Special/Order Compliance
|
9/8/2021
|
Approved
|
NICK LAROCCA
|
Excavation/Setback/Form/Re-Bar
|
10/22/2021
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Excavation/Setback/Form/Re-Bar
|
11/4/2021
|
Partial Approval
|
JOEY BUCHANAN
|
Footing/Foundation/Slab
|
11/4/2021
|
Order to Comply Issued
|
JOEY BUCHANAN
|
Footing/Foundation/Slab
|
11/10/2021
|
Conditional Approval
|
JOEY BUCHANAN
|
Excavation/Setback/Form/Re-Bar
|
11/23/2021
|
Partial Approval
|
JOEY BUCHANAN
|
Footing/Foundation/Slab
|
11/23/2021
|
Partial Approval
|
JOEY BUCHANAN
|
Structural Steel Frame
|
12/1/2021
|
Partial Approval
|
JOEY BUCHANAN
|
Excavation/Setback/Form/Re-Bar
|
12/2/2021
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Green Building Rough
|
12/2/2021
|
Approved
|
JOEY BUCHANAN
|
Reinforced Concrete Frame
|
12/2/2021
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Verify Sprinkler Sign Off
|
12/2/2021
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Excavation/Setback/Form/Re-Bar
|
12/7/2021
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Piling/Pier/Caisson
|
12/8/2021
|
Partial Approval
|
JOEY BUCHANAN
|
Masonry Wall/Backfill
|
12/13/2021
|
Partial Approval
|
JOEY BUCHANAN
|
Reinforced Concrete Frame
|
12/13/2021
|
Partial Approval
|
JOEY BUCHANAN
|
Verify Sprinkler Sign Off
|
12/13/2021
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Footing/Foundation/Slab
|
12/20/2021
|
Partial Approval
|
JOEY BUCHANAN
|
Piling/Pier/Caisson
|
12/22/2021
|
Partial Approval
|
JOEY BUCHANAN
|
Reinforced Concrete Frame
|
12/22/2021
|
Partial Approval
|
JOEY BUCHANAN
|
Verify Sprinkler Sign Off
|
12/22/2021
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Masonry Wall/Backfill
|
1/7/2022
|
Partial Approval
|
NICK LAROCCA
|
Footing/Foundation/Slab
|
1/18/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Footing/Foundation/Slab
|
1/27/2022
|
Partial Approval
|
JOEY BUCHANAN
|
Masonry Wall/Backfill
|
2/4/2022
|
Partial Approval
|
JOEY BUCHANAN
|
Masonry Wall/Backfill
|
2/7/2022
|
Partial Approval
|
JOEY BUCHANAN
|
Footing/Foundation/Slab
|
2/8/2022
|
Not Ready for Inspection
|
DAVID TSAU
|
Footing/Foundation/Slab
|
2/8/2022
|
Partial Approval
|
JOEY BUCHANAN
|
Excavation/Setback/Form/Re-Bar
|
2/10/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Masonry Wall/Backfill
|
2/16/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Masonry Wall/Backfill
|
2/17/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Masonry Wall/Backfill
|
2/22/2022
|
Partial Approval
|
JOEY BUCHANAN
|
Footing/Foundation/Slab
|
3/4/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Floor/Roof Diaphrgm/Shear Wall
|
3/8/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Floor/Roof Diaphrgm/Shear Wall
|
3/14/2022
|
Partial Approval
|
JOEY BUCHANAN
|
Reinforced Concrete Frame
|
3/22/2022
|
Partial Approval
|
JOEY BUCHANAN
|
Verify Sprinkler Sign Off
|
3/22/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Reinforced Concrete Frame
|
3/30/2022
|
Partial Approval
|
JOEY BUCHANAN
|
Verify Sprinkler Sign Off
|
3/30/2022
|
Approved
|
JOEY BUCHANAN
|
Masonry Wall/Backfill
|
4/6/2022
|
Partial Approval
|
JOEY BUCHANAN
|
Masonry Wall/Backfill
|
4/7/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Masonry Wall/Backfill
|
4/13/2022
|
Partial Approval
|
JOEY BUCHANAN
|
Special/Order Compliance
|
5/9/2022
|
Approved
|
JOEY BUCHANAN
|
Reinforced Concrete Frame
|
5/10/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Reinforced Concrete Frame
|
5/17/2022
|
Partial Approval
|
JOEY BUCHANAN
|
Structural Steel Frame
|
5/19/2022
|
Partial Approval
|
JOEY BUCHANAN
|
Reinforced Concrete Frame
|
5/23/2022
|
Partial Inspection
|
DAVID TSAU
|
Reinforced Masonry Frame
|
6/1/2022
|
Partial Approval
|
JOEY BUCHANAN
|
Deputy Reinf. Masonry
|
6/3/2022
|
Approved
|
JOEY BUCHANAN
|
Reinforced Concrete Frame
|
7/11/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Structural Steel Frame
|
7/15/2022
|
Partial Approval
|
JOEY BUCHANAN
|
Footing/Foundation/Slab
|
7/21/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Excavation/Setback/Form/Re-Bar
|
7/22/2022
|
Partial Approval
|
JOEY BUCHANAN
|
Reinforced Concrete Frame
|
8/5/2022
|
Partial Inspection
|
DAVID TSAU
|
Drywall Nailing
|
8/8/2022
|
No Access for Inspection
|
DAVID TSAU
|
Drywall Nailing
|
8/8/2022
|
Partial Approval
|
DAVID TSAU
|
Structural Steel Frame
|
8/8/2022
|
Not Ready for Inspection
|
DAVID TSAU
|
Drywall Nailing
|
8/10/2022
|
Partial Approval
|
DAVID TSAU
|
Wall Anchors
|
8/10/2022
|
Not Ready for Inspection
|
DAVID TSAU
|
Excavation/Setback/Form/Re-Bar
|
8/18/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Pre-Inspection
|
8/18/2022
|
Approved
|
JOEY BUCHANAN
|
Floor/Roof Diaphrgm/Shear Wall
|
8/25/2022
|
Conditional Approval
|
JOEY BUCHANAN
|
Pre-Inspection
|
8/25/2022
|
Partial Approval
|
JOEY BUCHANAN
|
Deputy Fireproofing
|
8/31/2022
|
Approved
|
JOEY BUCHANAN
|
Floor/Roof Diaphrgm/Shear Wall
|
8/31/2022
|
Partial Approval
|
JOEY BUCHANAN
|
Pre-Inspection
|
8/31/2022
|
Partial Approval
|
JOEY BUCHANAN
|
Drywall Nailing
|
9/9/2022
|
Partial Approval
|
TED RIES
|
Floor/Roof Diaphrgm/Shear Wall
|
9/9/2022
|
Partial Approval
|
TED RIES
|
Light Gage Steel Frame
|
9/9/2022
|
Partial Approval
|
TED RIES
|
Pre-Inspection
|
9/9/2022
|
Approved
|
TED RIES
|
Structural Steel Frame
|
9/9/2022
|
Partial Approval
|
TED RIES
|
Floor/Roof Diaphrgm/Shear Wall
|
9/21/2022
|
Partial Approval
|
JOEY BUCHANAN
|
Insulation
|
9/21/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Pre-Inspection
|
9/21/2022
|
Approved
|
JOEY BUCHANAN
|
Excavation/Setback/Form/Re-Bar
|
9/26/2022
|
Partial Approval
|
JOEY BUCHANAN
|
Pre-Inspection
|
9/26/2022
|
Approved
|
JOEY BUCHANAN
|
Pre-Inspection
|
9/29/2022
|
Approved
|
JOEY BUCHANAN
|
Floor/Roof Diaphrgm/Shear Wall
|
10/14/2022
|
Partial Approval
|
JOEY BUCHANAN
|
Pre-Inspection
|
10/14/2022
|
Approved
|
JOEY BUCHANAN
|
Floor/Roof Diaphrgm/Shear Wall
|
10/18/2022
|
Partial Approval
|
JOEY BUCHANAN
|
Drywall Nailing
|
10/28/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Pre-Inspection
|
10/28/2022
|
Corrections Issued
|
JOEY BUCHANAN
|
Deputy Fireproofing
|
10/31/2022
|
Approved
|
JOEY BUCHANAN
|
Light Gage Steel Frame
|
11/10/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Pre-Inspection
|
11/10/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Floor/Roof Diaphrgm/Shear Wall
|
12/8/2022
|
Partial Approval
|
JOEY BUCHANAN
|
Pre-Inspection
|
12/8/2022
|
Approved
|
JOEY BUCHANAN
|
Floor/Roof Diaphrgm/Shear Wall
|
12/9/2022
|
Partial Approval
|
JOEY BUCHANAN
|
Pre-Inspection
|
12/12/2022
|
Approved
|
JOEY BUCHANAN
|
Floor/Roof Diaphrgm/Shear Wall
|
12/14/2022
|
Corrections Issued
|
JOEY BUCHANAN
|
Pre-Inspection
|
12/14/2022
|
Approved
|
JOEY BUCHANAN
|
Drywall Nailing
|
12/16/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Floor/Roof Diaphrgm/Shear Wall
|
12/16/2022
|
Partial Approval
|
JOEY BUCHANAN
|
Pre-Inspection
|
12/16/2022
|
Approved
|
AMANUEL BERHE
|
Pre-Inspection
|
12/16/2022
|
Approved
|
JOEY BUCHANAN
|
Drywall Nailing
|
12/19/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Floor/Roof Diaphrgm/Shear Wall
|
12/19/2022
|
Partial Approval
|
JOEY BUCHANAN
|
Pre-Inspection
|
12/19/2022
|
Approved
|
JOEY BUCHANAN
|
Drywall Nailing
|
12/28/2022
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Pre-Inspection
|
12/28/2022
|
Partial Approval
|
JOEY BUCHANAN
|
Pre-Inspection
|
1/10/2023
|
Approved
|
JOEY BUCHANAN
|
Wood Frame
|
1/10/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Deputy Wood Construction
|
1/13/2023
|
Approved
|
JOEY BUCHANAN
|
Floor/Roof Diaphrgm/Shear Wall
|
1/13/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Pre-Inspection
|
1/13/2023
|
Approved
|
JOEY BUCHANAN
|
Pre-Inspection
|
1/18/2023
|
Approved
|
JOEY BUCHANAN
|
Floor/Roof Diaphrgm/Shear Wall
|
1/20/2023
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Pre-Inspection
|
1/20/2023
|
Approved
|
JOEY BUCHANAN
|
Pre-Inspection
|
1/24/2023
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Floor/Roof Diaphrgm/Shear Wall
|
1/31/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Pre-Inspection
|
1/31/2023
|
Approved
|
JOEY BUCHANAN
|
Pre-Inspection
|
2/2/2023
|
Approved
|
JOEY BUCHANAN
|
Insulation
|
2/3/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Pre-Inspection
|
2/3/2023
|
Approved
|
JOEY BUCHANAN
|
Insulation
|
2/7/2023
|
Corrections Issued
|
JOEY BUCHANAN
|
Pre-Inspection
|
2/7/2023
|
Approved
|
JOEY BUCHANAN
|
Deputy Wood Construction
|
2/13/2023
|
Approved
|
JOEY BUCHANAN
|
Floor/Roof Diaphrgm/Shear Wall
|
2/16/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Pre-Inspection
|
2/16/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Pre-Inspection
|
2/21/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Deputy Wood Construction
|
2/23/2023
|
Approved
|
JOEY BUCHANAN
|
Pre-Inspection
|
2/23/2023
|
Corrections Issued
|
JOEY BUCHANAN
|
Pre-Inspection
|
2/24/2023
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Pre-Inspection
|
2/27/2023
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Pre-Inspection
|
2/28/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Insulation
|
3/2/2023
|
Approved
|
JOEY BUCHANAN
|
Pre-Inspection
|
3/2/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Wall Anchors
|
3/2/2023
|
Approved
|
JOEY BUCHANAN
|
Pre-Inspection
|
3/6/2023
|
Corrections Issued
|
JOEY BUCHANAN
|
Pre-Inspection
|
3/7/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Wood Frame
|
3/8/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Pre-Inspection
|
3/10/2023
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Pre-Inspection
|
3/13/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Pre-Inspection
|
3/15/2023
|
Corrections Issued
|
JOEY BUCHANAN
|
Pre-Inspection
|
3/17/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Wall Anchors
|
3/17/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Deputy Wood Construction
|
3/21/2023
|
Approved
|
JOEY BUCHANAN
|
Pre-Inspection
|
3/22/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Wall Anchors
|
3/22/2023
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Pre-Inspection
|
3/23/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Wall Anchors
|
3/23/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Deputy Wood Construction
|
3/24/2023
|
Approved
|
JOEY BUCHANAN
|
Deputy Wood Construction
|
3/28/2023
|
Approved
|
JOEY BUCHANAN
|
Floor/Roof Diaphrgm/Shear Wall
|
3/30/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Pre-Inspection
|
3/30/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Insulation
|
4/3/2023
|
Corrections Issued
|
JOEY BUCHANAN
|
Pre-Inspection
|
4/3/2023
|
Approved
|
JOEY BUCHANAN
|
Insulation
|
4/4/2023
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Insulation
|
4/7/2023
|
Corrections Issued
|
JOEY BUCHANAN
|
Pre-Inspection
|
4/7/2023
|
Approved
|
JOEY BUCHANAN
|
Floor/Roof Diaphrgm/Shear Wall
|
4/11/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Pre-Inspection
|
4/11/2023
|
Approved
|
JOEY BUCHANAN
|
Drywall Nailing
|
4/13/2023
|
Corrections Issued
|
JOEY BUCHANAN
|
Pre-Inspection
|
4/13/2023
|
Approved
|
JOEY BUCHANAN
|
Insulation
|
4/17/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Pre-Inspection
|
4/17/2023
|
Approved
|
JOEY BUCHANAN
|
Insulation
|
4/18/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Pre-Inspection
|
4/18/2023
|
Approved
|
JOEY BUCHANAN
|
Pre-Inspection
|
4/20/2023
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Pre-Inspection
|
4/24/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Insulation
|
4/25/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Pre-Inspection
|
4/28/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Pre-Inspection
|
5/1/2023
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Pre-Inspection
|
5/3/2023
|
Approved
|
JOEY BUCHANAN
|
Pre-Inspection
|
5/4/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Insulation
|
5/12/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Pre-Inspection
|
5/12/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Deputy Wood Construction
|
5/17/2023
|
Approved
|
JOEY BUCHANAN
|
Pre-Inspection
|
5/17/2023
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Pre-Inspection
|
5/19/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Pre-Inspection
|
5/22/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Pre-Inspection
|
5/25/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Deputy Wood Construction
|
5/26/2023
|
Approved
|
JOEY BUCHANAN
|
Insulation
|
5/30/2023
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Insulation
|
5/31/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Floor/Roof Diaphrgm/Shear Wall
|
6/5/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Deputy Wood Construction
|
6/6/2023
|
Approved
|
JOEY BUCHANAN
|
Floor/Roof Diaphrgm/Shear Wall
|
6/6/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Insulation
|
6/7/2023
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Insulation
|
6/12/2023
|
Order to Comply Issued
|
JOEY BUCHANAN
|
Insulation
|
6/16/2023
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Insulation
|
6/21/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Light Gage Steel Frame
|
6/26/2023
|
Partial Inspection
|
AMANUEL BERHE
|
Pre-Inspection
|
6/29/2023
|
Conditional Approval
|
JOEY BUCHANAN
|
Drywall Nailing
|
6/30/2023
|
Not Ready for Inspection
|
AMANUEL BERHE
|
Drywall Nailing
|
7/3/2023
|
Partial Inspection
|
AMANUEL BERHE
|
Drywall Nailing
|
7/5/2023
|
Partial Inspection
|
AMANUEL BERHE
|
Drywall Nailing
|
7/6/2023
|
Partial Inspection
|
AMANUEL BERHE
|
Insulation
|
7/6/2023
|
Not Ready for Inspection
|
AMANUEL BERHE
|
Drywall Nailing
|
7/7/2023
|
Partial Inspection
|
AMANUEL BERHE
|
Drywall Nailing
|
7/10/2023
|
Partial Approval
|
DAVID TSAU
|
Insulation
|
7/14/2023
|
Partial Approval
|
DAVID TSAU
|
Drywall Nailing
|
7/18/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Drywall Nailing
|
7/21/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Insulation
|
7/21/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Drywall Nailing
|
7/25/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Insulation
|
7/28/2023
|
Order to Comply Issued
|
JOEY BUCHANAN
|
Light Gage Steel Frame
|
8/4/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Floor/Roof Diaphrgm/Shear Wall
|
8/11/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Insulation
|
8/18/2023
|
Corrections Issued
|
JOEY BUCHANAN
|
Deputy Steel/Welding
|
8/23/2023
|
Approved
|
JOEY BUCHANAN
|
Special/Order Compliance
|
8/23/2023
|
Approved
|
AMANUEL BERHE
|
Deputy Steel/Welding
|
8/25/2023
|
Conditional Approval
|
AMANUEL BERHE
|
Drywall Nailing
|
8/25/2023
|
Not Ready for Inspection
|
AMANUEL BERHE
|
Insulation
|
8/25/2023
|
Conditional Approval
|
AMANUEL BERHE
|
Deputy Steel/Welding
|
8/28/2023
|
Approved
|
JOEY BUCHANAN
|
Drywall Nailing
|
8/29/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Light Gage Steel Frame
|
8/29/2023
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Deputy Reinf. Concrete
|
9/5/2023
|
Conditional Approval
|
AMANUEL BERHE
|
Insulation
|
9/7/2023
|
Partial Inspection
|
AMANUEL BERHE
|
Insulation
|
9/8/2023
|
Not Ready for Inspection
|
AMANUEL BERHE
|
Insulation
|
9/11/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Deputy Reinf. Concrete
|
9/13/2023
|
Approved
|
JOEY BUCHANAN
|
Excavation/Setback/Form/Re-Bar
|
9/13/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Footing/Foundation/Slab
|
9/13/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Deputy Drilled-In Anchors
|
9/15/2023
|
Approved
|
JOEY BUCHANAN
|
Drywall Nailing
|
9/18/2023
|
Partial Inspection
|
AMANUEL BERHE
|
Insulation
|
9/18/2023
|
Not Ready for Inspection
|
AMANUEL BERHE
|
Light Gage Steel Frame
|
9/18/2023
|
Not Ready for Inspection
|
AMANUEL BERHE
|
Drywall Nailing
|
9/20/2023
|
Corrections Issued
|
JOEY BUCHANAN
|
Drywall Nailing
|
9/25/2023
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Interior/Exterior Lathing
|
9/25/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Light Gage Steel Frame
|
9/25/2023
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Drywall Nailing
|
9/26/2023
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Insulation
|
9/26/2023
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Interior/Exterior Lathing
|
9/26/2023
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Insulation
|
9/28/2023
|
Partial Approval
|
AMANUEL BERHE
|
Insulation
|
10/2/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Deputy Drilled-In Anchors
|
10/3/2023
|
Approved
|
JOEY BUCHANAN
|
Drywall Nailing
|
10/5/2023
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Insulation
|
10/5/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Insulation
|
10/12/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Deputy Reinf. Concrete
|
10/20/2023
|
Approved
|
JOEY BUCHANAN
|
Drywall Nailing
|
10/20/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Light Gage Steel Frame
|
10/26/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Excavation/Setback/Form/Re-Bar
|
10/31/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Excavation/Setback/Form/Re-Bar
|
11/6/2023
|
Approved
|
JOEY BUCHANAN
|
Reinforced Concrete Frame
|
11/6/2023
|
Approved
|
JOEY BUCHANAN
|
Wood Frame
|
11/9/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Light Gage Steel Frame
|
11/14/2023
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Deputy Reinf. Masonry
|
11/17/2023
|
Approved
|
JOEY BUCHANAN
|
Excavation/Setback/Form/Re-Bar
|
11/29/2023
|
Corrections Issued
|
JOEY BUCHANAN
|
Pre-Inspection
|
12/13/2023
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Interior/Exterior Lathing
|
12/15/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Pre-Inspection
|
12/15/2023
|
Partial Approval
|
JOEY BUCHANAN
|
Interior/Exterior Lathing
|
12/22/2023
|
Partial Inspection
|
AMANUEL BERHE
|
Insulation
|
1/3/2024
|
Partial Approval
|
JOEY BUCHANAN
|
Light Gage Steel Frame
|
1/3/2024
|
Partial Approval
|
JOEY BUCHANAN
|
Light Gage Steel Frame
|
1/5/2024
|
Partial Approval
|
JOEY BUCHANAN
|
Drywall Nailing
|
1/18/2024
|
Partial Approval
|
JOEY BUCHANAN
|
Special/Order Compliance
|
1/18/2024
|
Partial Approval
|
JOEY BUCHANAN
|
Floor/Roof Diaphrgm/Shear Wall
|
2/1/2024
|
Partial Approval
|
JOEY BUCHANAN
|
Special/Order Compliance
|
2/1/2024
|
Approved
|
JOEY BUCHANAN
|
Floor/Roof Diaphrgm/Shear Wall
|
2/27/2024
|
Partial Approval
|
JOEY BUCHANAN
|
Special/Order Compliance
|
2/27/2024
|
Approved
|
JOEY BUCHANAN
|
Floor/Roof Diaphrgm/Shear Wall
|
3/5/2024
|
Partial Approval
|
JOEY BUCHANAN
|
Special/Order Compliance
|
3/7/2024
|
Partial Approval
|
JOEY BUCHANAN
|
Deputy Drilled-In Anchors
|
3/14/2024
|
Approved
|
JOEY BUCHANAN
|
Deputy Steel/Welding
|
3/18/2024
|
Approved
|
JOEY BUCHANAN
|
Drywall Nailing
|
4/5/2024
|
Partial Approval
|
AMANUEL BERHE
|
Floor/Roof Diaphrgm/Shear Wall
|
4/26/2024
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
Light Gage Steel Frame
|
4/26/2024
|
Partial Approval
|
JOEY BUCHANAN
|
Drywall Nailing
|
5/20/2024
|
Partial Approval
|
JOEY BUCHANAN
|
Interior/Exterior Lathing
|
7/12/2024
|
Partial Approval
|
JOEY BUCHANAN
|
Interior/Exterior Lathing
|
11/19/2024
|
Approved
|
JOEY BUCHANAN
|
Special/Order Compliance
|
2/3/2025
|
Corrections Issued
|
JOEY BUCHANAN
|