5020 N WOODMAN AVE 91423

Certificate Information: 5020 N WOODMAN AVE 91423

Application / Permit
18010-20000-05384
Plan Check / Job No.
B18VN19109
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
(N) 51-UNIT 4-STORY TYPE V-A APARTMENT OVER TYPE I-A SUBTERRANEAN PARKING GARAGE (NFPA-13 FIRE SPRINKLERS THROUGHOUT)
Permit Issued
Issued on 1/13/2020
Issuing Office
Valley
Current Status
CofO Issued on 6/27/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 11/5/2018 APPLICANT
Assigned to Plan Check Engineer 12/6/2018 NILOOFAR MEHRAIN
Disabled Access Plans Picked Up 12/21/2018 APPLICANT
Green Plans Picked Up 12/21/2018 APPLICANT
Corrections Issued 1/10/2019 NILOOFAR MEHRAIN
Quality Review Completed 1/17/2019 CHON CHIO KUO
Building Plans Picked Up 3/1/2019 APPLICANT
Applicant returned to address corrections 9/9/2019 NILOOFAR MEHRAIN
Applicant returned to address corrections 9/23/2019 NILOOFAR MEHRAIN
Applicant returned to address corrections 9/24/2019 NILOOFAR MEHRAIN
Applicant returned to address corrections 10/3/2019 NILOOFAR MEHRAIN
Applicant returned to address corrections 10/21/2019 NILOOFAR MEHRAIN
Applicant returned to address corrections 10/31/2019 NILOOFAR MEHRAIN
Plan Check Approved 12/11/2019 NILOOFAR MEHRAIN
Issued 1/13/2020 LADBS
TCO Issued (Expire Date: 04-20-2024) 10/23/2023 JEFFREY DURAN
CofO in Progress 6/11/2024 JOHN KITCKO
Permit Finaled 6/27/2024 RICKEY JACKSON
CofO Issued 6/27/2024 RICKEY JACKSON
Permit Finaled 6/27/2024 RICKEY JACKSON

Permit Application Clearance Information

Address approval Cleared 6/11/2019 ERIK BEASLEY
Hydrant and Access approval Cleared 6/11/2019 GILBERT URREA
Encroachment in public way Cleared 7/10/2019 LEE GUILBEAUX
Eng Process Fee Ord 176,300 Cleared 7/10/2019 LEE GUILBEAUX
Trees in Parkway Cleared 7/12/2019 HECTOR BANUELOS
Highway dedication Cleared 8/20/2019 JOHN LIN
Permit Cleared 8/20/2019 JOHN LIN
Frnt yard landscape/Water mgmt Cleared 9/9/2019 RINA LARA
Opn space landscape/Water mgmt Cleared 9/9/2019 RINA LARA
Site Plan review Cleared 9/9/2019 RINA LARA
ZI Cleared 9/9/2019 RINA LARA
Green Code Cleared 9/19/2019 MICHAEL AYERS
Sewer availability Cleared 9/24/2019 ADRIAN CASTRO
DAS Clearance Cleared 10/2/2019 NORLITO MEDRANO
Building over 3-story or 36-ft Cleared 10/3/2019 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 10/3/2019 CALOSHA APPROVED
Work Adjacent to Public Way Cleared 10/3/2019 SAFA JAVANMARDI
Construction near power lines Cleared 10/18/2019 RIDWAN HARDY
Construction within easement Cleared 10/18/2019 RIDWAN HARDY
Fire Marshall Fire Life Safety Cleared 10/23/2019 WILLIAM JOHNS
Low Impact Development Cleared 10/23/2019 MITESH PATEL
Stormwater Pollution Mitigatn Cleared 10/23/2019 MITESH PATEL
Roof/Waste drainage to street Cleared 12/11/2019 ADRIAN CASTRO

Contact Information

Architect Bardovi,, Gary David; Lic. No.: C13793 4766 PARK GRANADA SUITE 112      CALABASAS, CA 91302
Contractor B V C Development Corp; Lic. No.: 739999-B 1522 W 130TH STREET      GARDENA, CA 90249
Engineer Arca,, Perfecto Alquiza; Lic. No.: C28918 23222 ROSANNA COURT      TORRANCE, CA 90502
Engineer Hill,, Edward Foster; Lic. No.: GE2126 27865 AMBERWOOD LANE      VALENCIA, CA 91354
Engineer Naraghi-Arani,, Kamran; Lic. No.: C40985 30423 CANWOOD ST STE 223      AGOURA HILLS, CA 91301
Engineer Walter,, Scott John; Lic. No.: GE2476 14428 HAMLIN ST STE 200      VAN NUYS, CA 91401

Inspector Information

JOHN KITCKO, (818) 374-1182 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 1/23/2020 Approved JOHN KITCKO
Pre-Inspection 1/29/2020 Partial Inspection JOHN KITCKO
Footing/Foundation/Slab 2/24/2020 Partial Inspection JOHN KITCKO
Footing/Foundation/Slab 3/6/2020 Partial Approval CAMERON CHABAN
SUSMP-Std. Urban Storm Water 1/7/2021 Not Ready for Inspection JOHN KITCKO
Excavation/Setback/Form/Re-Bar 1/14/2021 Partial Inspection JOHN KITCKO
Excavation/Setback/Form/Re-Bar 1/15/2021 Partial Approval JOHN KITCKO
Footing/Foundation/Slab 2/9/2021 Corrections Issued JOHN KITCKO
Excavation/Setback/Form/Re-Bar 2/11/2021 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 2/17/2021 Approved JOHN KITCKO
Deputy Reinf. Masonry 2/17/2021 Approved JOHN KITCKO
Deputy Shotcrete 2/17/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 2/18/2021 Approved JOHN KITCKO
Deputy Reinf. Masonry 2/18/2021 Approved JOHN KITCKO
Deputy Shotcrete 2/18/2021 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 2/18/2021 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 2/19/2021 Approved JOHN KITCKO
Deputy Reinf. Masonry 2/19/2021 Approved JOHN KITCKO
Deputy Shotcrete 2/19/2021 Approved JOHN KITCKO
Deputy Reinf. Masonry 2/22/2021 Approved JOHN KITCKO
Deputy Shotcrete 2/22/2021 Approved JOHN KITCKO
Deputy Reinf. Masonry 2/23/2021 Approved JOHN KITCKO
Deputy Shotcrete 2/23/2021 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 2/23/2021 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 2/24/2021 Approved JOHN KITCKO
Deputy Shotcrete 2/24/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 2/25/2021 Approved JOHN KITCKO
Deputy Reinf. Masonry 2/25/2021 Approved JOHN KITCKO
Deputy Shotcrete 2/25/2021 Approved JOHN KITCKO
Deputy Reinf. Concrete 2/26/2021 Approved JOHN KITCKO
Deputy Reinf. Masonry 2/26/2021 Approved JOHN KITCKO
Deputy Shotcrete 2/26/2021 Approved JOHN KITCKO
Deputy Reinf. Masonry 3/1/2021 Approved JOHN KITCKO
Deputy Reinf. Masonry 3/2/2021 Approved JOHN KITCKO
Deputy Reinf. Masonry 3/3/2021 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 3/3/2021 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 3/4/2021 Approved JOHN KITCKO
Deputy Reinf. Masonry 3/5/2021 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 3/30/2021 Partial Inspection JOHN KITCKO
Excavation/Setback/Form/Re-Bar 4/15/2021 Partial Approval JOHN KITCKO
Deputy Reinf. Masonry 4/22/2021 Approved HAMID PISHEHVAR
Deputy Reinf. Masonry 4/23/2021 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 4/23/2021 Partial Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 5/3/2021 Partial Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 5/27/2021 Not Ready for Inspection JOHN KITCKO
Green Building Rough 5/27/2021 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 5/27/2021 Not Ready for Inspection JOHN KITCKO
Wood Frame 5/27/2021 Not Ready for Inspection JOHN KITCKO
Excavation/Setback/Form/Re-Bar 6/2/2021 Partial Approval JOHN KITCKO
Green Building Rough 6/8/2021 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 6/8/2021 Approved JOHN KITCKO
Wood Frame 6/8/2021 Not Ready for Inspection JOHN KITCKO
Pre-Inspection 6/9/2021 Partial Approval JOHN KITCKO
Deputy Steel/Welding 6/21/2021 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 6/24/2021 No Access for Inspection JOHN KITCKO
Green Building Rough 6/24/2021 Not Ready for Inspection JOHN KITCKO
Masonry Wall/Backfill 6/24/2021 No Access for Inspection JOHN KITCKO
Wood Frame 6/24/2021 No Access for Inspection JOHN KITCKO
Excavation/Setback/Form/Re-Bar 6/25/2021 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 6/25/2021 Conditional Approval ROBERT DAVIS
Masonry Wall/Backfill 6/25/2021 Partial Approval ROBERT DAVIS
Deputy Steel/Welding 6/30/2021 Approved JOHN KITCKO
Deputy Steel/Welding 7/1/2021 Approved JOHN KITCKO
Deputy Steel/Welding 7/2/2021 Approved JOHN KITCKO
Deputy Steel/Welding 7/6/2021 Approved JOHN KITCKO
Deputy Steel/Welding 7/20/2021 Conditional Approval DANIEL VARNUM
Excavation/Setback/Form/Re-Bar 7/20/2021 Partial Approval CAMERON CHABAN
Deputy Steel/Welding 7/23/2021 Approved JOHN KITCKO
Green Building Rough 7/26/2021 Not Ready for Inspection JOHN KITCKO
Wood Frame 7/26/2021 Partial Approval JOHN KITCKO
Green Building Rough 8/10/2021 Not Ready for Inspection JOHN KITCKO
Wood Frame 8/10/2021 Partial Approval JOHN KITCKO
Deputy Wood Construction 8/12/2021 Conditional Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 8/18/2021 Partial Approval JOHN KITCKO
Green Building Rough 8/18/2021 Not Ready for Inspection JOHN KITCKO
Wood Frame 8/18/2021 Partial Inspection JOHN KITCKO
Deputy Steel/Welding 9/10/2021 Approved JOHN KITCKO
Green Building Rough 9/10/2021 Not Ready for Inspection JOHN KITCKO
Wood Frame 9/10/2021 Not Ready for Inspection JOHN KITCKO
Deputy Steel/Welding 9/13/2021 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 9/13/2021 Partial Approval JOHN KITCKO
Green Building Rough 9/30/2021 Not Ready for Inspection JOHN KITCKO
Wood Frame 9/30/2021 Not Ready for Inspection JOHN KITCKO
Excavation/Setback/Form/Re-Bar 10/1/2021 Partial Approval JOHN KITCKO
Deputy Wood Construction 10/7/2021 Conditional Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 10/22/2021 Not Ready for Inspection SORIN CIRSTOIU
Floor/Roof Diaphrgm/Shear Wall 10/28/2021 Partial Approval JOHN KITCKO
Deputy Wood Construction 11/23/2021 Approved JOHN KITCKO
Insulation 12/1/2021 Partial Inspection JOHN KITCKO
Green Building Rough 12/2/2021 Not Ready for Inspection JOHN KITCKO
Wood Frame 12/2/2021 Partial Inspection JOHN KITCKO
Pre-Inspection 12/3/2021 Not Ready for Inspection JOHN KITCKO
Deputy Wood Construction 12/15/2021 Conditional Approval JOHN KITCKO
Deputy Wood Construction 1/4/2022 Approved JOHN KITCKO
Green Building Rough 1/5/2022 Not Ready for Inspection JOHN KITCKO
Wood Frame 1/5/2022 Partial Inspection JOHN KITCKO
Deputy Wood Construction 1/10/2022 Approved JOHN KITCKO
Deputy Wood Construction 1/12/2022 Approved JOHN KITCKO
Green Building Rough 1/13/2022 Not Ready for Inspection JOHN KITCKO
Wood Frame 1/13/2022 Partial Approval JOHN KITCKO
Insulation 1/14/2022 Partial Approval JOHN KITCKO
Insulation 2/1/2022 Not Ready for Inspection JOHN KITCKO
Deputy Wood Construction 2/9/2022 Approved JOHN KITCKO
Deputy Wood Construction 2/16/2022 Conditional Approval JOHN KITCKO
Green Building Rough 2/16/2022 Not Ready for Inspection JOHN KITCKO
Deputy Wood Construction 2/17/2022 Approved JOHN KITCKO
Wood Frame 2/17/2022 Not Ready for Inspection JOHN KITCKO
Deputy Wood Construction 2/18/2022 Conditional Approval JOHN KITCKO
Deputy Wood Construction 2/22/2022 Conditional Approval ANDREW DORSO
Deputy Wood Construction 2/22/2022 Conditional Approval CAMERON CHABAN
Deputy Wood Construction 2/23/2022 Conditional Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 2/23/2022 Not Ready for Inspection CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 2/23/2022 Partial Approval CAMERON CHABAN
Green Building Rough 2/23/2022 Partial Inspection CAMERON CHABAN
Masonry Wall/Backfill 2/23/2022 Not Ready for Inspection CAMERON CHABAN
Deputy Wood Construction 2/24/2022 Conditional Approval JOHN KITCKO
Wood Frame 2/25/2022 Not Ready for Inspection JOHN KITCKO
Insulation 3/1/2022 Partial Approval JOHN KITCKO
Deputy Wood Construction 3/7/2022 Approved JOHN KITCKO
Green Building Rough 3/8/2022 Partial Approval JOHN KITCKO
Wood Frame 3/8/2022 Partial Approval JOHN KITCKO
Green Building Rough 3/10/2022 Not Ready for Inspection ANDREW DORSO
Wood Frame 3/10/2022 Partial Inspection ANDREW DORSO
Green Building Rough 3/15/2022 Partial Approval JOHN KITCKO
Wood Frame 3/15/2022 Partial Approval JOHN KITCKO
Insulation 3/16/2022 Partial Approval JOHN KITCKO
Green Building Rough 3/18/2022 Partial Inspection CAMERON CHABAN
Wood Frame 3/18/2022 Partial Approval CAMERON CHABAN
Deputy Wood Construction 3/22/2022 Approved JOHN KITCKO
Insulation 3/29/2022 Partial Approval DANIEL VARNUM
Interior/Exterior Lathing 3/29/2022 Not Ready for Inspection DANIEL VARNUM
Green Building Rough 3/30/2022 Partial Approval JOHN KITCKO
Wood Frame 3/30/2022 Partial Approval JOHN KITCKO
Deputy Wood Construction 3/31/2022 Approved JOHN KITCKO
Insulation 3/31/2022 Not Ready for Inspection JOHN KITCKO
Interior/Exterior Lathing 3/31/2022 Partial Approval JOHN KITCKO
Drywall Nailing 4/4/2022 Partial Approval JOHN KITCKO
Green Building Rough 4/4/2022 Not Ready for Inspection JOHN KITCKO
Wood Frame 4/4/2022 Partial Approval JOHN KITCKO
Insulation 4/6/2022 Partial Inspection JOHN KITCKO
Interior/Exterior Lathing 4/14/2022 Partial Approval JOHN KITCKO
Masonry Wall/Backfill 4/15/2022 Not Ready for Inspection JOHN KITCKO
Green Building Rough 4/18/2022 Not Ready for Inspection JOHN KITCKO
Wood Frame 4/18/2022 Partial Approval JOHN KITCKO
Masonry Wall/Backfill 4/19/2022 Partial Approval JOHN KITCKO
Deputy Wood Construction 4/25/2022 Conditional Approval JOHN KITCKO
Insulation 4/25/2022 Partial Approval JOHN KITCKO
Green Building Rough 4/26/2022 Not Ready for Inspection JOHN KITCKO
Wood Frame 4/26/2022 Partial Approval JOHN KITCKO
Insulation 4/27/2022 Partial Approval JOHN KITCKO
Insulation 4/28/2022 Partial Approval JOHN KITCKO
Masonry Wall/Backfill 4/29/2022 Not Ready for Inspection JOHN KITCKO
Insulation 5/3/2022 Partial Approval JOHN KITCKO
Green Building Rough 5/4/2022 Not Ready for Inspection JOHN KITCKO
Wood Frame 5/4/2022 Partial Approval JOHN KITCKO
Insulation 5/5/2022 No Access for Inspection JOHN KITCKO
Drywall Nailing 5/6/2022 Not Ready for Inspection JOHN KITCKO
Insulation 5/6/2022 Not Ready for Inspection JOHN KITCKO
Deputy Wood Construction 5/10/2022 Approved JOHN KITCKO
Green Building Rough 5/10/2022 Not Ready for Inspection JOHN KITCKO
Wood Frame 5/10/2022 Not Ready for Inspection JOHN KITCKO
Green Building Rough 5/13/2022 Not Ready for Inspection JOHN KITCKO
Wood Frame 5/13/2022 Partial Approval JOHN KITCKO
Insulation 5/16/2022 Partial Approval JOHN KITCKO
Green Building Rough 5/17/2022 Not Ready for Inspection JOHN KITCKO
Wood Frame 5/17/2022 Not Ready for Inspection JOHN KITCKO
Insulation 5/18/2022 Not Ready for Inspection JOHN KITCKO
Insulation 5/19/2022 Partial Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 6/2/2022 Partial Inspection CAMERON CHABAN
Green Building Rough 6/2/2022 Partial Inspection CAMERON CHABAN
Wood Frame 6/2/2022 Partial Approval CAMERON CHABAN
Masonry Wall/Backfill 6/3/2022 Partial Inspection CAMERON CHABAN
Wood Frame 6/8/2022 Partial Approval JOHN KITCKO
Insulation 6/14/2022 Not Ready for Inspection JOHN KITCKO
Insulation 6/15/2022 Partial Approval JOHN KITCKO
Insulation 6/16/2022 Partial Approval JOHN KITCKO
Insulation 6/17/2022 Partial Inspection JOHN KITCKO
Drywall Nailing 6/22/2022 Not Ready for Inspection JOHN KITCKO
Green Building Rough 6/22/2022 Partial Approval JOHN KITCKO
Insulation 6/22/2022 Partial Approval JOHN KITCKO
Wood Frame 6/22/2022 Partial Approval JOHN KITCKO
Wood Frame 6/23/2022 Conditional Approval JOHN KITCKO
Drywall Nailing 6/27/2022 Not Ready for Inspection JOHN KITCKO
Green Building Rough 6/27/2022 Approved JOHN KITCKO
Wood Frame 6/27/2022 Partial Approval JOHN KITCKO
Insulation 6/28/2022 Partial Approval JOHN KITCKO
Drywall Nailing 6/29/2022 Not Ready for Inspection JOHN KITCKO
Insulation 6/29/2022 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 6/30/2022 Not Ready for Inspection JOHN KITCKO
Insulation 6/30/2022 Partial Approval JOHN KITCKO
Drywall Nailing 7/1/2022 Not Ready for Inspection JOHN KITCKO
Insulation 7/1/2022 Not Ready for Inspection JOHN KITCKO
Interior/Exterior Lathing 7/6/2022 Not Ready for Inspection JOHN KITCKO
Interior/Exterior Lathing 7/14/2022 Partial Approval JOHN KITCKO
Drywall Nailing 7/18/2022 Partial Approval JOHN KITCKO
Wood Frame 7/18/2022 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 7/20/2022 Partial Approval JOHN KITCKO
Drywall Nailing 7/21/2022 Not Ready for Inspection JOHN KITCKO
Insulation 7/21/2022 Not Ready for Inspection JOHN KITCKO
Insulation 7/25/2022 Not Ready for Inspection JOHN KITCKO
Masonry Wall/Backfill 7/25/2022 Not Ready for Inspection JOHN KITCKO
Wood Frame 7/25/2022 Not Ready for Inspection JOHN KITCKO
Insulation 7/28/2022 Partial Approval JOHN KITCKO
Wood Frame 7/28/2022 Partial Approval JOHN KITCKO
Drywall Nailing 7/29/2022 Partial Approval JOHN KITCKO
Interior/Exterior Lathing 8/2/2022 Partial Approval JOHN KITCKO
Wood Frame 8/2/2022 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 8/4/2022 Partial Approval DANIEL VARNUM
Masonry Wall/Backfill 8/4/2022 Partial Approval DANIEL VARNUM
Insulation 8/5/2022 Not Ready for Inspection JOHN KITCKO
Wood Frame 8/5/2022 Partial Approval JOHN KITCKO
Drywall Nailing 8/10/2022 Partial Approval ROBERT DAVIS
Insulation 8/10/2022 Partial Approval ROBERT DAVIS
Insulation 8/12/2022 Partial Approval JOHN KITCKO
Drywall Nailing 8/19/2022 No Access for Inspection JOHN KITCKO
Drywall Nailing 8/23/2022 Partial Approval JOHN KITCKO
Insulation 8/30/2022 Partial Approval JOHN KITCKO
Drywall Nailing 8/31/2022 Partial Approval ROBERT DAVIS
Insulation 12/6/2022 Conditional Approval CAMERON CHABAN
Drywall Nailing 12/22/2022 Partial Approval JOHN KITCKO
Drywall Nailing 12/28/2022 Partial Approval JOHN KITCKO
Final 3/13/2023 Partial Inspection JOHN KITCKO
Footing/Foundation/Slab 3/13/2023 Approved JOHN KITCKO
Green Building Final 3/13/2023 Not Ready for Inspection JOHN KITCKO
Reinforced Concrete Frame 3/13/2023 Approved JOHN KITCKO
SGSOV-Seismic Gas S/O Valve 3/13/2023 SGSOV Not Ready JOHN KITCKO
SUSMP-Std. Urban Storm Water 3/13/2023 Not Ready for Inspection JOHN KITCKO
Smoke Detectors 3/13/2023 Not Ready for Inspection JOHN KITCKO
Structural Steel Frame 3/13/2023 Approved JOHN KITCKO
Wood Frame 3/13/2023 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 4/26/2023 Partial Approval JOHN KITCKO
Final 8/24/2023 Partial Inspection JOHN KITCKO
Green Building Final 8/24/2023 Not Ready for Inspection JOHN KITCKO
SGSOV-Seismic Gas S/O Valve 8/24/2023 SGSOV Approved JOHN KITCKO
SUSMP-Std. Urban Storm Water 8/24/2023 Not Ready for Inspection JOHN KITCKO
Smoke Detectors 8/24/2023 Approved JOHN KITCKO
Final 8/29/2023 Partial Inspection JOHN KITCKO
Green Building Final 8/29/2023 Not Ready for Inspection JOHN KITCKO
SUSMP-Std. Urban Storm Water 8/29/2023 Approved JOHN KITCKO
Final 9/13/2023 Partial Inspection JOHN KITCKO
Green Building Final 9/13/2023 Not Ready for Inspection JOHN KITCKO
Final 10/2/2023 Not Ready for Inspection JOHN KITCKO
Green Building Final 10/2/2023 Approved JOHN KITCKO
Final 10/12/2023 Not Ready for Inspection JOHN KITCKO
Final 10/23/2023 OK for TCO JOHN KITCKO
Final 3/6/2024 Not Ready for Inspection JOHN KITCKO
Special/Order Compliance 3/27/2024 Partial Inspection JOHN KITCKO
Final 6/11/2024 OK to Issue CofO JOHN KITCKO