1201 S HOPE ST 90015

Certificate Information: 1201 S HOPE ST 90015

Application / Permit
19047-10000-00170
Plan Check / Job No.
B19LA02124
Group
Building
Type
Swimming-Pool/Spa
Sub-Type
Commercial
Primary Use
(4) Pool/Spa - Public
Work Description
PROPOSED 3 SWIMMING POOLS AND SPAS @ LEVEL 8 (1 POOL, 1 SPA) ; LEVEL 33 (1 POOL , 1 SPA) , LEVEL 41 (1 POOL, 1 SPA)
Permit Issued
Issued on 2/22/2019
Issuing Office
Metro
Current Status
Permit Finaled on 12/31/2019
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 1/31/2019 APPLICANT
Assigned to Plan Check Engineer 2/7/2019 JOHN VASQUEZ
Corrections Issued 2/12/2019 JOHN VASQUEZ
Building Plans Picked Up 2/12/2019 APPLICANT
Quality Review Completed 2/13/2019 JOHN VASQUEZ
Plan Check Approved 2/19/2019 JOHN VASQUEZ
Issued 2/22/2019 LADBS
Permit Finaled 12/30/2019 HAMID PISHEHVAR

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 2/13/2019 ADRIAN SANCHEZ
Green Code Cleared 2/13/2019 JOHN VASQUEZ
Sewer availability Cleared 2/13/2019 ADRIAN SANCHEZ
DAS Clearance Cleared 2/14/2019 JOHN VASQUEZ
Public Swimming Pool approval Cleared 2/19/2019 LACDHS APPROVED

Contact Information

Architect Dikeakos, Christos; Lic. No.: C28024 212-3989 HENNING DR      BURNABY BC, V5C 6N5
Contractor Appealing Pools; Lic. No.: 402998-C53 22647 VENTURA BLVD #522      WOODLAND HILLS, CA 91364
Engineer Cortez, Artedi Baligod; Lic. No.: GE239 7091 LISA LANE      WESTMINSTER, CA 92683
Engineer Inman,, Donald J; Lic. No.: C11888 5131 FOX HILLS AVENUE      BUENA PARK, CA 90621
Engineer O'Keeffe, Michael John; Lic. No.: S4879 1661 W 5TH AVE      VANCOUVER, BC, V6J1N5
Engineer Powers, Brian Frederick; Lic. No.: C75902 2090 WEST 31ST STREET      LOS ANGELES, CA 90018

Inspector Information

KATY RAMIREZ, (213) 213-5353 Office Hours: 7:00-8:00 AM MON-FRI
JEROME BLACKWOOD, (213) 213-5353 Office Hours: 7:00-8:00 AM MON-FRI
PAUL BAZERKANIAN, (213) 213-5353 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Enclosure/Fence 12/17/2019 Approved LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 12/30/2019 Approved HAMID PISHEHVAR
Final 12/30/2019 Permit Finaled HAMID PISHEHVAR
METHANE-Barrier 12/30/2019 Approved HAMID PISHEHVAR
METHANE-Rough 12/30/2019 Approved HAMID PISHEHVAR
METHANE-Subgrade 12/30/2019 Approved HAMID PISHEHVAR
Pre-Gunite 12/30/2019 Approved HAMID PISHEHVAR
SGSOV-Seismic Gas S/O Valve 12/30/2019 SGSOV Approved HAMID PISHEHVAR