2244-2244 1/2 S RIDGELEY DR 90016

Certificate Information: 2244-2244 1/2 S RIDGELEY DR 90016

Application / Permit
21010-10000-03846
Plan Check / Job No.
B21LA14063
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
ePlan NEW 1-STORY, 2 DETACHED ADU's PER STATE LAW CONNECTED IN MIDDLE WITH STAIRS FOR THE ROOFTOP DECK. “The LID clearance has been deferred. Approval for LID requirements shall be obtained from LASAN prior to the issuance of the Certificate of Occupancy.”
Permit Issued
Issued on 3/7/2022
Issuing Office
Current Status
CofO Issued on 9/13/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 7/28/2021 APPLICANT
Assigned to Plan Check Engineer 7/30/2021 VIVIAN LAO
Corrections Issued 7/31/2021 PRANITA SHAH
Applicant returned to address corrections 11/15/2021 JOE VO
Applicant returned to address corrections 11/23/2021 VIVIAN LAO
Applicant returned to address corrections 12/1/2021 VIVIAN LAO
Plan Check Approved 12/7/2021 ZAW HAN
Issued 3/7/2022 APPLICANT
CofO in Progress 9/13/2023 JOSE AVILA
CofO Issued 9/13/2023 DEROLD HAUFF
Permit Finaled 9/13/2023 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 8/12/2021 RENZ SORIANO
Eng Process Fee Ord 176,300 Cleared 8/12/2021 RENZ SORIANO
Hydrant and Access approval Cleared 9/30/2021 RUEL COLE
Roof/Waste drainage to street Cleared 11/10/2021 THAN WIN
Sewer availability Cleared 11/18/2021 PAMELA TENEZA

Contact Information

Contractor Marcos Construction Inc; Lic. No.: 686859-B P O BOX 65552      LOS ANGELES, CA 90065
Engineer Burnazyan,, Gegam; Lic. No.: C76761 5832 JAMIESON AVE      ENCINO, CA 91316

Inspector Information

STUART CHAPMAN, (213) 202-3126 Office Hours: 7:00-8:00 AM MON-FRI
ARTHUR NEGRETE, (213) 202-3126 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 5/10/2022 Approved JOSE AVILA
Footing/Foundation/Slab 5/10/2022 Approved JOSE AVILA
Floor/Roof Diaphrgm/Shear Wall 6/8/2022 Partial Approval JOSE AVILA
Deputy Wood Construction 7/12/2022 Conditional Approval RUBEN SALAS
Floor/Roof Diaphrgm/Shear Wall 7/12/2022 Conditional Approval JOSE AVILA
Wood Frame 7/12/2022 Approved JOSE AVILA
ELECTRICAL-Rough 8/24/2022 Approved JOSE AVILA
BUILDING-Rough-Frame 9/14/2022 Conditional Approval JOSE AVILA
HVAC-Rough 9/14/2022 Partial Approval JOSE AVILA
Interior/Exterior Lathing 9/14/2022 Approved JOSE AVILA
PLUMBING-Rough 9/14/2022 Approved JOSE AVILA
Insulation 10/13/2022 Approved JOSE AVILA
Drywall Nailing 10/19/2022 Approved JOSE AVILA
Sewer 3/10/2023 Approved JOSE AVILA
ELECTRICAL-Final 6/29/2023 Corrections Issued JOSE AVILA
HVAC-Final 6/29/2023 Corrections Issued JOSE AVILA
PLUMBING-Final 6/29/2023 Corrections Issued JOSE AVILA
ELECTRICAL-Final 7/27/2023 Partial Approval ALIZAH MAYAGOITIA
HVAC-Final 7/27/2023 Approved ALIZAH MAYAGOITIA
MERV13>=Final 7/27/2023 Approved ALIZAH MAYAGOITIA
PLUMBING-Final 7/27/2023 Not Ready for Inspection ALIZAH MAYAGOITIA
Service/Power Release 7/27/2023 Not Ready for Inspection ALIZAH MAYAGOITIA
BUILDING-Rough-Frame 8/7/2023 Approved JOSE AVILA
ELECTRICAL-Final 8/7/2023 Approved JOSE AVILA
Final 8/7/2023 Corrections Issued JOSE AVILA
MERV13>=Rough 8/7/2023 Approved JOSE AVILA
PLUMBING-Final 8/7/2023 Approved JOSE AVILA
SGSOV-Seismic Gas S/O Valve 8/7/2023 SGSOV Approved JOSE AVILA
Service/Power Release 8/7/2023 Approved JOSE AVILA
Smoke Detectors 8/7/2023 Approved JOSE AVILA
Verify Sprinkler Sign Off 8/7/2023 Approved JOSE AVILA
Final 9/13/2023 OK to Issue CofO JOSE AVILA