
|
JONATHAN ALLEN
|
Reinforced Concrete Frame
|
3/9/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
Reinforced Concrete Frame
|
3/16/2021
|
Partial Inspection
|
JONATHAN ALLEN
|
Reinforced Concrete Frame
|
3/22/2021
|
Partial Approval
|
JONATHAN ALLEN
|
Reinforced Concrete Frame
|
3/30/2021
|
Partial Approval
|
JONATHAN ALLEN
|
Reinforced Concrete Frame
|
4/7/2021
|
Partial Approval
|
JONATHAN ALLEN
|
Reinforced Concrete Frame
|
4/13/2021
|
Partial Approval
|
JONATHAN ALLEN
|
Reinforced Concrete Frame
|
4/19/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
Reinforced Concrete Frame
|
4/23/2021
|
Partial Approval
|
ALAN NOVAK
|
Reinforced Concrete Frame
|
4/28/2021
|
Partial Approval
|
JONATHAN ALLEN
|
Reinforced Concrete Frame
|
5/7/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
Reinforced Concrete Frame
|
5/14/2021
|
Partial Approval
|
JONATHAN ALLEN
|
Reinforced Concrete Frame
|
5/24/2021
|
Partial Approval
|
JONATHAN ALLEN
|
Reinforced Concrete Frame
|
6/2/2021
|
Partial Approval
|
JONATHAN ALLEN
|
Reinforced Concrete Frame
|
6/8/2021
|
Partial Inspection
|
ALAN NOVAK
|
Reinforced Concrete Frame
|
6/11/2021
|
Partial Approval
|
ALAN NOVAK
|
Reinforced Concrete Frame
|
6/15/2021
|
Partial Approval
|
JONATHAN ALLEN
|
Reinforced Concrete Frame
|
6/23/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
Reinforced Concrete Frame
|
7/1/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
Reinforced Concrete Frame
|
7/7/2021
|
Partial Approval
|
JONATHAN ALLEN
|
Reinforced Concrete Frame
|
7/16/2021
|
Partial Approval
|
ALAN NOVAK
|
Reinforced Concrete Frame
|
7/21/2021
|
Partial Inspection
|
JONATHAN ALLEN
|
Reinforced Concrete Frame
|
8/3/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
Footing/Foundation/Slab
|
10/16/2021
|
Not Ready for Inspection
|
ALAN NOVAK
|
Footing/Foundation/Slab
|
10/17/2021
|
Partial Approval
|
JONATHAN ALLEN
|
Footing/Foundation/Slab
|
10/21/2021
|
Partial Approval
|
JONATHAN ALLEN
|
Footing/Foundation/Slab
|
10/27/2021
|
Partial Approval
|
JONATHAN ALLEN
|
Pre-Inspection
|
10/28/2021
|
Approved
|
ALAN NOVAK
|
Pre-Inspection
|
10/28/2021
|
Partial Approval
|
NICK LAROCCA
|
Excavation/Setback/Form/Re-Bar
|
11/2/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
Excavation/Setback/Form/Re-Bar
|
11/3/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
Excavation/Setback/Form/Re-Bar
|
11/4/2021
|
Partial Approval
|
JONATHAN ALLEN
|
Footing/Foundation/Slab
|
11/19/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
Pre-Inspection
|
11/22/2021
|
Partial Approval
|
JONATHAN ALLEN
|
Footing/Foundation/Slab
|
11/23/2021
|
Partial Approval
|
JONATHAN ALLEN
|
Footing/Foundation/Slab
|
12/10/2021
|
Partial Approval
|
JONATHAN ALLEN
|
Pre-Inspection
|
12/13/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
Pre-Inspection
|
12/14/2021
|
Partial Approval
|
JONATHAN ALLEN
|
Reinforced Concrete Frame
|
12/27/2021
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
Pre-Inspection
|
12/29/2021
|
Partial Approval
|
JONATHAN ALLEN
|
Footing/Foundation/Slab
|
1/6/2022
|
Partial Approval
|
ALAN NOVAK
|
Pre-Inspection
|
1/6/2022
|
Approved
|
ALAN NOVAK
|
Reinforced Concrete Frame
|
1/6/2022
|
Partial Approval
|
ALAN NOVAK
|
Pre-Inspection
|
1/10/2022
|
Approved
|
ALAN NOVAK
|
Footing/Foundation/Slab
|
1/21/2022
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
Drywall Nailing
|
1/24/2022
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
Final
|
1/24/2022
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
Green Building Final
|
1/24/2022
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
Pre-Inspection
|
1/24/2022
|
Approved
|
JONATHAN ALLEN
|
Reinforced Concrete Frame
|
1/24/2022
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
SGSOV-Seismic Gas S/O Valve
|
1/24/2022
|
SGSOV Not Ready
|
JONATHAN ALLEN
|
Smoke Detectors
|
1/24/2022
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
Structural Steel Frame
|
1/24/2022
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
Floor/Roof Diaphrgm/Shear Wall
|
1/25/2022
|
Not Ready for Inspection
|
JONATHAN ALLEN
|
Floor/Roof Diaphrgm/Shear Wall
|
1/26/2022
|
Partial Approval
|
JONATHAN ALLEN
|
Footing/Foundation/Slab
|
2/1/2022
|
Partial Approval
|
NICK LAROCCA
|
Pre-Inspection
|
2/2/2022
|
Approved
|
NICK LAROCCA
|
Reinforced Concrete Frame
|
2/2/2022
|
Partial Inspection
|
NICK LAROCCA
|
Reinforced Concrete Frame
|
2/3/2022
|
Not Ready for Inspection
|
NICK LAROCCA
|
Footing/Foundation/Slab
|
2/4/2022
|
Partial Approval
|
NICK LAROCCA
|
Reinforced Concrete Frame
|
2/7/2022
|
Not Ready for Inspection
|
NICK LAROCCA
|
Reinforced Concrete Frame
|
2/8/2022
|
Not Ready for Inspection
|
NICK LAROCCA
|
Reinforced Concrete Frame
|
2/11/2022
|
Partial Approval
|
ALAN NOVAK
|
Floor/Roof Diaphrgm/Shear Wall
|
2/28/2022
|
Partial Approval
|
NICK LAROCCA
|
Wall Anchors
|
3/11/2022
|
Approved
|
NICK LAROCCA
|
Floor/Roof Diaphrgm/Shear Wall
|
3/15/2022
|
Partial Inspection
|
NICK LAROCCA
|
Footing/Foundation/Slab
|
3/15/2022
|
Not Ready for Inspection
|
NICK LAROCCA
|
Light Gage Steel Frame
|
3/15/2022
|
Partial Approval
|
NICK LAROCCA
|
Drywall Nailing
|
3/23/2022
|
Partial Approval
|
NICK LAROCCA
|
Drywall Nailing
|
3/25/2022
|
Partial Approval
|
NICK LAROCCA
|
Footing/Foundation/Slab
|
3/25/2022
|
Partial Approval
|
NICK LAROCCA
|
Light Gage Steel Frame
|
3/25/2022
|
Partial Approval
|
NICK LAROCCA
|
Reinforced Concrete Frame
|
3/31/2022
|
Partial Approval
|
NICK LAROCCA
|
Light Gage Steel Frame
|
4/5/2022
|
Partial Approval
|
NICK LAROCCA
|
Reinforced Concrete Frame
|
4/6/2022
|
Partial Approval
|
NICK LAROCCA
|
Reinforced Concrete Frame
|
4/11/2022
|
Partial Approval
|
NICK LAROCCA
|
Drywall Nailing
|
4/13/2022
|
Partial Approval
|
NICK LAROCCA
|
Light Gage Steel Frame
|
4/13/2022
|
Partial Approval
|
NICK LAROCCA
|
Reinforced Concrete Frame
|
4/13/2022
|
Partial Approval
|
NICK LAROCCA
|
Light Gage Steel Frame
|
4/14/2022
|
Partial Approval
|
NICK LAROCCA
|
Reinforced Concrete Frame
|
4/21/2022
|
Partial Approval
|
NICK LAROCCA
|
Drywall Nailing
|
4/25/2022
|
Partial Approval
|
NICK LAROCCA
|
Reinforced Concrete Frame
|
4/28/2022
|
Partial Approval
|
NICK LAROCCA
|
Drywall Nailing
|
4/29/2022
|
Partial Approval
|
NICK LAROCCA
|
Reinforced Concrete Frame
|
5/6/2022
|
Partial Approval
|
ALAN NOVAK
|
Light Gage Steel Frame
|
5/9/2022
|
Partial Approval
|
NICK LAROCCA
|
Pre-Inspection
|
5/9/2022
|
Approved
|
NICK LAROCCA
|
Reinforced Concrete Frame
|
5/10/2022
|
Partial Approval
|
NICK LAROCCA
|
Light Gage Steel Frame
|
5/11/2022
|
Partial Approval
|
NICK LAROCCA
|
Drywall Nailing
|
5/12/2022
|
Partial Approval
|
NICK LAROCCA
|
Light Gage Steel Frame
|
5/12/2022
|
Partial Approval
|
NICK LAROCCA
|
Pre-Inspection
|
5/12/2022
|
Partial Approval
|
NICK LAROCCA
|
Reinforced Concrete Frame
|
5/17/2022
|
Not Ready for Inspection
|
NICK LAROCCA
|
Drywall Nailing
|
5/18/2022
|
Partial Approval
|
NICK LAROCCA
|
Floor/Roof Diaphrgm/Shear Wall
|
5/18/2022
|
Approved
|
NICK LAROCCA
|
Drywall Nailing
|
5/20/2022
|
Not Ready for Inspection
|
NICK LAROCCA
|
Light Gage Steel Frame
|
5/20/2022
|
Partial Approval
|
NICK LAROCCA
|
Drywall Nailing
|
5/25/2022
|
Partial Approval
|
NICK LAROCCA
|
Drywall Nailing
|
5/27/2022
|
Partial Inspection
|
NICK LAROCCA
|
Light Gage Steel Frame
|
5/27/2022
|
Partial Approval
|
NICK LAROCCA
|
Deputy Fireproofing
|
6/1/2022
|
Approved
|
NICK LAROCCA
|
Light Gage Steel Frame
|
6/1/2022
|
Partial Approval
|
NICK LAROCCA
|
Deputy Fireproofing
|
6/2/2022
|
Approved
|
NICK LAROCCA
|
Footing/Foundation/Slab
|
6/2/2022
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
6/2/2022
|
Approved
|
NICK LAROCCA
|
Deputy Fireproofing
|
6/3/2022
|
Approved
|
NICK LAROCCA
|
Deputy Fireproofing
|
6/6/2022
|
Approved
|
NICK LAROCCA
|
Drywall Nailing
|
6/6/2022
|
Partial Approval
|
NICK LAROCCA
|
Deputy Fireproofing
|
6/7/2022
|
Approved
|
NICK LAROCCA
|
Light Gage Steel Frame
|
6/7/2022
|
Partial Inspection
|
NICK LAROCCA
|
Pre-Inspection
|
6/7/2022
|
Approved
|
NICK LAROCCA
|
Deputy Fireproofing
|
6/8/2022
|
Approved
|
NICK LAROCCA
|
Deputy Fireproofing
|
6/9/2022
|
Approved
|
NICK LAROCCA
|
Deputy Fireproofing
|
6/10/2022
|
Approved
|
NICK LAROCCA
|
Drywall Nailing
|
6/13/2022
|
Conditional Approval
|
ALAN NOVAK
|
Light Gage Steel Frame
|
6/13/2022
|
Partial Approval
|
ALAN NOVAK
|
Drywall Nailing
|
6/15/2022
|
Partial Approval
|
ALAN NOVAK
|
Drywall Nailing
|
6/16/2022
|
Partial Approval
|
ALAN NOVAK
|
Floor/Roof Diaphrgm/Shear Wall
|
6/16/2022
|
Partial Approval
|
ALAN NOVAK
|
Light Gage Steel Frame
|
6/24/2022
|
Approved
|
NICK LAROCCA
|
Reinforced Concrete Frame
|
6/24/2022
|
Partial Approval
|
NICK LAROCCA
|
Floor/Roof Diaphrgm/Shear Wall
|
6/27/2022
|
Partial Approval
|
NICK LAROCCA
|
Drywall Nailing
|
6/30/2022
|
Partial Approval
|
NICK LAROCCA
|
Drywall Nailing
|
7/5/2022
|
Partial Approval
|
ALAN NOVAK
|
Light Gage Steel Frame
|
7/5/2022
|
Partial Approval
|
ALAN NOVAK
|
Pre-Inspection
|
7/5/2022
|
Approved
|
ALAN NOVAK
|
Deputy Fireproofing
|
7/6/2022
|
Approved
|
NICK LAROCCA
|
Deputy Fireproofing
|
7/7/2022
|
Approved
|
NICK LAROCCA
|
Drywall Nailing
|
7/7/2022
|
Approved
|
NICK LAROCCA
|
Light Gage Steel Frame
|
7/7/2022
|
Partial Approval
|
NICK LAROCCA
|
Deputy Fireproofing
|
7/8/2022
|
Approved
|
NICK LAROCCA
|
Deputy Drilled-In Anchors
|
7/11/2022
|
Approved
|
NICK LAROCCA
|
Deputy Fireproofing
|
7/11/2022
|
Approved
|
NICK LAROCCA
|
Deputy Drilled-In Anchors
|
7/12/2022
|
Approved
|
NICK LAROCCA
|
Deputy Fireproofing
|
7/12/2022
|
Approved
|
NICK LAROCCA
|
Deputy Drilled-In Anchors
|
7/13/2022
|
Approved
|
NICK LAROCCA
|
Deputy Fireproofing
|
7/13/2022
|
Approved
|
NICK LAROCCA
|
Deputy Drilled-In Anchors
|
7/14/2022
|
Approved
|
NICK LAROCCA
|
Deputy Fireproofing
|
7/14/2022
|
Approved
|
NICK LAROCCA
|
Deputy Steel/Welding
|
7/14/2022
|
Approved
|
NICK LAROCCA
|
Deputy Drilled-In Anchors
|
7/15/2022
|
Approved
|
NICK LAROCCA
|
Deputy Fireproofing
|
7/15/2022
|
Approved
|
NICK LAROCCA
|
Deputy Steel/Welding
|
7/15/2022
|
Approved
|
NICK LAROCCA
|
Light Gage Steel Frame
|
7/15/2022
|
Partial Approval
|
NICK LAROCCA
|
Deputy Drilled-In Anchors
|
7/18/2022
|
Approved
|
NICK LAROCCA
|
Deputy Steel/Welding
|
7/18/2022
|
Approved
|
NICK LAROCCA
|
Deputy Drilled-In Anchors
|
7/19/2022
|
Approved
|
NICK LAROCCA
|
Deputy Steel/Welding
|
7/19/2022
|
Approved
|
NICK LAROCCA
|
Light Gage Steel Frame
|
7/19/2022
|
Partial Approval
|
NICK LAROCCA
|
Pre-Inspection
|
7/19/2022
|
Partial Approval
|
NICK LAROCCA
|
Deputy Drilled-In Anchors
|
7/20/2022
|
Approved
|
NICK LAROCCA
|
Deputy Steel/Welding
|
7/20/2022
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
7/22/2022
|
Approved
|
NICK LAROCCA
|
Structural Steel Frame
|
7/26/2022
|
Partial Approval
|
NICK LAROCCA
|
Pre-Inspection
|
7/27/2022
|
Approved
|
NICK LAROCCA
|
Final
|
7/29/2022
|
Not Ready for Inspection
|
NICK LAROCCA
|
Green Building Final
|
7/29/2022
|
Approved
|
NICK LAROCCA
|
Reinforced Concrete Frame
|
7/29/2022
|
Approved
|
NICK LAROCCA
|
SGSOV-Seismic Gas S/O Valve
|
7/29/2022
|
SGSOV Approved
|
NICK LAROCCA
|
Smoke Detectors
|
7/29/2022
|
Approved
|
NICK LAROCCA
|
Structural Steel Frame
|
7/29/2022
|
Not Ready for Inspection
|
NICK LAROCCA
|
Light Gage Steel Frame
|
8/9/2022
|
Partial Approval
|
NICK LAROCCA
|
Pre-Inspection
|
8/25/2022
|
Not Ready for Inspection
|
NICK LAROCCA
|
Pre-Inspection
|
8/31/2022
|
Partial Approval
|
NICK LAROCCA
|
T-Bar Ceiling
|
9/1/2022
|
Not Ready for Inspection
|
NICK LAROCCA
|
Light Gage Steel Frame
|
9/2/2022
|
Partial Approval
|
NICK LAROCCA
|
Pre-Inspection
|
9/2/2022
|
Approved
|
NICK LAROCCA
|
Special/Order Compliance
|
9/2/2022
|
Not Ready for Inspection
|
NICK LAROCCA
|
Deputy Fireproofing
|
9/6/2022
|
Approved
|
NICK LAROCCA
|
Deputy Fireproofing
|
9/7/2022
|
Approved
|
NICK LAROCCA
|
Deputy Fireproofing
|
9/8/2022
|
Approved
|
NICK LAROCCA
|
Deputy Fireproofing
|
9/9/2022
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
9/9/2022
|
Partial Approval
|
NICK LAROCCA
|
T-Bar Ceiling
|
9/9/2022
|
Partial Approval
|
NICK LAROCCA
|
Wall Anchors
|
9/9/2022
|
Approved
|
NICK LAROCCA
|
Deputy Fireproofing
|
9/12/2022
|
Approved
|
NICK LAROCCA
|
Light Gage Steel Frame
|
9/20/2022
|
Partial Approval
|
NICK LAROCCA
|
Pre-Inspection
|
9/21/2022
|
Approved
|
NICK LAROCCA
|
T-Bar Ceiling
|
9/21/2022
|
Partial Inspection
|
NICK LAROCCA
|
Pre-Inspection
|
9/26/2022
|
Approved
|
NICK LAROCCA
|
T-Bar Ceiling
|
9/27/2022
|
Not Ready for Inspection
|
NICK LAROCCA
|
T-Bar Ceiling
|
9/28/2022
|
Partial Approval
|
NICK LAROCCA
|
Light Gage Steel Frame
|
10/5/2022
|
Approved
|
NICK LAROCCA
|
Light Gage Steel Frame
|
10/6/2022
|
Partial Approval
|
ALAN NOVAK
|
Green Building Rough
|
10/7/2022
|
Approved
|
ALAN NOVAK
|
Structural Steel Frame
|
10/7/2022
|
Partial Approval
|
ALAN NOVAK
|
T-Bar Ceiling
|
10/7/2022
|
Partial Approval
|
ALAN NOVAK
|
Light Gage Steel Frame
|
10/12/2022
|
Partial Approval
|
ALAN NOVAK
|
Light Gage Steel Frame
|
10/18/2022
|
Partial Approval
|
ALAN NOVAK
|
Drywall Nailing
|
10/20/2022
|
Partial Approval
|
ALAN NOVAK
|
Footing/Foundation/Slab
|
10/20/2022
|
Approved
|
ALAN NOVAK
|
T-Bar Ceiling
|
10/24/2022
|
Partial Approval
|
ALAN NOVAK
|
Drywall Nailing
|
10/31/2022
|
Approved
|
NICK LAROCCA
|
Final
|
11/18/2022
|
Not Ready for Inspection
|
NICK LAROCCA
|
Structural Steel Frame
|
11/18/2022
|
Not Ready for Inspection
|
NICK LAROCCA
|
T-Bar Ceiling
|
11/18/2022
|
Not Ready for Inspection
|
NICK LAROCCA
|
T-Bar Ceiling
|
11/21/2022
|
Partial Approval
|
NICK LAROCCA
|
T-Bar Ceiling
|
12/8/2022
|
Not Ready for Inspection
|
NICK LAROCCA
|
T-Bar Ceiling
|
12/14/2022
|
Partial Approval
|
NICK LAROCCA
|
Footing/Foundation/Slab
|
12/21/2022
|
Partial Approval
|
ALAN NOVAK
|
Light Gage Steel Frame
|
12/30/2022
|
Not Ready for Inspection
|
NICK LAROCCA
|
Light Gage Steel Frame
|
1/4/2023
|
Approved
|
NICK LAROCCA
|
Reinforced Masonry Frame
|
1/5/2023
|
Partial Inspection
|
NICK LAROCCA
|
Pre-Inspection
|
1/11/2023
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
1/12/2023
|
Not Ready for Inspection
|
NICK LAROCCA
|
Pre-Inspection
|
1/13/2023
|
Partial Approval
|
NICK LAROCCA
|
Light Gage Steel Frame
|
1/19/2023
|
Partial Approval
|
NICK LAROCCA
|
T-Bar Ceiling
|
1/19/2023
|
Partial Approval
|
NICK LAROCCA
|
Pre-Inspection
|
1/26/2023
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
1/27/2023
|
Approved
|
NICK LAROCCA
|
Light Gage Steel Frame
|
2/1/2023
|
Not Ready for Inspection
|
NICK LAROCCA
|
Deputy Fireproofing
|
2/6/2023
|
Approved
|
NICK LAROCCA
|
Deputy Fireproofing
|
2/7/2023
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
2/7/2023
|
Not Ready for Inspection
|
NICK LAROCCA
|
Deputy Fireproofing
|
2/8/2023
|
Approved
|
NICK LAROCCA
|
Deputy Fireproofing
|
2/9/2023
|
Approved
|
NICK LAROCCA
|
Light Gage Steel Frame
|
2/9/2023
|
Partial Inspection
|
NICK LAROCCA
|
Pre-Inspection
|
2/9/2023
|
Approved
|
NICK LAROCCA
|
Deputy Fireproofing
|
2/10/2023
|
Approved
|
NICK LAROCCA
|
Deputy Fireproofing
|
2/13/2023
|
Approved
|
NICK LAROCCA
|
Deputy Fireproofing
|
2/14/2023
|
Approved
|
NICK LAROCCA
|
Special/Order Compliance
|
2/14/2023
|
Partial Approval
|
NICK LAROCCA
|
Deputy Fireproofing
|
2/15/2023
|
Approved
|
NICK LAROCCA
|
Special/Order Compliance
|
2/15/2023
|
Partial Approval
|
NICK LAROCCA
|
Deputy Fireproofing
|
2/16/2023
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
2/16/2023
|
Approved
|
NICK LAROCCA
|
Deputy Fireproofing
|
2/17/2023
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
2/17/2023
|
Partial Inspection
|
NICK LAROCCA
|
Pre-Inspection
|
2/23/2023
|
Approved
|
ALAN NOVAK
|
T-Bar Ceiling
|
2/23/2023
|
Not Ready for Inspection
|
ALAN NOVAK
|
T-Bar Ceiling
|
3/1/2023
|
Not Ready for Inspection
|
NICK LAROCCA
|
Special/Order Compliance
|
3/2/2023
|
Partial Approval
|
NICK LAROCCA
|
T-Bar Ceiling
|
3/3/2023
|
Partial Approval
|
NICK LAROCCA
|
Light Gage Steel Frame
|
3/14/2023
|
Approved
|
NICK LAROCCA
|
T-Bar Ceiling
|
3/15/2023
|
Not Ready for Inspection
|
NICK LAROCCA
|
T-Bar Ceiling
|
3/16/2023
|
Approved
|
NICK LAROCCA
|
T-Bar Ceiling
|
3/31/2023
|
Approved
|
NICK LAROCCA
|
Excavation/Setback/Form/Re-Bar
|
4/5/2023
|
Partial Approval
|
NICK LAROCCA
|
Pre-Inspection
|
4/13/2023
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
4/14/2023
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
4/18/2023
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
5/4/2023
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
5/10/2023
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
5/23/2023
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
5/24/2023
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
9/12/2023
|
Not Ready for Inspection
|
NICK LAROCCA
|
Pre-Inspection
|
9/22/2023
|
Partial Approval
|
NICK LAROCCA
|
Footing/Foundation/Slab
|
12/12/2023
|
Approved
|
NICK LAROCCA
|
Final
|
12/13/2023
|
Not Ready for Inspection
|
NICK LAROCCA
|
Structural Steel Frame
|
12/13/2023
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
1/19/2024
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
1/29/2024
|
Approved
|
NICK LAROCCA
|
Final
|
2/23/2024
|
Partial Approval
|
NICK LAROCCA
|
Pre-Inspection
|
4/19/2024
|
Partial Approval
|
NICK LAROCCA
|
Deputy Fireproofing
|
5/6/2024
|
Approved
|
NICK LAROCCA
|
Deputy Fireproofing
|
5/7/2024
|
Approved
|
NICK LAROCCA
|
Deputy Fireproofing
|
5/8/2024
|
Approved
|
NICK LAROCCA
|
Deputy Fireproofing
|
5/9/2024
|
Approved
|
NICK LAROCCA
|
Deputy Fireproofing
|
5/10/2024
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
10/9/2024
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
10/10/2024
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
11/22/2024
|
Partial Approval
|
NICK LAROCCA
|
Special/Order Compliance
|
3/20/2025
|
Approved
|
ALAN NOVAK
|
Pre-Inspection
|
3/21/2025
|
Approved
|
ALAN NOVAK
|